
[]{#02-cast.xhtml}
# Parts Unlimited {.cast-title}
::: block
## Parts Unlimited: Business Executives {.prologue}
Steve Masters, [CEO]{.smallcaps}, acting [CIO]{.smallcaps}
Dick Landry, [CFO]{.smallcaps}
Sarah Moulton, [SVP]{.smallcaps} of Retail Operations
Maggie Lee, Senior Director of Retail Program Management
Bill Palmer, [VP]{.smallcaps} of [IT]{.smallcaps} Operations, former
Director of Midrange Technology Operations
Wes Davis, Director of Distributed Technology Operations
Brent Geller, Lead Engineer
Patty McKee, Director of [IT]{.smallcaps} Service Support
John Pesche, Chief Information Security Officer ([CISO]{.smallcaps})
Chris Allers, [VP]{.smallcaps} of Application Development
:::
[]{#03-prologue.xhtml}
# FOR IMMEDIATE RELEASE {.pr-title}
::: block
Friday, August 29
Company: Parts Unlimited (PAUD)
Rating: SELL
Price Target: \$8 (current \$13)
:::
Effective immediately, Parts Unlimited [CEO,]{.smallcaps_myriad} Steve
Masters, is stepping down from his role as chairman after eight years of
holding that position. Board Director Bob Strauss, who served as company
chairman and [CEO]{.smallcaps_myriad} two decades ago, is returning from
retirement to assume the role of chairman.
Parts Unlimited stock has tumbled 19 percent in the last 30 days under
heavy trading, down 52 percent from its peak three years ago. The
company continues to be outmaneuvered by its arch rival, famous for its
ability to anticipate and instantly react to customer needs. Parts
Unlimited now trails the competition in sales growth, inventory turns
and profitability.
The company has long promised that its "Phoenix" program will restore
profitability and close the gap by tightly integrating its retailing and
e-commerce channels. Already years late, many expect the company to
announce another program delay in its analyst earnings call next month.
We believe that institutional investors such as Wayne-Yokohama pressured
Bob to reconfigure the board as the first of many actions to right the
ship in Elkhart Grove. A growing number of investors are pushing for
more significant leadership changes and strategic options, such as
splitting up the company.
Despite Masters' past achievements that transformed Parts Unlimited into
one of the top automotive parts manufacturers and retailers, we believe
splitting up the chairman and [CEO]{.smallcaps_myriad} roles is long
overdue. Parts Unlimited needs fresh leadership, either from the outside
or from within. We believe Sarah Moulton, [SVP]{.smallcaps_myriad} of
Retail Operations, and a rising star at the company, could just be what
the company needs.
According to our sources, the board has given Strauss and Masters six
months to make dramatic improvements. If they can't pull this off,
expect more changes and turbulent times.
---Kelly Lawrence, Chief Industry Analyst, Nestor Meyers
\###
[]{#04-ch1.xhtml}
# Chapter 1 {.ch-title}
## • Tuesday, September 2 {.dateline}
*"Bill Palmer here,"* I say, answering my cell phone on the first ring.
I'm late, so I'm driving ten miles per hour over the speed limit,
instead of my usual five. I spent the morning at the doctor's office
with my three-year-old son, trying to keep the other toddlers from
coughing on us, constantly being interrupted by my vibrating phone.
The problem of the day is intermittent network outages. As the Director
of Midrange Technology Operations, I'm responsible for the availability
and smooth functioning of a relatively small [IT]{.smallcaps} group at
Parts Unlimited, a \$4 billion per year manufacturing and retail company
based in Elkhart Grove.
Even in the technology backwaters I've chosen to make my turf, I need to
track network issues closely. Because these issues disrupt the services
my group provides, people will blame the outages on me.
"Hi, Bill. This is Laura Beck, from Human Resources." She's not the
person I usually deal with from [HR]{.smallcaps}, but her name and voice
sound familiar...
Holy crap. I try not to swear out loud when I remember who she is. From
the monthly company meetings. She's the [VP]{.smallcaps} in charge of
[HR]{.smallcaps}.
"Good morning, Laura," I say with forced cheer. "What can I do for you?"
She responds, "When will you be in the office? I'd like to meet as soon
as possible."
I hate vague requests to meet. I only do that when I'm trying to
schedule a time to chew someone out. Or fire them.
Wait. Is Laura calling because someone wants to fire me? Was there an
outage I didn't respond to quickly enough? As an [IT]{.smallcaps}
Operations guy, the career-ending outage is the joke my peers and I tell
one another daily.
We agree to meet at her desk in a half hour, but when she doesn't share
any more details, I say in my most cajoling voice, "Laura, what's this
all about? Is there a problem in my group? Or am I the one in trouble?"
I laugh extra loudly, so she hears it over the phone.
"No, it's nothing like that," she says breezily. "You could even say
this is good news. Thanks, Bill."
When she hangs up, I try to think of what good news would even look like
these days. When I can't, I turn the radio back on and immediately hear
a commercial from our largest retailing competitor. They're talking
about their unparalleled customer service and a breathtaking new
offering that allows people to customize their cars with their friends
online.
The ad is brilliant. I'd use the service in a second, if I weren't such
a loyal company man. How do they keep bringing such incredible new
capabilities to market while we remain stuck in the mud?
I turn the radio off. Despite all our hard work and late nights, the
competition keeps leapfrogging us. When our Marketing people hear this
ad, they'll go ballistic. Because they're likely art or music majors,
not people with a technology background, they'll publicly promise the
impossible and [IT]{.smallcaps} will have to figure out how to deliver.
Each year, it gets harder. We have to do more with less, to
simultaneously maintain competitiveness and reduce costs.
Some days, I think that it can't be done. Maybe I spent too much time as
a sergeant in the Marines. You learn that you argue your case as best as
you can with your officer, but sometimes you have to say, "Yes, sir,"
and then go take that hill.
I pull into the parking lot. Three years ago, finding an empty parking
spot was impossible. Now, after all the layoffs, parking is rarely a
problem.
When I walk into Building 5 where Laura and her staff reside, I
immediately notice how nicely furnished it is. I can smell the new
carpeting and there's even classy wood paneling on the walls. Suddenly,
the paint and carpet in my building seem decades overdue for
replacement.
That's [IT]{.smallcaps}'s lot in life. At least we're not in a dingy,
dimly lit dank basement, like in the British [TV]{.smallcaps} show,
*The* [IT]{.smallcaps_italic} *Crowd*.
When I get to Laura's office, she looks up and smiles. "Good seeing you
again, Bill." She extends her hand, which I shake. "Have a seat while I
see whether Steve Masters is available to meet."
Steve Masters? Our [CEO]{.smallcaps}?
She picks up and dials her phone while I sit down, looking around. The
last time I was here was a couple of years ago when [HR]{.smallcaps}
notified us that we needed to dedicate a room for nursing mothers. We
were critically short of office and meeting space, and we had big
project deadlines looming.
We merely wanted to use a conference room in a different building.
However, Wes made it sound like we were a bunch of 1950s *Mad Men*
Neanderthals. Shortly afterward, we were both summoned here for a half
day of political rehabilitation and sensitivity training. Thanks, Wes.
Among other things, Wes is in charge of the networks, which is why I
track network outages so closely.
Laura thanks the person on the other end of the phone and turns back to
me. "Thanks for coming down on short notice. How is your family doing
these days?" she asks.
My brow furrows. If I wanted to chitchat, there are many people I'd
rather talk to than someone in [HR]{.smallcaps}. I force myself to
banter about our families and kids, trying not to think about my other
pressing commitments. Eventually I say, without much grace, "So, what
can I do for you this morning?"
"Of course." She pauses, and then says, "Effective as of this morning,
Luke and Damon are no longer with the company. This went all the way to
the top, with Steve getting involved. He's chosen you to be the
[VP]{.smallcaps} of [IT]{.smallcaps} Operations."
She smiles broadly, holding out her hand again, "You're our newest
[VP]{.smallcaps} in the company, Bill. I think some congratulations are
in order?"
Holy crap. I numbly shake her hand.
No, no, no. The last thing I want is a "promotion."
Luke was our [CIO]{.smallcaps}, or Chief Information Officer. Damon
worked for him and was my boss, in charge of [IT]{.smallcaps} Operations
across the entire company. Both gone, just like that.
I didn't see this coming. There wasn't any chatter on the subspace
radio. Nothing.
For the last decade, like clockwork, new [CIO]{.smallcaps}s would come
and go every two years. They stay just long enough to understand the
acronyms, learn where the bathrooms are, implement a bunch of programs
and initiatives to upset the apple cart, and then they're gone.
[CIO]{.smallcaps} stands for "Career Is Over." And [VP]{.smallcaps}s of
[IT]{.smallcaps} Operations don't last much longer.
I've figured out that the trick to a long career in [IT]{.smallcaps}
Operations management is to get enough seniority to get good things done
but to keep your head low enough to avoid the political battles that
make you inherently vulnerable. I have absolutely no interest in
becoming one of the [VP]{.smallcaps}s who just give each other
PowerPoints all day long.
Fishing for more information, I joke, "Two executives leaving at the
same time? Were they stealing money from the stores late at night?"
She laughs, but quickly returns to her [HR]{.smallcaps}-trained deadpan,
"They both chose to pursue other interests. More than that, you'll have
to find out from them."
As the saying goes, if your colleague tells you they've decided to quit,
it was voluntary. But when someone else tells you they've decided to
quit, it was mandatory.
Ergo, my boss and his boss were just whacked.
This is exactly why I don't want a promotion. I'm extremely proud of the
team I've built over the last ten years. It's not the largest group, but
we're the most organized and dependable, by far. Especially compared to
Wes.
I groan at the thought of managing Wes. He doesn't manage a team---he's
barely one step ahead of a chaotic mob.
As I break out in a cold sweat, I know I will never accept this
promotion.
All this time, Laura has been talking, and I haven't heard a single
word. "---and so we'll obviously need to talk about how we're going to
announce this transition. And Steve wants to see you as soon as
possible."
"Look, thanks for the opportunity. I'm honored. But I don't want this
role. Why would I? I love my current job, and there are tons of
important things that still need to be done."
"I don't think this is optional," she says, looking sympathetic. "This
came straight from Steve. He chose you personally, so you'll have to
talk with him."
I stand up and reiterate firmly, "No, really. Thanks for thinking of me,
but I've already got a great job. Good luck finding someone else."
Minutes later, Laura is walking me to Building 2, the tallest building
on campus. I'm angry at myself for getting sucked into this insanity.
If I run now, I'm pretty sure she wouldn't be able to catch me, but then
what? Steve would just send a whole squad of [HR]{.smallcaps} goons to
fetch me.
I don't say anything, definitely not feeling like small talk anymore.
Laura doesn't seem to care, walking briskly beside me, nose buried in
her phone, occasionally gesturing directions.
She finds Steve's office without ever looking up, obviously having made
this walk many times before.
This floor is warm and inviting, furnished just like it was in the
1920s, when the building was constructed. With dark hardwood floors and
stained glass windows, it's from an era when everyone wore suits and
smoked cigars in their offices. The company was booming then---Parts
Unlimited made various widgets inside almost every make of automobile,
when horses were being vanquished from daily life.
Steve has a corner office, where a no-nonsense woman is keeping guard.
She's about forty, radiating cheerfulness and a sense of organization
and order. Her desk is tidy, with Post-it notes everywhere on the wall.
There's a coffee mug with the words "Don't Mess With Stacy" by her
keyboard.
"Hi, Laura," she says, looking up from her computer. "Busy day, huh? So,
this is Bill?"
"Yep. In the flesh," Laura replies, smiling.
To me she says, "Stacy keeps Steve in line. You'll grow to know her
well, I suspect. You and I can finish up later." Then she leaves.
Stacy smiles at me. "Pleasure. I've heard a lot about you already. Steve
is expecting you." She points to his door.
I immediately like her. And I think about what I've just learned. It's
been a busy day for Laura. Stacy and Laura are on very familiar terms.
Steve has [HR]{.smallcaps} on speed dial. Apparently, people who work
for Steve don't last long.
Great.
Walking in, I'm a little surprised to find Steve's office looks just
like Laura's. It's the same size as my boss' office---or rather, my
ex-boss' office---and potentially my new office if I'm stupid, which I
am not.
Maybe I was expecting Persian rugs, water fountains, and large
sculptures everywhere. Instead, there are photos on the wall of a small
propeller airplane, his smiling family, and, to my surprise, one of him
in a US Army uniform on a runway somewhere tropical. I note with
surprise the insignia visible on his lapels.
So, Steve was a major.
He is sitting behind his desk, scrutinizing what appear to be paper
spreadsheets. There's a laptop open behind him, displaying a browser
full of stock graphs.
"Bill, good to see you again," he says, standing and shaking my hand.
"It's been a long time. About five years, right? It was after you pulled
off that amazing project to integrate one of the manufacturing
acquisitions. I trust life has been treating you well?"
I'm surprised and a bit flattered that he remembered our brief
interaction, especially when it was so long ago. I smile in return,
saying, "Yes, very well, thank you. I'm amazed you remember something so
far back."
"You think we give out awards like that to just anyone?" he says
earnestly. "That was an important project. To make that acquisition pay
off, we needed to nail it, which you and your team did superbly.
"I'm sure Laura has told you a bit about the organizational changes I've
made. You know Luke and Damon are no longer with the company. I intend
to fill the [CIO]{.smallcaps} position eventually, but in the meantime,
all of [IT]{.smallcaps} will report to me."
He continues, brisk and businesslike, "However, with Damon's departure,
I have an organizational hole I need to fill. Based on our research,
you're clearly the best candidate to take over as [VP]{.smallcaps} of
[IT]{.smallcaps} Operations."
As if he just remembered, he says, "You were a Marine. When and where?"
I announce automatically, "22nd Marine Expeditionary Unit. Sergeant. I
was in for six years but never saw combat."
Remembering how I joined the Marines as a cocky eighteen-year-old, I say
with a small smile, "The Corps really straightened me out---I owe them a
lot, but I sure hope neither of my sons join under the same conditions I
did."
"I bet," Steve laughs. "I was in the Army for eight years myself,
slightly longer than I was obligated to. But I didn't mind.
[ROTC]{.smallcaps} was the only way I could pay for college, and they
treated me well."
He adds, "They didn't coddle us like they did you Marines, but I still
can't complain."
I laugh, finding myself liking him. This is the longest interaction
we've had. I suddenly wonder if this is what politicians are like.
I try to stay focused on why he summoned me here: He's going to ask me
to undertake some kamikaze mission.
"Here's the situation," he says, motioning me to have a seat at his
conference table. "As I'm sure you're aware, we must regain
profitability. To do that, we need to increase our market share and
average order sizes. Our retail competitors are kicking our ass. The
whole world knows this, which is why our stock price is half what it was
three years ago."
He continues, "Project Phoenix is essential to closing the gap with the
competition, so we can finally do what the competition has been doing
for years. Customers need to be able to buy from us from wherever they
want, whether it's on the Internet or in our retail stores. Otherwise,
we'll soon have no customers, at all."
I nod. I might be in the technology backwaters, but my team has been
involved with Phoenix for years. Everyone knows how important it is.
"We're years late delivering," he continues. "Our investors and Wall
Street are howling. And now, my board is losing confidence in our
ability to hit our commitments.
"I'll be blunt," he says. "The way things are going, I'll be out of a
job in six months. As of last week, Bob Strauss, my old boss, is the new
chairman of the company. There's a vocal group of shareholders trying to
split up the company, and I don't know how much longer we can fend them
off. What's at stake here is not just my job, but the nearly four
thousand employees who work here at Parts Unlimited."
Suddenly, Steve looks much older than the early fifties I had guessed
him to be. Looking right at me, he says, "As acting [CIO]{.smallcaps},
Chris Allers, our [VP]{.smallcaps} of Application Development, will
report to me. And so will you."
He stands up and starts to pace, "I need you to keep all the things that
are supposed to be up, well, up. I need someone reliable, who isn't
afraid to tell me bad news. Above all, I need someone I can trust to do
the right thing. That integration project had many challenges, but you
always kept a cool head. You've built a reputation as someone who is
dependable, pragmatic, and willing to say what you really think."
He's been candid with me, so I reply with the same. "Sir, with all due
respect, it seems very difficult for senior [IT]{.smallcaps} leadership
to succeed here. Any request for budget or staff is always shot down,
and executives are replaced so quickly, some never even get a chance to
fully unpack."
With finality, I say, "Midrange Operations is critical to getting
Phoenix done, too. I need to stay there to see those things through to
completion. I appreciate you thinking of me, but I can't accept.
However, I promise I'll keep my eyes open for any good candidates."
Steve looks at me appraisingly, his expression surprisingly grave.
"We've had to cut budgets across the entire company. That edict came
straight from my board. My hands were tied. I won't make promises I
can't keep, but I can promise you I'll do whatever it takes to support
you and your mission.
"Bill, I know you didn't ask for this job, but the company's survival is
at stake here. I need you to help me save this great company. Can I
count on you?"
Oh, come on.
Before I can politely decline again, I suddenly hear myself saying,
"Yes, sir, you can count on me."
------------------------------------------------------------------------
*I panic,* realizing that Steve somehow used some Jedi mind trick on me.
I force myself to stop talking, before I make more dumb promises.
"Congratulations," Steve says, standing up and shaking my hand firmly.
He clasps my shoulder. "I knew you'd do the right thing. On behalf of
the entire executive team, we're grateful for you stepping up."
I look at his hand grasping mine, wondering if I can backpeddle my way
out.
Not a chance in hell, I decide.
Swearing to myself, I say, "I'll do my best, sir. And could you at least
explain why no one who accepts this position lasts very long? What do
you want most from me? And what don't you want?"
With a resigned half smile, I add, "If I fail, I'll try to make sure
it's in a new and novel way."
"I like that!" Steve says, laughing loudly. "What I want is for
[IT]{.smallcaps} to keep the lights on. It should be like using the
toilet. I use the toilet and, hell, I don't ever worry about it not
working. What I don't want is to have the toilets back up and flood the
entire building." He smiles broadly at his own joke.
Great. In his mind, I'm a glorified janitor.
He continues, "You have a reputation of running the tightest ship in the
[IT]{.smallcaps} organization. So I'm giving you the entire fleet. I
expect you to make them all run the same way.
"I need Chris focused on Phoenix execution. Anything in your area of
responsibility that takes focus away from Phoenix is unacceptable. That
applies not just to you and Chris, but everyone else in this company. Is
that clear?"
"Absolutely," I say, nodding. "You want the [IT]{.smallcaps} systems to
be reliable and available, and for the business to be able to depend
upon them. You want disruptions to normal operations kept to an absolute
minimum so that the business can focus on getting Phoenix done."
Looking surprised, Steve nods. "Exactly. Yes, well put. Whatever you
said, that's exactly what I want."
He hands me an e-mail printout from Dick Landry, the [CFO]{.smallcaps}.
::: block
From: Dick Landry
To: Steve Masters
Date: September 2, 8:27 [AM]{.smallcaps_myriad}
Priority: Highest
Subject: [ACTION NEEDED]{.smallcaps_myriad}: payroll run is failing
Hey, Steve. We've got serious issues with this week's payroll. We're
trying to figure out if the problem is with the numbers or in the
payroll system. Either way, thousands of employees have paychecks stuck
in system & are at risk of not getting paid. Seriously bad news.
We must fix this before payroll window closes at 5
[PM]{.smallcaps_myriad} today. Please advise on how to escalate this,
given the new [IT]{.smallcaps_myriad} org.
Dick
:::
I wince. Employees not getting paychecks means families not being able
to pay their mortgages or put food on the table.
Suddenly, I realize that my family's mortgage payment is due in four
days, and we could be one of the families affected. A late mortgage
payment could screw up our credit rating even more, which we spent years
repairing after we put Paige's student loans on my credit card.
"You want me to jump on this and manage the incident to conclusion?"
Steve nods, giving me the thumbs-up. "Keep me posted on the progress,
please." His expression turns grave. "Every responsible company takes
care of its employees. Many of our factory workers live from paycheck to
paycheck. Do not create hardship for their families, you hear? This
could get us in trouble with the union, maybe even triggering a
work-stoppage, creating some very bad press for us."
I nod automatically. "Restore critical business operations and keep us
out of the front-page news. Got it. Thanks."
Why, exactly, I'm thanking him is not clear.
[]{#05-ch2.xhtml}
# Chapter 2 {.ch-title}
## • Tuesday, September 2 {.dateline}
*"How'd it go in there?"* Stacy asks kindly, looking up from her
keyboard.
I just shake my head. "I can't believe it. He just talked me into taking
a new job I don't want. How did that happen?"
"He can be very persuasive," she says. "For what it's worth, he's
one-of-a-kind. I've worked for him for nearly ten years, and I'll follow
him anywhere. Anything I can help with to make your job easier?"
Thinking for a moment, I ask, "There's an urgent payroll issue that
needs to be fixed. Dick Landry is on floor three, right?"
"Here you go," she says, before I've finished asking my question,
handing me a Post-it note with all of Dick's contact information. Office
location, phone numbers, and everything.
Grateful, I smile at her. "Thanks a lot---you are fantastic!"
I dial Dick's cell phone on my way to the elevator. "Dick here," he
answers gruffly, still typing in the background.
"This is Bill Palmer. Steve just made me the new [VP]{.smallcaps} of
[IT]{.smallcaps} Operations, and he asked me to---"
"Congratulations," he interrupts. "Now look, my people found a huge
payroll irregularity. When can you get to my office?"
"Right away," I reply. I hear the click of him ending the call. I've had
warmer welcomes.
On the third floor, I walk through Finance and Accounting, surrounded by
pinstriped shirts and starched collars. I find Dick at his desk, still
on the phone with someone. When he sees me, he puts his hand over the
mouthpiece. "You from [IT]{.smallcaps}?" he asks gruffly.
When I nod, he says into the phone, "Look, I gotta run. Someone who's
supposedly going to help is finally here. I'll call you back." Without
waiting for an answer, he hangs up the phone.
I've never actually seen someone who routinely hangs up on people. I
brace myself for a conversation that is likely to be short on any
comforting "let's get to know each other" foreplay.
As if in a hostage situation, I slowly raise my hands, showing Dick the
printed e-mail. "Steve just told me about the payroll outage. What's the
best way for me to get some situational awareness here?"
"We're in deep kimchi," Dick responds. "In yesterday's payroll run, all
of the records for the hourly employees went missing. We're pretty sure
it's an [IT]{.smallcaps} issue. This screwup is preventing us from
paying our employees, violating countless state labor laws, and, no
doubt, the union is going to scream bloody murder."
He mutters under his breath for a moment. "Let's go see Ann, my
Operations Manager. She's been pulling her hair out since yesterday
afternoon."
Walking quickly to keep up, I nearly run into him when he stops and
peers through a conference room window. He opens the door. "How's it
going in here, Ann?"
There are two well-dressed women in the room: one, around forty-five
years old, studies the whiteboard, filled with flowcharts and a lot of
tabulated numbers, and the other, in her early thirties, types on a
laptop. Spreadsheets are strewn all over the large conference room
table. The older woman gestures with an open marker at what appears to
be a list of potential failure causes.
Something about the way they dress, and their concerned and irritated
expressions, makes me think they were recruited from a local accounting
firm. Ex-auditors. Good to have them on our side, I suppose.
Ann shakes her head in exhausted frustration. "Not much progress, I'm
afraid. We're almost certain this is an [IT]{.smallcaps} systems failure
in one of the upstream timekeeping systems. All of the hourly factory
worker records got screwed up in the last upload---"
Dick interrupts her. "This is Bill from [IT]{.smallcaps}. He's been
assigned to fix this mess or die trying, is what I think he said."
I say, "Hi, guys. I've just been made the new head of [IT]{.smallcaps}
Operations. Can you start from the beginning and tell me what you know
about the problem?"
Ann walks over to the flowchart on the whiteboard. "Let's start with the
information flow. Our financial system gets payroll data from all our
various divisions in different ways. We roll up all the numbers for
salaried and hourly personnel, which includes wages and taxes. Sounds
easy, but it's extremely complex, because each state has different tax
tables, labor laws, and so forth.
"To make sure something doesn't get screwed up," she continues, "we make
sure the summarized numbers match the detailed numbers from each
division."
As I hurriedly jot down some notes, she continues, "It's a pretty clunky
and manual process. It works most of the time, but yesterday we
discovered that the general ledger upload for hourly production staff
didn't come through. All of the hourlies had zeroes for their hours
worked and amount due.
"We've had so many problems with this particular upload," she says,
obviously frustrated, "that [IT]{.smallcaps} gave us a program that we
use to do manual corrections, so we don't have to bother them anymore."
I wince. I don't like finance personnel manually changing payroll data
outside the payroll application. It's error-prone and dangerous. Someone
could copy that data onto a [USB]{.smallcaps} drive or e-mail it outside
of the organization, which is how organizations lose sensitive data.
"Did you say all the numbers for salaried employees are okay?" I ask.
"That's right," she replies.
"But hourly employees are all zeroes," I confirm.
"Yep," she again replies.
Interesting. I ask, "Why do you think the payroll run failed when it was
working before? Have you had problems like this in the past?"
She shrugs. "Nothing like this has happened before. I have no idea what
could have caused it---no major changes were scheduled for this pay
period. I've been asking the same questions, but until we hear from the
[IT]{.smallcaps} guys, we're stuck dead in the water."
"What is our backup plan," I ask, "if things are so hosed that we can't
get the hourly employee data in time?"
"For crying out loud," Dick says. "It's in that e-mail you're holding.
The deadline for electronic payments is 5 p.m., today. If we can't hit
that window, we may have to FedEx bales of paper checks to each of our
facilities for them to distribute to employees!"
I frown at this scenario and so does the rest of the finance team.
"That won't work," Ann says, clicking a marker on her teeth. "We've
outsourced our payroll processing. Each pay period, we upload the
payroll data to them, which they then process. In the worst case, maybe
we download the previous payroll run, modify it in a spreadsheet, and
then re-upload it?
"But because we don't know how many hours each employee worked, we don't
know how much to pay them!" she continues. "We don't want to overpay
anyone, but that's better than accidentally underpaying them."
It's obvious that plan B is fraught with problems. We' d basically be
guessing at people's paychecks, as well as paying people who were
terminated, and not paying people who were newly hired.
To get Finance the data they need, we may have to cobble together some
custom reports, which means bringing in the application developers or
database people.
But that's like throwing gasoline on the fire. Developers are even worse
than networking people. Show me a developer who isn't crashing
production systems, and I'll show you one who can't fog a mirror. Or
more likely, is on vacation.
Dick says, "These are two lousy options. We could delay our payroll run
until we have the correct data. But we can't do this---even if we're
only a day late, we'll have the union stepping in. So, that leaves Ann's
proposal of paying our employees something, even if it's the incorrect
amount. We' d have to adjust everyone's paycheck in the next pay period.
But now we have a financial reporting error that we've got to go back
and fix."
He pinches the bridge of his nose and continues to ramble. "We'll have a
bunch of odd journal entries in our general ledger, just when our
auditors are here for our [SOX]{.smallcaps}-404 audits. When they see
this, they'll *never* leave.
"Oh, man. A financial reporting error?" Dick mutters. "We'll need
approval from Steve. We're going to have auditors camped out here until
the cows come home. No one'll ever get any real work done again."
[SOX]{.smallcaps}-404 is short for the Sarbanes-Oxley Act of 2002, which
Congress enacted in response to the accounting failures at Enron,
WorldCom, and Tyco. It means the [CEO]{.smallcaps} and [CFO]{.smallcaps}
have to personally sign their names, attesting that their company's
financial statements are accurate.
Everyone longs for the days when we didn't spend half our time talking
to auditors, complying with each new regulatory requirement *du jour*.
I look at my notes and then at the clock. Time is running out.
"Dick, based on what I've heard, I recommend that you continue to plan
for the worst and we fully document plan B, so we can pull it off
without further complications. Furthermore, I request that we wait until
3 p.m. before making a decision. We may be still able to get all the
systems and data back."
When Ann nods, Dick says, "Okay, you've got four hours."
I say, "Rest assured that we understand the urgency of the situation and
that you'll be apprised of how it's going as soon as I find out myself."
"Thanks, Bill," Ann says. Dick remains silent as I turn around and walk
out the door.
I feel better, now that I've seen the problem from the business
perspective. It's now time to get under the covers and find out what
broke the complex payroll machinery.
While walking down the stairs, I dig out my phone and scan my e-mails.
My feeling of calm focus disappears when I see that Steve hasn't sent
out an announcement of my promotion. Wes Davis and Patty McKee, who
until today were my peers, still have no idea that I'm now their new
boss.
Thanks, Steve.
When I enter Building 7, it hits me. Our building is the ghetto of the
entire Parts Unlimited campus.
It was built in the 1950s, and last remodeled in the 1970s, obviously
built for utility, not aesthetics. Building 7 used to be our large
brake-pad manufacturing factory until it was converted into data center
and office space. It looks old and neglected.
The security guard says cheerfully, "Hello, Mr. Palmer. How is the
morning going so far?"
For a moment, I'm tempted to ask him to wish me luck, so he can get paid
the correct amount this week. Of course, I merely return his friendly
greeting.
I'm headed toward the Network Operations Center, or as we call it, the
[NOC]{.smallcaps}, where Wes and Patty are most likely to be. They're
now my two primary managers.
Wes is Director of Distributed Technology Operations. He has technical
responsibility for over a thousand Windows servers, as well as the
database and networking teams. Patty is the Director of [IT]{.smallcaps}
Service Support. She owns all the level 1 and 2 help desk technicians
who answer the phones around the clock, handling break-fix issues and
support requests from the business. She also owns some of the key
processes and tools that the entire [IT]{.smallcaps} Operations
organization relies upon, like the trouble ticketing system, monitoring,
and running the change management meetings.
I walk past rows upon rows of cubicles, the same as every other
building. However, unlike Buildings 2 and 5, I see peeling paint and
dark stains seeping through the carpet.
This part of the building was built on top of what used to be the main
assembly floor. When they converted it, they couldn't get all the
machine oil cleaned up. No matter how much sealant we put down to coat
the floors, oil still has a tendency to seep through the carpet.
I make a note to put in a budget request to replace the carpets and
paint the walls. In the Marines, keeping the barracks neat and tidy was
not only for aesthetics but also for safety.
Old habits die hard.
I hear the [NOC]{.smallcaps} before I see it. It's a large bullpen area,
with long tables set up along one wall, displaying the status of all the
various [IT]{.smallcaps} services on large monitors. The level 1 and 2
help desk people sit at the three rows of workstations.
It's not exactly like mission control in *Apollo 13*, but that's how I
explain it to my relatives.
When something hits the fan, you need all the various stakeholders and
technology managers to communicate and coordinate until the problem is
resolved. Like now. At the conference table, fifteen people are in the
midst of a loud and heated discussion, huddled around one of the classic
gray speakerphones that resembles a [UFO]{.smallcaps}.
Wes and Patty are sitting next to each other at the conference table, so
I walk behind them to listen in. Wes leans back in his chair with his
arms crossed over his stomach. They don't get all the way across. At six
feet three inches tall and over 250 pounds, he casts a shadow on most
people. He seems to be in constant motion and has a reputation of saying
whatever is on his mind.
Patty is the complete opposite. Where Wes is loud, outspoken, and shoots
from the hip, Patty is thoughtful, analytical, and a stickler for
processes and procedures. Where Wes is large, combative, and sometimes
even quarrelsome, Patty is elfin, logical, and levelheaded. She has a
reputation for loving processes more than people and is often in the
position of trying to impose order on the chaos in [IT]{.smallcaps}.
She's the face of the entire [IT]{.smallcaps} organization. When things
go wrong in [IT]{.smallcaps}, people call Patty. She's our professional
apologist, whether it's services crashing, web pages taking too long to
load, or, as in today's case, missing or corrupted data.
They also call Patty when they need their work done---like upgrading a
computer, changing a phone number, or deploying a new application. She
does all of the scheduling, so people are always lobbying her to get
their work done first. She'll then hand it off to people who do the
work. For the most part, they live in either my old group or in Wes'
group.
Wes pounds the table, saying, "Just get the vendor on the phone and tell
them that unless they get a tech down here pronto, we're going to the
competition. We're one of their largest customers! We should probably
have abandoned that pile of crap by now, come to think of it."
He looks around and jokes, "You know the saying, right? The way you can
tell a vendor is lying is when their lips are moving."
One of the engineers across from Wes says, "We have them on the phone
right now. They say it'll be at least four hours before their
[SAN]{.smallcaps} field engineer is on-site."
I frown. Why are they talking about the [SAN]{.smallcaps}? Storage area
networks provide centralized storage to many of our most critical
systems, so failures are typically global: It won't be just one server
that goes down; it'll be hundreds of servers that go down all at once.
While Wes starts arguing with the engineer, I try to think. Nothing
about this payroll run failure sounds like a [SAN]{.smallcaps} issue.
Ann suggested that it was probably something in the timekeeping
applications supporting each plant.
"But after we tried to rollback the [SAN]{.smallcaps}, it stopped
serving data entirely," another engineer says. "Then the display started
displaying everything in kanji! Well, we think it was kanji. Whatever it
was, we couldn't make heads or tails of those little pictures. That's
when we knew we needed to get the vendor involved."
Although I'm joining late, I'm convinced we're totally on the wrong
track.
I lean in to whisper to Wes and Patty, "Can I get a minute with you guys
in private?"
Wes turns and, without giving me his full attention, says loudly, "Can't
it wait? In case you haven't noticed, we're in the middle of a huge
issue here."
I put my hand firmly on his shoulder. "Wes, this is really important.
It's about the payroll failure and concerns a conversation I just had
with Steve Masters and Dick Landry."
He looks surprised. Patty is already out of her chair. "Let's use my
office," she says, leading the way.
Following Patty into her office, I see a photo on her wall of her
daughter, who I'd guess is eleven years old. I'm amazed at how much she
looks like Patty---fearless, incredibly smart, and formidable---in a way
that is a bit scary in such a cute little girl.
In a gruff voice, Wes says, "Okay, Bill, what's so important that you
think is worth interrupting a Sev 1 outage in progress?"
That's not a bad question. Severity 1 outages are serious
business-impacting incidents that are so disruptive, we typically drop
everything to resolve them. I take a deep breath. "I don't know if
you've heard, but Luke and Damon are no longer with the company. The
official word is that they've decided to take some time off. More than
that, I don't know."
The surprised expressions on their faces confirm my suspicions. They
didn't know. I quickly relate the events of the morning. Patty shakes
her head, uttering a tsk-tsk in disapproval.
Wes looks angry. He worked with Damon for many years. His face reddens.
"So now we're supposed to take orders from you? Look, no offense, pal,
but aren't you a little out of your league? You've managed the midrange
systems, which are basically antiques, for years. You created a nice
little cushy job for yourself up there. And you know what? You have
absolutely no idea how to run modern distributed systems---to you, the
1990s is still the future!
"Quite frankly," he says, "I think your head would explode if you had to
live with the relentless pace and complexity of what I deal with every
day."
I exhale, while counting to three. "You want to talk to Steve about how
you want my job? Be my guest. Let's get the business what they need
first and make sure that everyone gets paid on time."
Patty responds quickly, "I know you weren't asking me, but I agree that
the payroll incident needs to be our focus." She pauses and then says,
"I think Steve made a good choice. Congratulations, Bill. When can we
talk about a bigger budget?"
I flash her a small smile and a nod of thanks, returning my gaze to Wes.
A couple moments go by, and expressions I can't quite decipher cross his
face. Finally he relents, "Yeah, fine. And I will take you up on your
offer to talk to Steve. He's got a lot of explaining to do."
I nod. Thinking about my own experience with Steve, I genuinely wish Wes
luck if he actually decides to have a showdown with him.
"Thank you for your support, guys. I appreciate it. Now, what do we know
about the failure---or failures? What's all this about some
[SAN]{.smallcaps} upgrade yesterday? Are they related?"
"We don't know," Wes shakes his head. "We were trying to figure that out
when you walked in. We were in the middle of a [SAN]{.smallcaps}
firmware upgrade yesterday when the payroll run failed. Brent thought
the [SAN]{.smallcaps} was corrupting data, so he suggested we back out
the changes. It made sense to me, but as you know, they ended up
bricking it."
Up until now, I've only heard "bricking" something in reference to
breaking something small, like when a cell phone update goes bad. Using
it to refer to a million-dollar piece of equipment where all our
irreplaceable corporate data are stored makes me feel physically ill.
Brent works for Wes. He's always in the middle of the important projects
that [IT]{.smallcaps} is working on. I've worked with him many times.
He's definitely a smart guy but can be intimidating because of how much
he knows. What makes it worse is that he's right most of the time.
"You heard them," Wes says, gesturing toward the conference table where
the outage meeting continues unabated. "The [SAN]{.smallcaps} won't
boot, won't serve data, and our guys can't even read any of the error
messages on the display because they're in some weird language. Now
we've got a bunch of databases down, including, of course, payroll."
"To work the [SAN]{.smallcaps} issue, we had to pull Brent off of a
Phoenix job we promised to get done for Sarah," Patty says ominously.
"There's going to be hell to pay."
"Uh-oh. What exactly did we promise her?" I ask, alarmed.
Sarah is the [SVP]{.smallcaps} of Retail Operations, and she also works
for Steve. She has an uncanny knack for blaming other people for her
screwups, especially [IT]{.smallcaps} people. For years, she's been able
to escape any sort of real accountability.
Although I've heard rumors that Steve is grooming her as his
replacement, I've always discounted that as being totally impossible.
I'm certain that Steve can't be blind to her machinations.
"Sarah heard from someone that we were late getting a bunch of virtual
machines over to Chris," she replies. "We dropped everything to get on
it. That is, until we had to drop everything to fix the
[SAN]{.smallcaps}."
Chris Allers, our [VP]{.smallcaps} of Application Development, is
responsible for developing the applications and code that the business
needs, which then get turned over to us to operate and maintain. Chris'
life is currently dominated by Phoenix.
I scratch my head. As a company, we've made a huge investment in
virtualization. Although it looks uncannily like the mainframe operating
environment from the 1960s, virtualization changed the game in Wes'
world. Suddenly, you don't have to manage thousands of physical servers
anymore. They're now logical instances inside of one big-iron server or
maybe even residing somewhere in the cloud.
Building a new server is now a right-click inside of an application.
Cabling? It's now a configuration setting. But despite the promise that
virtualization was going to solve all our problems, here we are---still
late in delivering a virtual machine to Chris.
"If we need Brent to work the [SAN]{.smallcaps} issue, keep him there.
I'll handle Sarah," I say. "But if the payroll failure was caused by the
[SAN]{.smallcaps}, why didn't we see more widespread outages and
failures?"
"Sarah is definitely going to be one unhappy camper. You know, suddenly
I don't want your job anymore," Wes says with a loud laugh. "Don't get
yourself fired on your first day. They'll probably come for me next!"
Wes pauses to think. "You know, you have a good point about the
[SAN]{.smallcaps}. Brent is working the issue right now. Let's go to his
desk and see what he thinks."
Patty and I both nod. It's a good idea. We need to establish an accurate
timeline of relevant events. And so far, we're basing everything on
hearsay.
That doesn't work for solving crimes, and it definitely doesn't work for
solving outages.
[]{#06-ch3.xhtml}
# Chapter 3 {.ch-title}
## • Tuesday, September 2 {.dateline}
*I follow Patty and Wes* as they walk past the [NOC]{.smallcaps}, into
the sea of cubicles. We end up in a giant workspace created by combining
six cubicles. A large table sits against one wall with a keyboard and
four [LCD]{.smallcaps} monitors, like a Wall Street trading desk. There
are piles of servers everywhere, all with blinking lights. Each portion
of the desk is covered by more monitors, showing graphs, login windows,
code editors, Word documents, and countless applications I don't
recognize.
Brent types away in a window, oblivious to everything around him. From
his phone, I hear the [NOC]{.smallcaps} conference line. He obviously
doesn't seem worried that the loud speakerphone might bother his
neighbors.
"Hey, Brent. You got a minute?" Wes asks loudly, putting a hand on his
shoulder.
"Can it wait?" Brent replies without even looking up. "I'm actually kind
of busy right now. Working the [SAN]{.smallcaps} issue, you know?"
Wes grabs a chair. "Yeah, that's what we're here to talk about."
When Brent turns around, Wes continues, "Tell me again about last night.
What made you conclude that the [SAN]{.smallcaps} upgrade caused the
payroll run failure?"
Brent rolls his eyes, "I was helping one of the [SAN]{.smallcaps}
engineers perform the firmware upgrade after everybody went home. It
took way longer than we thought---nothing went according to the tech
note. It got pretty hairy, but we finally finished around seven o'
clock.
"We rebooted the [SAN]{.smallcaps}, but then all the self-tests started
failing. We worked it for about fifteen minutes, trying to figure out
what went wrong. That's when we got the e-mails about the payroll run
failing. That's when I said, 'Game Over.'
"We were just too many versions behind. The [SAN]{.smallcaps} vendor
probably never tested the upgrade path we were going down. I called you,
telling you I wanted to pull the plug. When you gave me the nod, we
started the rollback.
"That's when the [SAN]{.smallcaps} crashed," he says, slumping in his
chair. "It not only took down payroll but a bunch of other servers,
too."
"We've been meaning to upgrade the [SAN]{.smallcaps} firmware for years,
but we never got around to it," Wes explains, turning to me. "We came
close once, but then we couldn't get a big enough maintenance window.
Performance has been getting worse and worse, to the point where a bunch
of critical apps were being impacted. So finally, last night, we decided
to just bite the bullet and do the upgrade."
I nod. Then, my phone rings.
It's Ann, so I put her on speakerphone.
"As you suggested, we looked at the data we pulled from the payroll
database yesterday. The last pay period was fine. But for this pay
period, all the Social Security numbers for the factory hourlies are
complete gibberish. And all their hours worked and wage fields are
zeroes, too. No one has ever seen anything like this before."
"Just one field is gibberish?" I ask, raising my eyebrows in surprise.
"What do you mean by 'gibberish'? What's in the fields?"
She tries to describe what she's seeing on her screen. "Well, they're
not numbers or letters. There's some hearts and spades and some squiggly
characters... And there's a bunch of foreign characters with umlauts...
And there are no spaces. Is that important?"
When Brent snickers as he hears Ann trying to read line noise aloud, I
give him a stern glance. "I think we've got the picture," I say. "This
is a very important clue. Can you send the spreadsheet with the
corrupted data to me?"
She agrees. "By the way, are a bunch of databases down now? That's
funny. They were up last night."
Wes mutters something under his breath, silencing Brent before he can
say anything.
"Umm, yes. We're aware of the problem and we're working it, too," I
deadpan.
When we hang up, I breathe a sigh of relief, taking a moment to thank
whatever deity protects people who fight fires and fix outages.
"Only one field corrupted in the database? Come on, guys, that
definitely doesn't sound like a [SAN]{.smallcaps} failure." I say.
"Brent, what else was going on yesterday, besides the [SAN]{.smallcaps}
upgrade, that could have caused the payroll run to fail?"
Brent slouches in his chair, spinning it around while he thinks. "Well,
now that you mention it... A developer for the timekeeping application
called me yesterday with a strange question about the database table
structure. I was in the middle of working on that Phoenix test
[VM]{.smallcaps}, so I gave him a really quick answer so I could get
back to work. You don't suppose he did something to break the app, do
you?"
Wes turns quickly to the speakerphone dialed into the [NOC]{.smallcaps}
conference call that has been on this whole time and unmutes the phone.
"Hey, guys, it's Wes here. I'm with Brent and Patty, as well as with our
new boss, Bill Palmer. Steve Masters has put him charge of all of
[IT]{.smallcaps} Ops. So listen up, guys."
My desire for an orderly announcement of my new role seems less and less
likely.
Wes continues, "Does anyone know anything about a developer making any
changes to the timekeeping application in the factories? Brent says he
got a call from someone who asked about changing some database tables."
From the speakerphone, a voice pipes up, "Yeah, I was helping someone
who was having some connectivity issues with the plants. I'm pretty sure
he was a developer maintaining the timekeeping app. He was installing
some security application that John needed to get up and running this
week. I think his name was Max. I still have his contact information
around here somewhere... He said he was going on vacation today, which
is why the work was so urgent."
Now we're getting somewhere.
A developer jamming in an urgent change so he could go on
vacation---possibly as part of some urgent project being driven by John
Pesche, our Chief Information Security Officer.
Situations like this only reinforce my deep suspicion of developers:
They're often carelessly breaking things and then disappearing, leaving
Operations to clean up the mess.
The only thing more dangerous than a developer is a developer conspiring
with Security. The two working together gives us means, motive, and
opportunity.
I'm guessing our [CISO]{.smallcaps} probably strong-armed a Development
manager to do something, which resulted in a developer doing something
else, which broke the payroll run.
Information Security is always flashing their badges at people and
making urgent demands, regardless of the consequences to the rest of the
organization, which is why we don't invite them to many meetings. The
best way to make sure something doesn't get done is to have them in the
room.
They're always coming up with a million reasons why anything we do will
create a security hole that alien space-hackers will exploit to pillage
our entire organization and steal all our code, intellectual property,
credit card numbers, and pictures of our loved ones. These are
potentially valid risks, but I often can't connect the dots between
their shrill, hysterical, and self-righteous demands and actually
improving the defensibility of our environment.
"Okay, guys," I say decisively. "The payroll run failure is like a crime
scene and we're Scotland Yard. The [SAN]{.smallcaps} is no longer a
suspect, but unfortunately, we've accidentally maimed it during our
investigation. Brent, you keep working on the injured
[SAN]{.smallcaps}---obviously, we've got to get it up and running soon.
"Wes and Patty, our new persons of interest are Max and his manager," I
say. "Do whatever it takes to find them, detain them, and figure out
what they did. I don't care if Max is on vacation. I'm guessing he
probably messed up something, and we need to fix it by 3 p.m."
I think for a moment. "I'm going to find John. Either of you want to
join me?"
Wes and Patty argue over who will help interrogate John. Patty says
adamantly, "It should be me. I've been trying to keep John's people in
line for years. They never follow our process, and it always causes
problems. I'd love to see Steve and Dick rake him over the coals for
pulling a stunt like this."
It is apparently a convincing argument, as Wes says, "Okay, he's all
yours. I almost feel sorry for him now."
I suddenly regret my choice of words. This isn't a witch hunt, and I'm
not looking for retribution. We still need a timeline of all relevant
events leading up to the failure.
Jumping to inappropriate conclusions caused the [SAN]{.smallcaps}
failure last night. We won't make these kinds of mistakes again. Not on
my watch.
As Patty and I call John, I squint at the phone number on Patty's
screen, wondering if it's time to heed my wife's advice to get glasses.
Yet another reminder that forty is just around the corner.
I dial the number, and a voice answers in one ring, "John here."
I quickly tell him about the payroll and [SAN]{.smallcaps} failure and
then ask, "Did you make any changes to the timekeeping application
yesterday?"
He says, "That sounds bad, but I can assure you that we didn't make any
changes to your midrange systems. Sorry I can't be of more help."
I sigh. I thought that by now either Steve or Laura would have sent out
the announcement of my promotion. I seem destined to explain my new role
in every interaction I have.
I wonder if it would be easier if I just sent out the announcement
myself.
I repeat the abridged story of my hasty promotion yet again. "Wes,
Patty, and I heard that you were working with Max to deploy something
urgent yesterday. What was it?"
"Luke and Damon are gone?" John sounds surprised. "I never thought that
Steve would actually fire both of them over a compliance audit finding.
But who knows? Maybe things are finally starting to change around here.
Let this be a lesson to you, Bill. You Operations people can't keep
dragging your feet on security issues anymore! Just some friendly
advice...
"Speaking of which, I'm suspicious about how the competition keeps
getting the jump on us," he continues. "As they say, once is
coincidence. Twice is happenstance. Third must be enemy action. Maybe
our salespeople's e-mail systems have been hacked. That would sure
explain why we're losing so many deals."
John continues to talk, but my mind is still stuck at his suggestion
that Luke and Damon may have been fired over something security related.
It's possible---John routinely deals with some pretty powerful people,
like Steve and the board as well as the internal and external auditors.
However, I'm certain Steve didn't mention either John or Information
Security as reasons for their departure---only the need to focus on
Phoenix.
I look at Patty questioningly. She just rolls her eyes and then twirls
her finger around her ear. Clearly, she thinks John's theory is crazy.
"Has Steve given you any insights on the new org structure?" I ask out
of genuine curiosity---John is always complaining that information
security was always prioritized too low. He's been lobbying to become a
peer of the [CIO]{.smallcaps}, saying it would resolve an inherent
conflict of interest. To my knowledge, he hadn't succeeded.
It's no secret that Luke and Damon sidelined John as much as possible,
so he couldn't interfere with people who did real work. John still
managed to show up at meetings, despite their best efforts.
"What? I have no clue what's going on," he says in an aggrieved tone, my
question apparently striking a nerve. "I'm being kept in the dark, like
usual. I'll probably be the last to find out, too, if history is any
guide. Until you told me, I thought I was still reporting to Luke. And
now that he's gone, I don't know who I'm reporting to. You got a call
from Steve?"
"This is all above my pay grade---I'm as much in the dark as you are," I
respond, playing it dumb. Quickly changing the subject, I ask, "What can
you tell us about the timekeeping app change?"
"I'll call Steve and find out what's going on. He's probably forgotten
Information Security even exists," he continues, making me wonder
whether we'll ever be able to talk about payroll.
To my relief, he finally says, "Okay, yeah, you were asking about Max.
We had an urgent audit issue around storage of [PII]{.smallcaps}---that
is, personally identifiable information like [SSN]{.smallcaps}s---that's
Social Security numbers, obviously, birthdays, and so forth. European
Union law and now many US state laws prohibit us from storing that kind
of data. We got a huge audit finding around this. I knew it was up to my
team to save this company from itself and prevent us from getting dinged
again. That would be front-page news, you know?"
He continues, "We found a product that tokenized this information, so we
no longer have to store the [SSN]{.smallcaps}s. It was supposed to be
deployed almost a year ago, but it never got done, despite all my
badgering. Now we're out of time. The Payment Card Industry auditors,
that's [PCI]{.smallcaps} for short, are here later this month, so I
fast-tracked the work with the timekeeping team to get it done."
I stare at my phone, speechless.
On the one hand, I'm ecstatic because we've found the smoking gun in
John's hand. John's mention of the [SSN]{.smallcaps} field matches Ann's
description of the corrupted data.
On the other hand: "Let me see if I've got this right..." I say slowly.
"You deployed this tokenization application to fix an audit finding,
which caused the payroll run failure, which has Dick and Steve climbing
the walls?"
John responds hotly, "First, I am quite certain the tokenization
security product didn't cause the issue. It's inconceivable. The vendor
assured us that it's safe, and we checked all their references. Second,
Dick and Steve have every reason to be climbing the walls: Compliance is
not optional. It's the law. My job is to keep them out of orange
jumpsuits, and so I did what I had to do."
" 'Orange jumpsuits?' "
"Like what you wear in prison," he says. "My job is to keep management
in compliance with all relevant laws, regulations, and contractual
obligations. Luke and Damon were reckless. They cut corners that
severely affected our audit and security posture. If it weren't for my
actions, we' d probably all be in jail by now."
I thought we were talking about a payroll failure, not being thrown in
jail by some imaginary police force.
"John, we have processes and procedures for how you introduce changes
into production," Patty says. "You went around them, and, once again,
you've caused a big problem that we're having to repair. Why didn't you
follow the process?"
"Ha! Good one, Patty," John snorts. "I did follow the process. You know
what your people told me? That the next possible deployment window was
in four months. Hello? The auditors are on-site next week!"
He says adamantly, "Getting trapped in your bureaucratic process was
simply not an option. If you were in my shoes, you'd do the same thing."
Patty reddens. I say calmly, "According to Dick, we have fewer than four
hours to get the timekeeping app up. Now that we know there was a change
that affected [SSN]{.smallcaps}s, I think we have what we need."
I continue, "Max, who helped with the deployment, is on vacation today.
Wes or Brent will be contacting you to learn more about this
tokenization product you deployed. I know you'll provide them with
whatever help they need. This is important."
When John agrees, I thank him for his time. "Wait, one more question.
Why do you believe that this product didn't cause the failure? Did you
test the change?"
There's a short silence on the phone before John replies, "No, we
couldn't test the change. There's no test environment. Apparently, you
guys requested a budget years ago, but..."
I should have known.
"Well, that's good news," Patty says after John hangs up. "It may not be
easy to fix, but at least we finally know what's going on."
"Was John's tokenization change in the change schedule?" I ask.
She laughs humorlessly. "That's what I've been trying to tell you. John
rarely goes through our change process. Nor do most people, for that
matter. It's like the Wild West out here. We're mostly shooting from the
hip."
She says defensively. "We need more process around here and better
support from the top, including [IT]{.smallcaps} process tooling and
training. Everyone thinks that the real way to get work done is to just
do it. That makes my job nearly impossible."
In my old group, we were always disciplined about doing changes. No one
made changes without telling everyone else, and we' d bend over backward
to make sure our changes wouldn't screw someone else up.
I'm not used to flying this blind.
"We don't have time to do interrogations every time something goes
wrong," I say, exasperated. "Get me a list of all the changes made in
the past, say, three days. Without an accurate timeline, we won't be
able to establish cause and effect, and we'll probably end up causing
another outage."
"Good idea," she nods. "If necessary, I'll e-mail everyone in
[IT]{.smallcaps} to find out what they were doing, to catch things that
weren't on our schedule."
"What do you mean, 'e-mail everyone?' There's no system where people put
in their changes? What about our ticketing system or the
change-authorization system?" I ask, stunned. This is like Scotland Yard
e-mailing everyone in London to find out who was near the scene of a
crime.
"Dream on," she says, looking at me like I'm a newbie, which I suppose I
am. "For years, I've been trying to get people to use our change
management process and tools. But just like John, no one uses it. Same
with our ticketing system. It's pretty hit-or-miss, too."
Things are far worse than I thought.
"Okay, do what you need to do," I finally say, unable to hide my
frustration. "Make sure you hit all the developers supporting the
timekeeping system as well as all the system administrators and
networking people. Call their managers, and tell them it's important
that we know about any changes, regardless of how unimportant they may
seem. Don't forget John's people, too."
When Patty nods, I say, "Look, you're the change manager. We've got to
do better than this. We need better situational awareness, and that
means we need some sort of functional change management process. Get
everyone to bring in their changes so we can build a picture of what is
actually going on out there."
To my surprise, Patty looks dejected. "Look, I've tried this before.
I'll tell you what will happen. The Change Advisory Board, or
[CAB]{.smallcaps}, will get together once or twice. And within a couple
of weeks, people will stop attending, saying they're too busy. Or
they'll just make the changes without waiting for authorization because
of deadline pressures. Either way, it'll fizzle out within a month."
"Not this time," I say adamantly. "Send out a meeting notice to all the
technology leads and announce that attendance is not optional. If they
can't make it, they need to send a delegate. When is the next meeting?"
"Tomorrow," she says.
"Excellent," I say with genuine enthusiasm. "I'm looking forward to it."
------------------------------------------------------------------------
*When I finally get home,* it's after midnight. After a long day of
disappointments, I'm exhausted. Balloons are on the floor and a
half-empty bottle of wine sits on the kitchen table. On the wall is a
crayon poster saying, "Congratulations Daddy!"
When I called my wife, Paige, this afternoon telling her about my
promotion, she was far happier than I was. She insisted on inviting the
neighbors over to throw a little celebration. Coming home so late, I
missed my own party.
At 2 p.m., Patty had successfully argued that of the twenty-seven
changes made in the past three days, only John's tokenization change and
the [SAN]{.smallcaps} upgrade could be reasonably linked to the payroll
failure. However, Wes and his team were still unable to restore
[SAN]{.smallcaps} operations.
At 3 p.m., I had to tell Ann and Dick the bad news that we had no choice
but to execute plan B. Their frustration and disappointment were all too
evident.
It wasn't until 7 p.m. when the timekeeping application was back up and
11 p.m. when the [SAN]{.smallcaps} was finally brought back online.
Not a great performance on my first day as [VP]{.smallcaps} of
[IT]{.smallcaps} Operations.
Before I left work, I e-mailed Steve, Dick, and Ann a quick status
report, promising to do whatever it takes to prevent this type of
failure from happening again.
I go upstairs, finish brushing my teeth, and check my phone one last
time before going to bed, being careful not to wake up Paige. I curse
when I see an e-mail from our company [PR]{.smallcaps} manager, with a
subject of "Bad news. We may be on the front page tomorrow..."
I sit on the bed, squinting to read the accompanying news story.
::: block
*Elkhart Grove Herald Times*
### Parts Unlimited flubs paychecks, local union leader calls failure 'unconscionable' {.news}
Automotive parts supplier Parts Unlimited has failed to adequately
compensate its workers, with some employees receiving no pay at all,
according to a Parts Unlimited internal memo. The locally headquartered
company admitted that it had failed to issue correct paychecks to some
of its hourly factory workers and that others hadn't received any
compensation for their work. Parts Unlimited denies that the issue is
connected to cash flow problems and instead attributes the error to a
payroll system failure.
The once high-flying \$4 billion company has been plagued by flagging
revenue and growing losses in recent quarters. These financial woes,
which some blame on a failure of upper management, have led to rampant
job insecurity among local workers struggling to support their families.
According to the memo, whatever the cause of the payroll failure,
employees might have to wait days or weeks to be compensated.
"This is just the latest in a long string of management execution
missteps taken by the company in recent years," according to Nestor
Meyers Chief Industry Analyst Kelly Lawrence.
Parts Unlimited [CFO]{.smallcaps} Dick Landry did not return phone calls
from the *Herald Times* requesting comment on the payroll issue,
accounting errors and questions of managerial competency.
In a statement issued on behalf of Parts Unlimited, Landry expressed
regret at the "glitch," and vowed that the mistake would not be
repeated.
The *Herald Times* will continue to post updates as the story
progresses.
:::
Too tired to do anything more, I turn off the lights, making a mental
note to myself to find Dick tomorrow to apologize in person. I close my
eyes and try to sleep.
An hour later I'm still staring at the ceiling, very much awake.
[]{#07-ch4.xhtml}
# Chapter 4 {.ch-title}
## • Wednesday, September 3 {.dateline}
*I drink my coffee* as I open up my laptop at 7:30 a.m., hoping to get
through my e-mails and voicemails before my 8 a.m. meeting. I stare at
the screen. In the twenty-two hours since I was promoted, 526 new
e-mails have arrived in my inbox.
Holy crap.
I skip all the messages about yesterday's failure and am startled by all
the congratulatory notes from vendors, wanting to meet for lunch. How
did they find out? I'm pretty sure most of my organization still doesn't
know.
I read an e-mail from Ellen, my former boss' assistant, who is now
assigned to support me, congratulating me and asking when we can meet. I
reply, telling her I'd like to take her out for coffee this morning. I
send a note to the [IT]{.smallcaps} service desk, requesting that Ellen
be granted access to my calendar.
A blinking red light on my desk phone catches my attention. It reads,
"7:50 a.m. 62 new voicemails."
My jaw drops. It would take an hour I don't have just to listen to them.
I e-mail Ellen again, asking her to go through all my voicemails,
transcribing any that require action.
Before I hit send, I quickly add, "If there are any messages from Steve
or Dick, please call me right away on my cell phone."
Grabbing my clipboard, I hurry toward my first meeting when my phone
vibrates. It's an urgent e-mail:
::: block
From: Sarah Moulton
To: Bill Palmer
Cc: Steve Masters
Date: September 3, 7:58 [AM]{.smallcaps_myriad}
Priority: Highest
Subject: Latest Phoenix slip
Bill, as you know, Project Phoenix is the most important project this
company is undertaking. I've heard disturbing rumors that you are
holding up the release.
I don't need to remind you that our competition isn't standing still.
Each day that goes by, our market share goes down. I need everyone to
have a sense of urgency. Especially from you, Bill.
We have an emergency project management meeting at 10
[AM]{.smallcaps_myriad} today. Please join us, and be prepared to
explain these unacceptable delays.
Steve, I know how important this project is for you, given the
commitments you've made to the board. Please feel free to attend. We'd
love your perspective.
Regards,
Sarah
:::
Oh no.
I forward the e-mail to Wes and Patty, flagging it as high priority.
Something seems wrong in a world where half the e-mail messages sent are
urgent. Can everything really be that important?
I call Wes' cell phone. "I just got your e-mail from Sarah," he says.
"What utter bullshit."
"What's this all this about?" I ask.
He says, "I'm pretty sure it's about Brent not finishing up that
configuration work for the Phoenix developers. Everyone is chasing their
tails because the developers can't actually tell us what the test
environment should look like. We're doing our best, but every time we
deliver something, they tell us we did it wrong."
"When did they tell us about it?" I ask.
"Two weeks ago. It's the typical bullshit with Development, but worse.
They're so freaked out about hitting their deadlines, they're only now
starting to think about how to test and deploy it. Apparently, they're
making it our problem. I hope you're wearing your asbestos underwear
like me. Sarah is going to be at that meeting with torches, wanting to
throw us onto the bonfire."
It's amazing to me how handoffs between Development and [IT]{.smallcaps}
Operations always get screwed up. But given the perpetual tribal warfare
between the two groups, maybe I shouldn't be surprised.
I reply, "I get the picture. Look, make sure you dig into this Dev
specification issue personally. We've got to get this nailed down---grab
everyone involved, whether they're in Dev or Ops, and lock them in a
room until they come up with a written specification. Phoenix is so
important, we can't afford to screw this up."
Wes says he's on it, and I ask, "Is there anything else Sarah could pop
on us?"
He pauses to think and finally says, "No, I don't think so. We have a
pretty valid reason, with the payroll run failure, for why Brent wasn't
able to complete his work."
I agree. Feeling like our asses are sufficiently covered, I say, "See
you at ten."
------------------------------------------------------------------------
*Less than an hour later,* I'm walking to Building 9 in the hot
sunshine, where many of the Marketing folks call home. To my surprise, I
join a small army of [IT]{.smallcaps} people walking the same way. Why?
Then it hits me. The majority of our marketing projects can't be done
without [IT]{.smallcaps}. High touch marketing requires high tech. But
if there's so many of us assigned to these Marketing projects, shouldn't
they be coming to us?
I imagine that Sarah likes it this way, the spider sitting back,
enjoying seeing all the company minions making their way to her lair.
I arrive and immediately see Kirsten Fingle, who runs the Project
Management Office sitting at the head of the table. I am a big fan of
hers. She is organized, levelheaded, and a stickler for accountability.
When she first joined the company five years ago, she brought a whole
new level of professionalism to our organization.
At her right, Sarah leans back in her chair, tapping away on her iPhone,
oblivious to the rest of us.
Sarah is my age: thirty-nine. She's very guarded about her age, always
saying things in a way that would lead one to conclude she's much older,
but never actually lying.
Yet another maddening thing about Sarah.
There are about twenty-five people in the room. Many of the business
line owners are here, some of whom work for Sarah. Chris Allers is also
here. Chris is a little older than me and looks lean and fit. He'll just
as often be seen joking with someone as kicking their ass about missing
a deadline. He has a reputation as a capable and no-nonsense manager.
With nearly two hundred developers working for him, he needs to be.
To help with Phoenix, his team has grown by fifty people in the last two
years, many through offshore development shops. Chris is constantly
asked to deliver more features and do it in less time, with less money.
Several of his managers are in the room, too. Wes is also here, sitting
right next to Chris. As I start to look for an open chair, I note how
everyone seems unusually tense. And then I see why.
There, sitting right next to the only open seat at the table, is Steve.
Everyone seems to be going to great lengths to not stare at him. As I
casually take my seat next to Steve, my phone vibrates. It's a text
message from Wes:
*Shit. Steve has never attended a project management meeting. We are
totally screwed.*
------------------------------------------------------------------------
*Kirsten clears her throat.* "First on our agenda is Phoenix. The news
isn't good. This project went from yellow to red about four weeks ago,
and it's my personal assessment that the deadline is in grave jeopardy."
She continues in her professional voice, "To refresh your memory, last
week there were twelve tasks in the critical path of Phoenix Phase 1.
Only three of those tasks were completed."
There is a collective groan in the room, and several people mutter to
one another. Steve turns to look at me. "Well?"
I explain, "The critical resource in question is Brent, who has been one
hundred percent utilized helping to recover from the payroll failure,
which we all know about. This was a totally unforeseen emergency but
obviously one that we had to handle. Everyone knows how important
Phoenix is, and we are doing everything we can to make sure Brent can
stay focused."
"Thanks for that super creative explanation, Bill," Sarah immediately
responds. "The real issue here is that your people don't seem to grasp
how important Phoenix is to the company. Our competition is killing us
in the market. You've all seen and heard the commercials about their new
services. They're beating us on innovation, both in the retail stores
and online. They've already lured away some of our biggest partners, and
our sales force is starting to panic. I'm not the type to say, 'I told
you so,' but their latest product announcement shows why we can't be
acting as if this is just business as usual."
She continues, "See, Bill, in order for us to increase market share, we
must ship Phoenix. But for some reason, you and your team keep dragging
your feet. Maybe you're not prioritizing correctly? Or maybe you're just
not used to supporting a project this important?"
Despite all my mental preparation, I feel my face get hot with anger.
Maybe it was the condescending way she was parroting Steve to me. Or how
she wasn't even looking at me while she was addressing me, instead
looking at Steve to see how he reacts. Or the way she basically called
me out-of-touch and incompetent.
Everyone is silent as I force myself to take a deep breath.
My anger dissipates. This is all just corporate theater. I don't like it
but accept it for what it is. I almost made the Marines my career when I
was up for promotion to staff sergeant. You don't become a senior
[NCO]{.smallcaps} in the Marines without being able to play politics.
"Interesting," I say to Sarah. "You tell me which is more important:
getting our factory employees paid or getting the Phoenix tasks done?
Steve told me to resolve the payroll failure. How would you have
prioritized this differently than Steve?"
At my mention of Steve, Sarah's expression changes. "Well, maybe if
[IT]{.smallcaps} didn't cause the failure in the first place, you
wouldn't have blown your commitments to us. I don't think we can depend
on you and your team."
I nod slowly, not taking the bait. "I look forward to any suggestions
you have to offer, Sarah."
She looks at me, then at Steve. Apparently deciding there are no more
points to be gained here, she rolls her eyes. I see Wes shaking his head
in disbelief at this discussion, staying uncharacteristically quiet.
Sarah continues, "We've spent over \$20 million on Phoenix, and we're
nearly two years late. We must get to market." Looking over at Chris,
she asks, "Given the delays from Bill's group, when is the soonest we
can go live?"
Chris looks up from his papers. "I've looked into this since we talked
last week. If we expedite some things and if the virtualized
environments from Bill's team work as expected, we can go into
production one week from Friday."
I gape at Chris. He just made up an arbitrary date to go into
production, with complete disregard for all the things we need to do
before deployment.
I have a sudden flashback. In the Marines, we had a ritual for all the
senior [NCO]{.smallcaps}s. We' d hang out with beers and watch *Star
Wars: Return of the Jedi*. Every time Admiral Ackbar would cry, "It's a
trap!" we' d all laugh uproariously, yelling for a replay.
This time, I'm not laughing.
"Now just wait a minute here!" Wes interjects, pounding the table. "What
the hell are you trying to pull? We just found out two weeks ago about
the specifics of the Phoenix deployment. Your guys still haven't told us
what sort of infrastructure we need, so we can't even order the
necessary server and networking gear. And by the way, the vendors are
already quoting us three-week delivery times!"
He is now facing Chris, pointing at him angrily. "Oh, and I've heard
that the performance of your code is so shitty, we're going to need the
hottest, fastest gear out there. You're supposed to support 250
transactions per second, and you're barely doing even four! We're going
to need so much hardware that we'll need another chassis to put it all
in and probably have to pay a custom-manufacturing fee to get it in
time. God knows what this will do to the budget."
Chris wants to respond, but Wes is relentless. "We still don't have a
concrete specification of how the production and test systems should be
configured. Oh, do you guys not need a test environment anymore? You
haven't even done any real testing of your code yet, because that fell
off the schedule, too!"
My heart lurches as all the implications sink in. I've seen this movie
before. The plot is simple: First, you take an urgent date-driven
project, where the shipment date cannot be delayed because of external
commitments made to Wall Street or customers. Then you add a bunch of
developers who use up all the time in the schedule, leaving no time for
testing or operations deployment. And because no one is willing to slip
the deployment date, everyone after Development has to take outrageous
and unacceptable shortcuts to hit the date.
The results are never pretty. Usually, the software product is so
unstable and unusable that even the people who were screaming for it end
up saying that it's not worth shipping. And it's always [IT]{.smallcaps}
Operations who still has to stay up all night, rebooting servers hourly
to compensate for crappy code, doing whatever heroics are required to
hide from the rest of the world just how bad things really are.
"Guys, I understand the desire to get Phoenix into production as quickly
as possible," I say to Steve and Chris as calmly as I can. "But based on
what we've heard from Wes, I think it is incredibly premature to deploy.
We still don't know what equipment we need to hit the performance
objectives, nor have we done any capacity testing to confirm our
guesses. It's unlikely we have adequate documentation to run this thing
in production, let alone get everything monitored and backed up."
In my most persuasive voice, I continue, "I want Phoenix in the market
as badly as anyone else, but if the user experience is bad enough, we'll
end up driving our customers to the competition."
I turn to Chris. "You can't just throw the pig over the wall to us, and
then high-five each other in the parking lot, congratulating yourselves
on how you made the deadline. Wes is telling us that the pig will
probably break its leg, and it'll be my guys who work all-nighters and
weekends to keep that pig alive."
Chris replies hotly, "Don't give me that bullshit about 'throwing the
pig over the wall.' We invited your people to our architecture and
planning meetings, but I can count on one hand the number of times you
guys actually showed up. We routinely have had to wait days or even
weeks to get anything we need from you guys!"
Then he just holds up his hands, as if everything is outside of his
control. "Look, I'd like more time, too. But from the very beginning, we
all knew that this was a date-driven project. That was a business
decision we all made."
"Exactly!" Sarah exclaims before I can respond. "This just shows how
Bill and his team lack the necessary sense of urgency. Perfection is the
enemy of good. Bill, we simply do not have the luxury of time to polish
this to whatever gold standard you're proposing. We need to create
positive cash flow, and we cannot do that without taking back market
share. And to do that, we need to deploy Phoenix."
She looks over at Steve. "We understand risk, don't we, Steve? You've
been doing an absolutely amazing job selling this to analysts and even
the guys on [CNBC]{.smallcaps}---I don't think we want egg on our face
by shipping even later than we already are."
Steve nods his head and rubs his chin, rocking back and forth in his
chair as he thinks. "Agreed," he finally says, leaning forward. "We've
made commitments to our investors and analysts that we were going to
launch Phoenix this quarter."
My jaw drops. Sarah has blunted all my arguments, leading Steve down a
reckless, destructive path.
Exasperated, I say, "Does anyone think this is really odd? I've been in
this room when we discussed installing new water fountains in the front
of every store. We gave that team nine months to plan the rollout. Nine
months! And all of us agreed that was reasonable.
"Now we're talking about Phoenix, which impacts thousands of point of
sale systems, and all of the back-office order entry systems. This is at
least ten thousand times more complex than rolling out new water
fountains, with way more risk to the business. And you're only giving us
one week to plan and execute the rollout?"
I throw my hands up, imploring Steve, "Doesn't this seem a bit reckless
and unfair?"
Kirsten nods, but Sarah says dismissively, "Bill, that's a touching
story but we're not discussing water fountains, we're discussing
Phoenix. Besides, I believe the decision has already been made."
Steve says, "Yes, it has. Thank you for sharing what you view as the
risks, Bill." He turns to Sarah. "When is the launch date?"
Sarah replies quickly, "Marketing launch is next Saturday, September 13.
Phoenix will deploy at 5 p.m. the previous day."
Steve writes the date in the back of his notebook and says, "Good. Keep
me posted on progress, and let me know if there's anything I can do to
help."
I look over at Wes, who mimes with his hands an airplane crashing into
the table in front of him and bursting into flames.
------------------------------------------------------------------------
*In the hallway, Wes says,* "I thought that went pretty well, boss."
I'm not laughing. "What the hell happened in there? How did we get into
this position? Does anyone know what's required from us to support this
launch?"
"No one has a clue," he says, shaking his head in disgust. "We haven't
even agreed on how to do the handoff with Development. In the past,
they've just pointed to a network folder and said, 'Deploy that.' There
are newborn babies dropped off at church doorsteps with more operating
instructions than what they're giving us."
I shake my head at his awful imagery, but he's right. We've got a
serious problem here.
He continues, "We're going to have to assemble a huge team, including
Chris' guys, to figure out how we're going to pull this off. We have
problems at every layer: networking, servers, databases, operating
systems, applications, Layer 7 switching---the whole wad of crap. It's
going to be late nights for all of us for the next nine days."
I nod unhappily. This type of all-hands effort is just another part of
life in [IT]{.smallcaps}, but it makes me angry when we need to make
some heroic, diving catch because of someone else's lack of planning.
I say, "Get your team assembled, and ask Chris to assemble his
respective team as well. Stop trying to do this by e-mail and in the
ticketing system. We need everyone in the same room."
"Speaking of commitments," I say, "What was Chris referring to when he
said that our guys never showed up to the Phoenix architecture and
planning meetings? Is that true?"
Wes rolls his eyes in frustration. "Yeah, it's true that his people
would invite us at the last minute. Seriously, who can clear their
calendar on less than a day's notice?"
"Although, in fairness," he says, after a moment, "we did get ample
notice on a couple of the big planning meetings. And one of the most
critical people who needed to be there wasn't able to make it, due to
escalations. You can probably guess who that is..."
I groan. "Brent?"
Wes nods, "Yep. He's the guy we need at those meetings to tell those
idiotic developers how things work in the real world and what type of
things keep breaking in production. The irony, of course, is that he
can't tell the developers, because he's too busy repairing the things
that are already broken."
He's right. Unless we can break this cycle, we'll stay in our terrible
downward spiral. Brent needs to work with developers to fix issues at
the source so we can stop fighting fires. But Brent can't attend,
because he's too busy fighting fires.
I say, "We need our best minds to prepare for this deployment, so make
sure Brent is there."
Wes looks sheepish for a moment. I ask him, "What?"
"I think he's working a network outage right now." he replies.
"Not anymore," I say. "They're going to have to fix it without him. If
someone has a problem with that, send them to me."
"Okay, whatever you want, boss." he says, shrugging his shoulders.
------------------------------------------------------------------------
*After the project management meeting,* I'm in no mood to talk to
anyone. I sit at my desk and grumble when my laptop doesn't wake up. The
disk drive light just keeps blinking. When nothing shows on the screen,
I grab my empty mug that I keep on my desk by the picture of Paige and
my two sons and walk to the coffee machine in the corner.
When I get back to my desk, a window on the screen tells me that it's
going to install some critical new updates. I sit down, click
"[Ok]{.smallcaps}" and watch the status bar crawl across the screen.
Suddenly, I see the dreaded "blue screen of death." My laptop is now
completely locked up and unusable.
It happens again even after I reboot. I mutter in frustration, "You've
got to be kidding me!"
Just then, Ellen, my new assistant, pokes her head around the corner.
Holding out her hand she says, "Good morning. Congratulations on the
promotion, Bill!" Noticing my blue-screened laptop, she says
sympathetically, "Ooh, that doesn't look good."
"Umm, thanks." I say, reaching out to shake her hand. "Yeah, about this
laptop, can you get a hold of someone in desktop support? There's some
serious crap headed our way from Phoenix, and I'm going to need it."
"No problem," she says, nodding with a smile. "I'll tell them our new
[VP]{.smallcaps} is hopping mad, demanding that his laptop get fixed. Of
all people, you need a working computer, right?
"You know," she adds, "I've heard that a bunch of other people are
having problems like this today. I'll make sure you get to the top of
the list. You can't afford to wait in line."
More bricked laptops? This is surely evidence that the universe is out
to get me today.
"By the way, I need some help coordinating some emergency Phoenix
meetings. Has anyone granted you access to my calendar yet?" I ask.
She rolls her eyes. "No. That's actually why I came down here. I wanted
to see if you could print out your next couple of days. Obviously,
that's out of the question. I'll have the desktop support person do that
while he's here. Sometimes it takes weeks for the e-mail administrators
to get around to stuff like this."
Weeks? That's unacceptable. I quickly look at my watch and realize I'll
have to tackle this later. I'm already late.
"Do your best," I say. "I'm off to Patty's enterprise change management
meeting. Call me if you need anything, okay?"
Being ten minutes late to Patty's meeting, I hurry into the room,
expecting to see either a bunch of people waiting for me impatiently or
perhaps a meeting already underway.
Instead, I see only Patty sitting at the conference table, typing away
on her laptop.
"Welcome to the [CAB]{.smallcaps}, Bill. I hope you can find an empty
chair," she says.
"Where is everybody?" I ask.
I'm baffled. When I ran the midrange group, my team would never miss our
change management meetings. It was where we coordinated and organized
all our work to make sure we didn't shoot ourselves in the foot.
"I told you yesterday that change management around here is
hit-or-miss," Patty says, sighing. "Some groups have their own local
change-management process, like yours. But most groups do nothing at
all. Yesterday's outage is just proof that we need to have something at
the enterprise level. Right now, the left hand rarely knows what the
right hand is doing."
"So, what's the problem?" I ask.
She purses her lip. "I don't know. We sent a bunch of people to
[ITIL]{.smallcaps} training, so they could get up to speed on all the
best practices. We brought in some consultants, who helped us replace
our ticketing system with an [ITIL]{.smallcaps}-compliant change
management tool. People were supposed to put change requests into it,
where it would get routed for approvals. But, even after two years, all
we have is a great process on paper that no one follows and a tool that
no one uses. When I pester people to use them, all I get are complaints
and excuses."
I nod. [ITIL]{.smallcaps} stands for [IT]{.smallcaps} Infrastructure
Library, which documents many [IT]{.smallcaps} best practices and
processes, and the [ITIL]{.smallcaps} program has had a reputation of
spending years merely walking in circles.
I'm bothered that Wes isn't here. I know he's busy, but if he's not
here, why would any of his people bother to show up? Efforts like this
must start and be continually maintained from the top.
"Well, they can bring their complaints and excuses to me," I say
adamantly. "We're rebooting the change management process. With my total
support. Steve's told me to make sure people can stay focused on
Phoenix. Screwups like the [SAN]{.smallcaps} failure made us miss a
Phoenix deliverable, and now we're paying for it. If someone wants to
skip a change management meeting, they obviously are in need of some
special compassionate coaching. From me."
At Patty's puzzled expression at my Phoenix reference, I tell her about
how Wes and I spent our morning being run over by the bus. Sarah and
Chris were at the wheel, but Steve was in back, cheering them on to
floor it.
"Not good," she says, disapprovingly. "They even ran over Kirsten, huh?"
I nod silently but refuse to say more. I always liked that phrase in
*Saving Private Ryan*: "There's a chain of command: gripes go up, not
down."
Instead, I ask her to walk me through the current change process and the
way it's been automated in the tools. It all sounds good. But there's
only one way to see if the process works.
I say, "Schedule another [CAB]{.smallcaps} meeting for the same time
Friday. I'll send out an e-mail to all the [CAB]{.smallcaps} members
letting them know that this is mandatory."
------------------------------------------------------------------------
*When I get back to my cubicle,* Ellen is at my desk, bending over my
laptop, writing a note.
"Everything working, I hope?" I ask.
She startles at the sound of my voice. "Oh, my God. You scared me," she
says laughing. "Support left you a replacement laptop because they
couldn't get your laptop to boot, even after a half hour of trying."
She points at the far side of my desk, and I do a double take.
My replacement laptop appears to be almost ten years old---it's twice as
large as my old one and looks three times as heavy. The battery has been
taped on, and half the keyboard lettering is worn off from heavy use.
For a moment, I wonder if this is a practical joke.
I sit down and bring up my e-mail, but everything is so slow that
several times I thought it had locked up.
Ellen has a sympathetic expression on her face. "The support guy said
that this is all they have available today. Over two hundred people are
having similar problems, and many aren't getting replacements.
Apparently, people with your laptop model also have had their's break
because of some security patch."
I forgot. It's Patch Tuesday, when John and his team roll out all their
security patches from our major vendors. Once again, John is causing
huge issues and disruptions for my team and me.
I merely nod and thank her for the help. After she's gone, I sit down
and type out an e-mail to all the [CAB]{.smallcaps} members, my
keystrokes often taking ten seconds to show up on the screen.
::: block
From: Bill Palmer
To: Wes Davis, Patty McKee, [IT]{.smallcaps_myriad} Operations
Management
Date: September 3, 2:43 [PM]{.smallcaps_myriad}
Priority: Highest
Subject: Mandatory [CAB]{.smallcaps_myriad} meeting Friday, 2
[PM]{.smallcaps_myriad}
Today, I attended the weekly [CAB]{.smallcaps_myriad} meeting. I was
extremely disappointed that I was the only one there, besides Patty,
especially given the totally avoidable, change-related failure
yesterday.
Effective immediately, managers (or their assigned delegates) are
required to attend all scheduled [CAB]{.smallcaps_myriad} meetings and
to perform their assigned duties. We are resurrecting the Parts
Unlimited change management process and it will be followed to the
letter.
Any person(s) caught circumventing change management will be subject to
disciplinary action.
There will be a mandatory [CAB]{.smallcaps_myriad} meeting Friday at 2
[PM.]{.smallcaps_myriad} See you there.
Call me if you have any questions or concerns.
Thanks for your support,
Bill
:::
I hit send, waiting fifteen seconds for the e-mail to finally leave my
outbox. Almost immediately, my cell phone rings.
It's Wes. I say, "I was just about to call you about the laptops. We've
got to get replacements to our managers and employees so they can do
their jobs, you hear?"
"Yeah, we're on it. But I'm not calling about that. And I'm not calling
about Phoenix, either," he says, sounding irritated. "Look, about your
memo on change management: I know you're the boss, but you better know
that the last time we did one of these change management kumbayas, we
ran [IT]{.smallcaps} straight into the ground. No one, and I mean
absolutely *no one*, could get a single thing done. Patty insisted on
having everyone take a number and wait for her pointy-heads to authorize
and schedule our changes. It was absolutely ridiculous and a total waste
of time."
He's unstoppable: "That software application she made us use is a total
piece of crap. It takes twenty minutes to fill out all those fields for
a simple five-minute change! I don't know who designed the process, but
I think they assumed that we all get paid by the hour and want to talk
about doing work instead of actually doing work.
"Eventually, the Networking and Server Team staged a rebellion, refusing
to use Patty's tool," he continues heatedly. "But John waved an audit
finding around and went to Luke, our old [CIO]{.smallcaps}. And just
like you did, Luke said that following policies was a condition of
employment, threatening to fire anybody who didn't follow them.
"My guys were spending half their time doing paperwork and sitting in
that damned [CAB]{.smallcaps} meeting," he continues. "Luckily, the
effort finally died, and John was too clueless to catch on that no one
was actually going to the meetings anymore. Even John hasn't gone to one
of those meetings in over a year!"
Interesting.
"I hear you," I say. "We can't repeat that, but we also can't have
another payroll disaster. Wes, I need you there, and I need you to help
create the solution. Otherwise, you're part of the problem. Can I count
on you?"
I hear him sigh loudly. "Yeah, sure. But you can also count on me
calling 'bullshit' if I see Patty trying to create some sort of
bureaucracy that sucks out everybody's will to live."
I sigh.
Before, I was merely worried that [IT]{.smallcaps} Operations was under
attack by Development, Information Security, Audit, and the business.
Now, I'm starting to realize that my primary managers seem to be at war
with each other, as well.
What will it take for us to all get along?
[]{#08-ch5.xhtml}
# Chapter 5 {.ch-title}
## • Thursday, September 4 {.dateline}
*I wake up with a jolt* when the alarm clock goes off at 6:15
a.m.[.]{.smallcaps} My jaw still hurts from clenching it all night. The
dismal prospects of the upcoming Phoenix launch were never far from my
mind.
As usual, before climbing out of bed, I quickly scan my phone for any
bad news. Usually, I would spend about ten minutes replying to
e-mails---it always feels good to lob a couple of balls off my side of
the court.
I see something that makes me bolt upright so abruptly that I wake up
Paige. "Oh, my God. What, what?" she asks frantically, not fully awake.
"It's another e-mail from Steve. Hang on, darling..." I say to her,
while I squint to read it.
::: block
From: Steve Masters
To: Bill Palmer
Cc: Nancy Mailer, Dick Landry
Date: September 4, 6:05 [AM]{.smallcaps_myriad}
Priority: Highest
Subject: [URGENT]{.smallcaps_myriad}: [SOX]{.smallcaps_myriad}-404
[IT]{.smallcaps_myriad} Audit Findings Review
Bill, please look into this [ASAP]{.smallcaps_myriad}. I don't need to
tell you how critical it is to have a clean [SOX]{.smallcaps_myriad}-404
audit.
Nancy, please work with Bill Palmer, who is now in charge of
[IT]{.smallcaps_myriad} Operations.
Steve
\>\>\> Begin forwarded message:
We just concluded our Q3 internal audit in preparation for the upcoming
[SOX]{.smallcaps_myriad}-404 external audit. We discovered some very
concerning deficiencies that we need to discuss with you. Due to the
severity and urgency of the findings, we need to meet with
[IT]{.smallcaps_myriad} this morning.
Nancy
:::
Indeed, there's a two-hour meeting scheduled for 8 a.m. on my calendar,
set up by Nancy Mailer, Chief Audit Executive.
Holy crap. She is incredibly smart and formidable. Years ago during the
retail acquisition integration, I watched her grill a manager from the
business we were acquiring. He was presenting their financial
performance, when she started a rapid-fire interrogation, like a cross
between Columbo, Matlock, and Scarface.
He quickly broke, admitting that he was exaggerating his division's
performance.
Recalling that meeting, my armpits feel damp. I haven't done anything
wrong. But given the tone of the e-mail, she is clearly hot on the trail
of something important, and Steve just threw me in her path.
I've always run a very tight ship in my Midrange Technology group. This
kept Audit from interfering too much. Sure, there would still be a lot
of questions and documentation requests, requiring us to spend a few
weeks collecting data and preparing responses. Occasionally, they would
find something, but we would quickly fix it.
I like to think that we built a mutually respectful working
relationship. However, this e-mail portends something more ominous.
I look at my watch. The meeting is in ninety minutes, and I don't have a
clue about what she wants to talk about.
"Shit!" I exclaim, as I jostle Paige's shoulder. "Honey, can you drive
the kids into school today? Something really bad just came up involving
the Chief Audit Executive and Steve. I need to make some phone calls and
get to the office right away."
Annoyed, she says, "For two years you've always taken the kids on
Thursdays! I have an early start today, too!"
"I'm sorry, honey. This is really important. The [CEO]{.smallcaps} of
the company asked me to handle this. Steve Masters. You know, the guy on
[TV]{.smallcaps} and who gives the big speeches at the company holiday
party? I can't drop another ball after a day like yesterday. And the
newspaper headline the night before that---"
Without a word, she storms down the stairs.
------------------------------------------------------------------------
*When I finally find* the conference room for the 8 a.m. meeting, I
immediately notice how silent it is, devoid of the usual small talk that
fills the time while attendees trickle in.
Nancy sits at the head of the table, with four other people sitting
around her. Sitting next to her is John along with his ever-present,
black three-ring binder. As always, I'm surprised by how young he is.
He's probably in his mid-thirties with thick, curly black hair.
John has a haggard look about him, and like many college students, has
continually gained weight in the three years he's been here at Parts
Unlimited. Most likely from all the stress associated with his failing
moral crusade.
John actually reminds me more of Brent than anyone else in the room.
However, unlike Brent who normally wears a Linux T-shirt, John wears a
starched, collared shirt that's slightly too large.
Wes is conspicuously underdressed compared to everyone in the room, but
he obviously doesn't care. The last person in the room is a young man
who I don't recognize, presumably the [IT]{.smallcaps} auditor.
Nancy begins, "We have just concluded our Q3 internal audit in
preparation for the upcoming external [SOX]{.smallcaps}-404 audits. We
have a grave situation. Tim, our [IT]{.smallcaps} auditor, found an
eye-opening number of [IT]{.smallcaps} control issues. Worse, many are
repeat findings going into the third year. Left unresolved, these
findings may force us to conclude that the company no longer has
sufficient controls to assert the accuracy of its financial statements.
This could result in an adverse footnote from the external auditors in
the company 10-[K]{.smallcaps} filings with the US Securities and
Exchange Commission.
"Although these are only preliminary findings, due to the gravity of the
situation, I have already verbally informed the audit committee."
I blanch. Although I don't understand all the audit jargon, I know
enough that this could ruin Dick's day and mean potentially more bad
front-page news.
Satisfied that I understand the severity of the situation, Nancy nods.
"Tim, please walk us through your conclusions."
He takes out a huge stack of stapled papers, handing one out to everyone
assembled. "We have just concluded our audit of the [IT]{.smallcaps}
general controls at Parts Unlimited for all of the critical financial
systems. It took a team of four people over eight weeks to create this
consolidated report."
Holy crap. I lift the two-inch thick stack of papers in my hand. Where
did they find a stapler this big?
It's a printed Excel spreadsheet, with twenty rows per page in tiny
eight-point type. The last page is numbered page 189. "There must be a
thousand issues here!" I say in disbelief.
"Unfortunately, yes," he responds, not entirely able to hide his smug
satisfaction. "We found 952 [IT]{.smallcaps} general control
deficiencies, of which sixteen are significant deficiencies and two are
potential material weaknesses. Obviously, we're very alarmed. Given how
soon the external audit starts, we need your remediation plan as soon as
possible."
Wes is hunched over the table, one hand on his forehead, the other hand
flipping through page after page. "What kind of horseshit is this?"
He holds up one page. " 'Issue 127. Insecure Windows operating system
[MAX_SYN_COOKIE]{.smallcaps} setting'? Is this a joke? In case you
haven't heard, we've got a real business to run. Sorry if that
interferes with this full-time audit employment racket you've got going
on here."
Trust Wes to say what people are thinking but are too smart to actually
say aloud.
Nancy responds gravely, "Unfortunately, at this point, the phase of
control review and testing is over. What we require from you now is the
'management response letter.' You need to investigate each of these
findings, confirm them, and then create a remediation plan. We'll review
it and then present to the audit committee and the board of directors.
"Normally, you would have months to prepare your response letter and
execute your remediation plan," she continues, suddenly looking
apologetic. "Unfortunately, the way the audit testing calendar worked
out, we only have three weeks until the external auditors arrive. That's
regrettable. We'll make sure to give [IT]{.smallcaps} more time in the
next audit cycle. But this time around, we require your response by..."
She looks at her calendar. "One week from Monday, at the very latest. Do
you think you can make it?"
Oh, shit.
That's just six working days away. We'll need half that time just to
read the entire document.
Our auditors, who I've long believed are a force for justice and
objectivity, are crapping on me, too?
I pick up the huge stack of papers again and look at a couple of random
pages. There are many entries like Wes read, but others have references
to inadequate security settings, presence of ghost login accounts,
change control issues, and segregation of duties issues.
John flips his three-ring binder open and says officiously, "Bill, I
brought up many of the same issues with Wes and your predecessor. They
convinced the [CIO]{.smallcaps} to sign a management waiver, stating
that he accepted the risk, and do nothing. Given that some of these are
now repeat audit findings, I don't think we'll be able to talk our way
out of it this time."
He turns to Nancy. "During the previous management regime,
[IT]{.smallcaps} controls clearly weren't a priority, but now that all
the security chickens are coming home to roost, I'm sure Bill will be
more prudent."
Wes looks at John with contempt. I can't believe John is grandstanding
in front of the auditors. It's times like this that make me wonder whose
side he's really on.
Oblivious to Wes and me, John says to Nancy, "My department has been
remediating some other controls, which I think we should be given credit
for. For starters, we've completed the tokenization of the
[PII]{.smallcaps} on our critical financial systems, so at least we
dodged that bullet. That finding is now closed."
Nancy says dryly, "Interesting. The presence of [PII]{.smallcaps} is not
in the scope of the [SOX]{.smallcaps}-404 audit, so from that
perspective, focusing on the [IT]{.smallcaps} general controls might
have been a better use of time."
Wait. John's urgent tokenization change was for nothing?
If that's true, John and I need to talk. Later.
I say slowly, "Nancy, I genuinely don't know what we can get to you by
Friday. We're buried in recovery work and are scrambling to support the
upcoming Phoenix rollout. Which of these findings are the most important
for us to respond to?"
Nancy nods to Tim, who says, "Certainly. The first issue is the
potential material weakness, which is outlined on page seven. This
finding states that an unauthorized or untested change to an application
supporting financial reporting could have been put into production. This
could potentially result in an undetected material error, due to fraud
or otherwise. Management does not have any control that would prevent or
detect such a change.
"Furthermore, your group was also unable to produce any change
management meeting minutes, which is supposed to meet weekly, according
to your policy."
I try not wince visibly, recalling that no one even showed up at the
[CAB]{.smallcaps} meeting yesterday, and during the payroll incident, we
were so oblivious to John's tokenization change that we ended up
bricking the [SAN]{.smallcaps}.
If we were clueless about those changes, I sincerely doubt that we' d
notice if someone disabled a control that would enable a minor, say,
\$100 million fraudulent transaction.
"Really? That's unbelievable! I'll look into that." I say with what I
hope is the right amount of surprise and moral outrage. After I pretend
to take detailed notes on my clipboard, circling and underlining random
words, I nod, prompting Tim to continue.
"Next, we found numerous instances where developers have administrative
access to production applications and databases. This violates the
required segregation of duty required to prevent risk for fraud."
I look over to John. "Really? You don't say. Developers making changes
to an application without an approved change order? That certainly
sounds like a security risk. What would happen if someone coerced a
developer, say Max, into doing something unauthorized? We've go to do
something about that, right, John?"
John turns bright red, but says politely, "Yes, of course. I agree and
would be happy to help."
Tim says, "Good. Let's move onto the sixteen significant deficiencies."
A half hour later, Tim is still droning on. I stare glumly at the huge
stack of findings. Most of these issues are just like the huge, useless
reports we get from Information Security, which is another reason why
John has such a bad reputation.
It's the never-ending hamster wheel of pain: Information Security fills
up people's inboxes with never-ending lists of critical security
remediation work, quarter after quarter.
When Tim finally finishes, John volunteers, "We must get these
vulnerable systems patched. My team has a lot of experience patching
systems, if you require assistance. These audit findings are an awesome
opportunity to close some big security holes."
"Look, both of you guys have no idea what you're asking for!" Wes says
to John and Tim, clearly exasperated. "Some of the servers that those
manufacturing [ERP]{.smallcaps} systems run on are over twenty years
old. Half the company will grind to a halt if they go down, and the
vendor went out of business decades ago! These things are so fragile
that if you even look at them at the wrong time of day, they'll crash
and require all sorts of voodoo to get them to successfully reboot.
They'll never survive the changes you're proposing!"
He leans over the table, putting his finger in John's face. "You want to
patch it yourself, fine. But I want a signed piece of paper from you
saying that if you push the button and the entire business grinds to a
halt, you'll fly around and grovel to all the plant managers, explaining
to them why they didn't hit their production targets. Deal?"
My eyes widen with amazement when John actually leans forward into Wes'
finger and says angrily, "Oh, yeah? How about when we're on the front
page of the news because we lost consumer data that we're responsible
for protecting? You'll personally apologize to the thousands or millions
of families whose data are now being sold by the Russian Mafia?"
I say, "Settle down, everyone. We all want to do what's right for the
company. The trick is figuring out what we have time to do and what
systems can actually be patched."
I look at the stack of papers. Wes, Patty, and I can assign people the
task of investigating each issue, but who will actually do the work?
We're already buried with Phoenix, and I fear that this new massive
project might be the straw that breaks the camel's back.
I say to Nancy, "I'll get with my team right away, and we'll come up
with a plan. I can't promise you that we'll have our response letter
completed by then, but I can promise you that we'll get you everything
we can. Will that be adequate?"
"Quite so," Nancy says amicably. "Going through the preliminary audit
findings and identifying next steps were the only objectives for this
meeting."
As the meeting adjourns, I ask Wes to stay behind.
Noticing this, John remains behind, as well. "This is a disaster. All my
objectives and bonuses are tied to getting a clean compliance report for
the [SOX]{.smallcaps}-404 and [PCI]{.smallcaps} audits. I'm going to
fail because you Ops guys can't get your shit together!"
"Join the club," I say.
To get him off my back, I say, "Sarah and Steve decided to move up the
Phoenix deployment date to next Friday. They want to skip all the
security reviews. You probably should talk to Chris and Sarah right
away."
Predictably, John swears and storms out, slamming the door behind him.
------------------------------------------------------------------------
*Exhausted, I lean back* in my chair and say to Wes, "This is just not
our week."
Wes laughs humorlessly. "I told you that the pace of things around here
would make your head explode."
I gesture at the audit findings. "We're supposed to protect all our key
resources for Phoenix, but that's sucking in everybody. We don't have a
bunch of people just sitting on the bench we can throw at the audit
findings, right?"
Wes shakes his head, his face uncharacteristically pinched with tension.
He flips through his stack of papers again. "We're definitely going to
need to bring the technology leads into this. But as you said, they're
already assigned to the Phoenix team. Should we reassign them here?"
I honestly don't know. Wes stares at one of the pages for a moment. "By
the way, I think a bunch of these will require Brent."
"Oh, come on." I mutter. "Brent. Brent, Brent, Brent! Can't we do
anything without him? Look at us! We're trying to have a management
discussion about commitments and resources, and all we do is talk about
one guy! I don't care how talented he is. If you're telling me that our
organization can't do anything without him, we've got a big problem."
Wes shrugs, slightly embarrassed. "He's undoubtedly one of our best
guys. He's really smart, and he knows a lot about almost everything we
have in this shop. He's one of the few people who really understand how
all the applications talk together at an enterprise level. Heck, the guy
may know more about how this company works than I do."
"You're a senior manager. This should be as unacceptable to you as it is
to me!" I say firmly. "How many more Brents do you need? One, ten, or a
hundred? I'm going to need Steve to prioritize all this work. What I
need from you is what resources we need. If I ask Steve for more
resources, I don't want to have to crawl back, begging for more later."
He rolls his eyes. "Look, I'll tell you right now what's going to
happen. We'll go to management and present our case. Not only will they
say no, they'll cut our budget by another five percent. That's what
they've done for the past five years. In the meantime, everyone will
continue to want everything at the same time, and keep adding to our
list of things to do."
Exasperated, he continues, "And just so you know, I have tried to hire
more Brents. Because I never got the budget, I eliminated a bunch of
positions just so I could hire four more very senior engineers at the
same level of experience as Brent. And you know what happened?"
I merely raise my eyebrows.
Wes says, "Half quit within a year, and I'm not getting anywhere near
the productivity I need from the ones who stayed. Although I don't have
data to prove it, I'm guessing Brent is even more behind than ever. He
complains that he had to spend a bunch of time training and helping the
new guys, and is now stretched thinner than ever. And he's still in the
middle of everything."
I respond, "You said that people 'add stuff to our list.' What does the
list look like right now? Where can I get a copy? Who owns the list?"
Wes replies slowly, "Well, there are the business projects and the
various [IT]{.smallcaps} infrastructure projects. But a lot of the
commitments just aren't written down."
"How many business projects? How many infrastructure projects?" I ask.
Wes shakes his head. "I don't know offhand. I can get the list of
business projects from Kirsten, but I'm not sure if anyone knows the
answer to your second question. Those don't go through the Project
Management Office."
I have a sinking feeling in the pit of my stomach. How can we manage
production if we don't know what the demand, priorities, status of work
in process, and resource availability are? Suddenly, I'm kicking myself
that I didn't ask these questions on my first day.
Finally, I'm thinking like a manager.
I call Patty. "Wes and I just got hammered by audit and they need a
response one week from Monday. I need your help to figure what all our
work commitments are, so I can have an intelligent discussion with Steve
about resourcing. Can you talk?"
She says, "That's right up my alley. Come on over."
After Wes briefs Patty on the implications of the mammoth audit report
that he thumped down on the table, she whistles.
"You know, I really wish you were at that meeting with the auditors," I
say. "Most of the biggest issues were around the absence of a functional
change management process. I think you could end up being the auditors'
best friend."
"Auditors have friends?" she laughs.
"I need you to help Wes estimate the work to fix the audit findings by
Monday," I say. "But right now, let's talk about a higher level issue.
I'm trying to get the list of what all our commitments to the
organization are. How big is that list and how do things get on it?"
After hearing what Wes told me, Patty replies, "Wes is right. Kirsten
owns the official business project list, almost all of which have
something that we're on the hook for. We have our own [IT]{.smallcaps}
Operations projects, which are typically managed by the technology
budget owner---there is no centralized list of those projects."
Patty continues, "We also have all the calls going into the service
desk, whether it's requests for something new or asking to fix
something. But that list will be incomplete, too, because so many people
in the business just go to their favorite [IT]{.smallcaps} person. All
that work is completely off the books."
I ask slowly, "So, you're saying that we have no idea what the list of
our commitments is? Really?"
Wes says defensively, "Until now, no one ever asked. We've always hired
smart people and tasked them with certain areas of responsibility. We've
never had to manage things beyond that."
"Well, we need to start. We can't make new commitments to other people
when we don't even know what our commitments are now!" I say. "At the
very least, get me the work estimate to fix the audit findings. Then,
for each of *those* resources, tell me what their *other* commitments
are that we're going to be pulling them off of."
Thinking for a moment, I add, "For that matter, do the same thing for
every person assigned to Phoenix. I'm guessing we're overloaded, so I
want to know by how much. I want to proactively tell people whose
projects have been bumped, so they're not surprised when we don't
deliver what we promised."
Both Wes and Patty look surprised. Wes speaks up first, "But...but we' d
have to talk with almost everyone! Patty may have fun grilling people on
what changes they're making, but we can't go around wasting the time of
our best people. They've got real work to do!"
"Yes, I know they have real work to do," I say adamantly. "I merely want
a one-line description about what all that work is and how long they
think it will take!"
Realizing how this might come across, I add, "Make sure you tell people
that we're doing this so we can get more resources. I don't want anyone
thinking that we're outsourcing or firing anyone, okay?"
Patty nods. "We should have done this a long time ago. We bump up the
priorities of things all the time, but we never really know what just
got bumped down. That is, until someone screams at us, demanding to know
why we haven't delivered something."
She types on her laptop. "You just want a list of organizational
commitments for our key resources, with a one-liner on what they're
working on and how long it will take. We'll start with all Phoenix and
audit remediation resources first, but will eventually cover the entire
[IT]{.smallcaps} Operations organization. Do I have it right?"
I smile, genuinely happy that Patty has framed it so succinctly. I know
she's going to do a great job. "Exactly. Bonus points if you and Wes can
determine which resources are most overutilized and how many new
resources we need. That would be the basis of an ask to Steve for more
staffing."
Patty says to Wes, "This should be pretty straightforward. We can put
together fifteen-minute interviews, pull data from our service desk and
ticketing system, get Kirsten's project list..."
Surprisingly, Wes agrees, adding, "We could also look in our budgeting
tools to see how we've coded personnel and hardware requests."
I stand up. "Great thinking, guys. Get a meeting set up for us to go
over what you find, no later than Friday. I want to have a meeting with
Steve on Monday, armed with some real data."
She gives me the thumbs-up. Now we're getting somewhere.
[]{#09-ch6.xhtml}
# Chapter 6 {.ch-title}
## • Friday, September 5 {.dateline}
*In another one of the endless Phoenix status meetings,* I realize that
the developers are even more behind than we feared. As Wes had
predicted, more and more work is being deferred to the next release,
including almost all of the testing.
This means that we'll be the ones finding the problems when they blow up
in production, instead of the Quality Assurance ([QA]{.smallcaps})
Department.
Great.
During a lull in the discussion, I look down at my phone and see an
e-mail from Patty. She wants to meet about resourcing, promising some
eye-opening surprises.
I open the attached spreadsheet, seeing an encouraging level of detail,
but on my minuscule phone screen, I can't make heads or tails of it. I
reply to Patty that I'm on the way and ask her to have Wes meet me
there.
When I arrive, I'm surprised to see that Wes has set up a projector,
displaying a spreadsheet on the wall. I'm excited that we're meeting to
analyze the situation, instead of just reacting to the daily fires.
I grab a seat. "Okay, whatcha got for me?"
Wes starts. "Patty did a great job putting this together. What we found
was---well, it was interesting."
Patty explains, "We did our interviews, collected the data, and then did
our analysis. Right now, these numbers are only for our key resources.
We're already seeing something troubling."
She points at a row in the spreadsheet. "First, we have a lot of
projects. Kirsten says she's officially managing about thirty-five major
business projects, each of which we have commitments to. Internal to
[IT]{.smallcaps} Operations, we've already identified over seventy
projects, and that number keeps growing with each person we interview."
"Wait," I say, genuinely startled, sitting upright in my chair. "We have
150 [IT]{.smallcaps} Operations people, right? If you've already found
over 105 projects, that's 1.5 people per project. Doesn't that seem like
a lot to you?"
Wes replies, "Totally. And we know that the project count is low. So by
the end, it'll probably be more like one person per project. That's
insane."
I ask, "How big are these internal projects?"
Wes switches tabs on the spreadsheet, showing the list of projects
they've inventoried, along with the estimated number of man-weeks.
"Consolidate and upgrade e-mail server," "Upgrade thirty-five instances
of Oracle databases," "Install supported Lemming database server,"
"Virtualize and migrate primary business applications," and so on.
I groan. While some projects are small, most seem like major
undertakings, estimated at three man-years or more.
When Patty sees the expression on my face, she says, "That was my
reaction, too. We're on the hook for a huge number of projects. So,
let's look at what our capacity is. This is a little harder, since we
can't just assign random people to any given project."
She continues, "When we looked at who was assigned to each project and
what their other commitments and availability were, here's what we
found."
When Wes flips to another spreadsheet tab, my heart drops.
"Grim, huh?" says Wes. "Most of our resources are going to Phoenix. And
look at the next line: Compliance is the next largest project. And even
if we only worked on compliance, it would consume most of our key
resources for an entire year! And that includes Brent, by the way."
Incredulous, I say, "You're kidding. If we put all our projects on hold
except for the audit findings, our key resources would be tied up for an
entire year?"
"Yep," Patty says, nodding. "It's hard to believe, but it just shows you
how much work is in that stack of audit findings."
I look down at the table, speechless.
If someone had shown me these figures during my first conversation with
Steve, I would have run from the room, screaming like a little boy.
It's not too late, I think, smiling at the image.
With practiced calm, I say, "Okay, knowing is always better than not
knowing. Keep going."
Wes looks back at the spreadsheet. "The third largest item is incident
and break-fix work. Right now, it's probably consuming seventy-five
percent of our staff's time. And because these often involve critical
business systems, incidents will take priority over everything else,
including Phoenix and fixing audit findings.
"By the way, did you know that yesterday, when we were talking with
Brent, we had to reschedule the interview twice because he had to go
help fix an outage? So there we were interrupting him from Phoenix work,
only to be interrupted by an outage!" he says, laughing.
I start to laugh, but then stop abruptly. "Wait. What outage? Why didn't
I hear about it? We can't keep running our organization like this!"
"Well, it was another [SAN]{.smallcaps} issue, but nothing critical,"
Wes replies. "A drive went bad a couple of months ago, so the
[SAN]{.smallcaps} was running with no redundancy. When another drive
failed, the entire volume went down. Brent had to help restore some of
the databases when we got the [SAN]{.smallcaps} back up."
Exasperated, I shout, "Dang it, Wes. That was completely preventable!
Get one of your junior guys to look at the logs every day for drive
failures. Maybe even have him visually inspect the drives and count all
the blinking lights. It's called preventive maintenance for a reason! We
need Brent on Phoenix, not piddly shit like this!"
Wes says defensively, "Hey, it's actually a little more complicated than
that. We put in the order for replacement drives, but they've been stuck
in Procurement for weeks. We had to get one of our vendors to give it to
us on credit. This wasn't our fault."
I lose my temper. "Wes, listen to me. [I DON'T CARE!]{.smallcaps} I
don't care about Procurement. I don't care how nice your inept vendors
are. I need you to do your job. Make sure this doesn't happen again!"
I take a deep breath. I realize my frustration is not because of the
drive failure, but because we're continually unable to stay focused on
the things that matter most to the company.
"Look, let's put this aside for now," I say, looking back at Wes. "I'm
serious about getting someone to look at that [SAN]{.smallcaps} daily,
though. Set up a meeting sometime next week for you, me, and Patty to
get to the bottom of these outages. We've got to figure out how to bring
down the amount of break-fix work so we can get project work done. If we
can't get Phoenix work done, it's jeopardizing the company."
"Yeah, I got it. I'll try to get it in before the Phoenix rollout." Wes
says, nodding sullenly. "And I'll get on that [SAN]{.smallcaps} issue
this afternoon."
"Okay, back to the spreadsheet," I say.
Patty observes glumly, "You're right. The one consistent theme in the
interviews was that everyone struggles to get their project work done.
Even when they do have time, they struggle to prioritize all their
commitments. People in the business constantly ask our staff to do
things for them. Especially Marketing."
"Sarah?" I ask.
"Sure, but it's not only her," she replies. "Practically every executive
in the company is guilty of going directly to their favorite
[IT]{.smallcaps} person, either asking a favor or pressuring them to get
something done."
"How do we change the game here and get resourced to do all these
projects properly?" I ask. "What should we be asking Steve for?"
Wes scrolls down his spreadsheet. "Based on our rough numbers, we'll
probably need to hire seven people: three database administrators, two
server engineers, one network engineer, and one virtualization engineer.
Of course, you know that it'll take time to find these people and then
another six to twelve months before they're fully productive."
Of course, I knew that new hires aren't productive right away. But it
was still dispiriting to hear Wes point out that real help was still a
long way off, even if Steve approved the headcount.
------------------------------------------------------------------------
*Later that day,* as I'm walking to our second [CAB]{.smallcaps}
meeting, I feel hopeful. If we can get our old change process going, we
might be able to quickly resolve one of the largest audit issues and get
some operational wins, as well.
I'm also pleased at how well Patty and Wes are working together.
As I near the conference room, I hear loud voices arguing.
"---then Patty got that engineer fired for doing his job. He was one of
our best networking people. That wasn't your call to make!"
No mistake. That's Wes hollering. Then I hear Patty reply heatedly,
"What? You signed off on that termination! Why is this suddenly my
fault?"
I knew it was too good to be true.
I then hear John say, "That was the right call. We're going into our
third year of a repeat audit finding around change controls. That goes
in front of the audit committee. Next time around, it probably won't be
just an engineer getting fired, if you get my drift."
Wait. Who invited John to this meeting?
Before John can make things any worse, I quickly step through the door
and say cheerfully, "Good afternoon, everyone! Are we ready to review
some changes?"
Fourteen people turn to look at me. Most of the technical leads from the
various groups are sitting at the table. Wes is standing up behind his
chair, fuming, while Patty is standing in the front of the room, arms
crossed.
John sits in the back of the room, with his three-ring binder open, very
much an unwanted guest.
Using both hands, I set down my antique laptop. It hits the table with a
thud and a clatter as the battery falls off, the tape no longer holding
it in place, and then I hear a scratching sound as the disk drive spins
down.
Wes' angry expression disappears momentarily. "Wow, boss, nice gear.
What is that, a Kaypro II? I haven't seen one of those in about thirty
years. Let me know if you need an 8-inch floppy to load CP/M on
it---I've got one in my attic at home."
Two of the engineers snicker and point. I smile briefly at Wes, grateful
for the comic relief.
Remaining standing, I say to everyone, "Let me tell you why I assembled
all of you here. Given the urgency of Phoenix, you can bet your ass that
I wouldn't waste your time if I didn't think this was important."
I continue, "First, the events that led to the [SAN]{.smallcaps} and
payroll failure on Tuesday must not happen again. What started off as a
medium-sized payroll failure snowballed into a massive friendly-fire
[SAN]{.smallcaps} incident. Why? Because we are not talking to one
another about what changes we're planning or implementing. This is not
acceptable."
"Second, John is right. We spent yesterday morning with our auditors,
discussing a bunch of deficiencies they found," I continue. "Dick Landry
is already crapping bricks because it could impact our quarterly
financial statements. We need to tighten up our change controls, and as
managers and technical leads, we must figure out how we can create a
sustainable process that will prevent friendly-fire incidents and get
the auditors off our back, while still being able to get work done. We
are not leaving this room until we've created a plan to get there.
Understood?"
When I'm satisfied that everyone has been properly cowed, I open it up
for discussion. "So what's preventing us from getting there?"
One of the technical leads quickly says, "I'll start. That change
management tool is impossible to use. There's a million mandatory fields
and most of the time, the drop down boxes for the 'applications
affected' don't even have what I need. It's why I've stopped even
putting in change requests."
Another lead hollers out, "He's not kidding. To follow Patty's rules, I
have to manually type in hundreds of server names in one of the text
boxes. Most of the time, there's not enough room in the field! A hundred
server names are supposed to fit in a sixty-four-character text box?
What idiot built that form?"
Again, more unkind laughter.
Patty is bright red. She shouts, "We need to use drop-down boxes so we
can maintain data integrity! And I'd love to keep the application list
up-to-date, but I don't have the resources. Who's going to keep the
application catalog and change management database current? You think it
just magically updates itself?"
"It's not just the tool, Patty. It's the entire broken process," Wes
asserts. "When my guys put in change requests, they have to wait a
lifetime to get approvals, let alone get on the schedule. We have the
business breathing down our neck to get crap done. We can't wait for you
to hem and haw, complaining that we didn't fill out the form right."
Patty snaps, "That's crap, and you know it. Your people routinely break
the rules. Like, say, when everyone marks all their change requests as
an 'urgent' or 'emergency change'. That field is only for actual
emergencies!"
Wes retorts, "We have to do that, because marking them urgent is the
only way to get your team to look at it! Who can wait three weeks for an
approval?"
One of the lead engineers suggests, "Maybe we make another field called
'extremely urgent?' "
I wait until the uproar quiets down. At this rate, we're getting nowhere
fast. Thinking furiously, I finally say, "Let's take a ten-minute
break."
When we reconvene the meeting, I say, "We are not leaving this meeting
without a list of authorized and scheduled changes that we're
implementing in the next thirty days.
"As you can see, my assistant has brought in a pile of blank index
cards. I want each group to write down every change they're planning,
one change per index card. I want three pieces of information: who is
planning the change, the system being changed, and a one-sentence
summary.
"I've drawn a calendar on the whiteboard where we will eventually post
approved changes according to their scheduled implementation," I
continue. "Those are the rules. Short and simple."
Wes picks up a pack of cards, looking at them dubiously. "Really? Paper
cards, in this day and age? How about we use that laptop of yours, which
probably even predates paper?"
Everyone laughs, but not Patty. She looks angry, obviously not pleased
with the direction things are going.
"This isn't like any change management process I've ever seen," John
says. "But I'll put my changes on the board, like the upcoming firewall
updates and monitoring changes that're scheduled for the next couple of
days."
Surprisingly, John's willingness to jump in inspires others, who begin
writing their planned changes on their cards.
Finally, Wes says, "Okay, let's try it. Anything is better than using
that busted change management tool."
One of the leads holds up a handful of cards. "I'm done with all the
database changes we're planning to make."
When I nod for him to proceed, he quickly reads one of the cards:
"Execute the vendor-recommended database maintenance script on Octave
server [XZ]{.smallcaps}577 to fix retail store [POS]{.smallcaps}
performance issues. This affects the order entry database and
applications. We' d like to do this next Friday evening at 8:30 p.m."
I nod, pleased with the clarity of his proposed change. But Wes says,
"That's not a change! That's just running a database script. If you were
changing the script, then we' d have something to talk about. Next."
The lead replies quickly, "No, it's definitely a change. It temporarily
changes some database settings, and we don't know what production impact
it could have. To me, it's just as risky as a database configuration
change."
Is it a change or not? I can see both sides of the argument.
After thirty minutes of arguing, it's still not clear that we know the
definition of what a "change" should be.
Was rebooting a server a change? Yes, because we don't want anyone
rebooting servers willy-nilly, especially if it's running a critical
service.
How about turning off a server? Yes, for the same reason.
How about turning on a server? No, we all thought. That is, until
someone came up with the example of turning on a duplicate
[DHCP]{.smallcaps} server, which screwed up the entire enterprise
network for twenty-four hours.
A half hour later, we finally write on the whiteboard: "a 'change' is
any activity that is physical, logical, or virtual to applications,
databases, operating systems, networks, or hardware that could impact
services being delivered."
I look at my watch, alarmed that we've been in the room for nearly
ninety minutes, and we still haven't even approved our first change. I
push us to move faster, but at the end of our two-hour meeting, we've
only posted five changes on the whiteboard.
Surprisingly, no one else seems frustrated except me. Everyone is
vigorously engaged in the discussion, even Patty. Everyone is discussing
risks of the proposed changes, even discovering that one change wasn't
necessary.
Encouraged, I say, "We'll pick this up on Monday. Get all your cards to
Patty as soon as you can. Patty, what's the best way for us to process
all the cards?"
She says tersely, "I'll set up a basket later today. In the meantime,
pile them up at the front of the table."
When we adjourn, several people tell me on their way out, "Great
meeting," and "I wish we had more time to discuss changes," and "I'm
looking forward to Monday."
Only Patty has remained behind, arms crossed. "We spent a lot of blood,
sweat, and tears creating our old change management policy, and everyone
still blew it off. What makes you think this will be any different?"
I shrug. "I don't know. But we'll keep trying things until we have a
system that works, and I'm going to make sure everyone keeps helping us
get there. It's not just to satisfy the audit findings. We need some way
to plan, communicate, and make our changes safely. I can guarantee you
that if we don't change the way we work, I'll be soon out of a job."
Pointing at her old policy document, she says, "We shouldn't just throw
all this work out the window. We spent weeks designing it and hundreds
of thousands of dollars with consultants, changing our tools around."
She tears up slightly. I remind myself of how long she's been trying to
get this process integrated into the organization.
"I know that there was a lot of good work put into all this process," I
say sympathetically. "Let's face it, though. No one was actually
following it, as the auditors pointed out. We also know that people were
gaming the system, just trying to get their work done."
I say sincerely, "We may be starting over, but we need all your
experience and skills to make this work. It's still your process, and I
know this is absolutely critical to our success."
"Okay," she says, sighing in resignation. "I suppose I care more about
our survival than whether we use our old process or not."
Her expression changes. "How about I write up the outputs of the meeting
and the new instructions for submitting requests for changes?"
------------------------------------------------------------------------
*Later that afternoon,* I'm back in the Phoenix war room when Patty
calls. I run out to the hallway. "What's up?"
She sounds stressed. "We've got a problem. I was expecting we' d have
fifty changes for us to review next week. But we're already up to 243
submitted changes. I keep getting e-mails from people saying to expect
more cards over the weekend... I think we're looking at over four
hundred changes being made next week!"
Holy crap. Four hundred? How many of these four hundred changes are high
risk, potentially affecting Phoenix, the payroll application, or worse?
I suddenly remember Rangemaster duty in the Marines. As Rangemaster, I
was responsible for the safety of everyone on the firing range. I have a
horrifying vision of a mob of four hundred unsupervised
eighteen-year-olds jumping out of trucks, running to the firing range,
firing their rifles into the air, hooting and hollering...
"Umm, at least people are following the process," I say, laughing
nervously.
I hear her laugh. "With all the change requests coming in, how are we
going to get them all authorized by Monday? Should we put a temporary
hold on changes until we get them all approved?"
"Absolutely not," I say immediately. "The best way to kill everyone's
enthusiasm and support is to prevent them from doing what they need to
do. I doubt we'll get a second chance to get this right.
"Send out an e-mail telling everyone to submit any change for next week
by Monday. Monday's changes will not need to be authorized but changes
for the remainder of the week will. No exceptions."
I can hear Patty typing over the phone. "Got it. I'll probably need to
have some of my people help organize all of the change cards over the
weekend. Frankly, I'm stunned by how many changes there are."
So am I.
"Excellent," I say, leaving my concerns unvoiced.
[]{#10-ch7.xhtml}
# Chapter 7 {.ch-title}
## • Friday, September 5 {.dateline}
*When I get back to my desk,* I'm looking for the Advil I usually keep
on my desk when my cell phone rings. "Palmer here," I say, rummaging
through my drawers.
"Hi, Bill. It's Stacy---Steve's assistant. I'm glad I caught you.
There's a potential new board member in town named Erik Reid who needs
to talk with all the [IT]{.smallcaps} executives. He's wondering if
you're available for an hour right now."
"Hang on a sec while I pull up my calendar," I reply.
The screen resolution on this old laptop is so low that the weekly view
is unusable. I switch to the daily view, and the screen goes blank as
the laptop chatters and whirs.
I give up waiting and say earnestly, "Look, I know this is important,
but can't this wait until Monday? You would not believe the day I'm
having."
She replies quickly, "I wish it could wait, but he's only in town today.
And from what I've seen, Bob Strauss, you know, the new company
chairman, and Steve are in a tizzy because they're worried that Erik may
not accept our offer to join the board. He's apparently some technology
hotshot, and Bob and Steve managed to get him in town to woo him. He
insists on meeting the [IT]{.smallcaps} leadership team before he
leaves."
"Okay, I'm in," I say, suppressing a sigh.
"Good. We have him set up in the conference room right by me. Come on
over---there's a great coffee and doughnut spread here."
I laugh. "Well, that's the first good news I've had all day. I'm on my
way."
As I walk into the conference room in Building 2, I wave to Stacy,
pondering the strange world I've been pulled into. I'm not used to being
thrown into the middle of board politics.
As promised, by the window is a large cart with four types of coffee and
six boxes of Vandal Doughnuts, a place in town so famous, there's a long
line at almost all hours of the day.
A man in wrinkled khaki pants and an untucked denim button-down shirt is
kneeling in front of the cart, unpacking the doughnuts onto two
platters. I had no idea Vandal Doughnuts delivered.
I pick up a cup and start filling it with coffee, eyeing all the
doughnuts. I say, "You know, my wife and I are huge fans of you guys.
Back when we were dating, almost every Friday night we' d wait in line
for twenty minutes to get our fix. Now that we have kids, she just sends
me out to get them for her. Maybe I'll take one home for her tonight."
I grab a huge chocolate doughnut covered with Froot Loops, as well as a
giant frosted glazed doughnut with bacon on it and three more that look
tasty.
The deliveryman stands up and looks at me, smiling. "Yeah, I can see
why. I'm really enjoying these doughnuts. I've never had anything like
them before. I've probably eaten five since I've been here. Not great
for the low-carb diet I'm on, though..."
Holding out his hand, he says, "I'm Erik."
Holy crap.
I look down. In one hand I have a cup of coffee, and in the other hand
I'm holding an overflowing plate.
"Oh, jeez," I say hurriedly. I put everything on the table behind me,
turning around again to shake his hand. "Good to meet you. I'm
Bill---Bill Palmer."
I look him over again. He has a mustache, is around six feet tall and a
bit overweight, and has long graying hair that touches his shoulders.
When standing, he looks even more like someone from a delivery company
than a potential board member, let alone some "technology hotshot."
Taking another look at him, I correct myself---I'm pretty sure a
delivery person would have less-wrinkled clothes.
"No worries," he says cheerily, grabbing another doughnut from the tray
and gesturing toward the table. "Have a seat. I was hoping to talk with
each of the [IT]{.smallcaps} leaders while I was in town. Of course, I
had to talk with Steve and---umm---what's your [CFO]{.smallcaps}'s name?
Darren? Dale? Whatever---they seemed like nice enough fellows. Maybe a
little blind, but..."
He gestures dismissively. "I talked with your Development guy, too. Umm,
Cary? Calvin? And, I'll be talking with your Security guy next, Jimmy,
and your Retailing person, Sylvia."
I try to hide my pained expression as he's managed to mangle everyone's
name.
"I see... And what have your impressions been so far?" I ask carefully.
He stops chewing and brushes some crumbs off his mustache, pausing to
think. "It looks like you're in a world of hurt. [IT]{.smallcaps}
Operations seems to have lodged itself in every major flow of work,
including the top company project. It has all the executives hopping
mad, and they're turning the screws on your Development guy to do
whatever it takes to get it into production."
He looks me in the eye. "You're having chronic [IT]{.smallcaps}
availability issues, causing company executives to be splashed on the
front-page news. And now, Audit is hot on your tail, meaning more
possible front-page news, and maybe even an adverse footnote on the
quarterly financial statement. And anyone who knows anything about
Phoenix knows that there's a lot more bad news to come on that front..."
As he's talking, I feel my face flush red, whether in anger or
embarrassment I'm not sure.
"Things don't look so good for you, pal," he says. "At least not to a
prospective board member, who's supposed to oversee and assess your
performance."
I purse my lips, resisting the urge to say something that sounds
defensive. I say neutrally, "Steve asked me to take this job three days
ago. Even though I kept saying no, he eventually convinced me to accept
the position. There've sure been a lot of surprises..."
He looks at me for a moment, and then guffaws. "Yeah, I'll bet!" he
says, disarmingly. "Ha-ha! Surprises. So, what's your game plan for
righting the ship?"
I look up for a moment, trying to figure out how to describe the few
corrective actions I've put in place after this week. I reply,
"Honestly, I'm still trying to get some situational awareness. Mostly,
I'm being whiplashed from one emergency to another. I do know that we
need more rigor and discipline in how we work. I'm trying to figure out
what processes we rely on to get work done around here. Based on what
I've seen, I know we need to improve them so we stop shooting ourselves
in the foot."
I think for a moment. "That's just to get us out of firefighting mode.
I'm still trying to figure out how to resource an audit remediation
project that just fell out of the sky. Based on what I've seen, we're
seriously behind on our commitments. We're obviously going to need more
people or get a lot more efficient to get all our committed work done."
Erik frowns. " 'Rigor and discipline,' huh? I'm guessing you were a
non-commissioned officer in the military. An [E]{.smallcaps}-6. No,
you're too young. An [E]{.smallcaps}-5, right?"
I blink in surprise. "That's right. [E]{.smallcaps}-5, US Marine Corp.
How did you know?"
"Lucky guess," he says glibly. "For one thing, you sure don't look like
a chemical engineer or an auditor."
"What?" I ask.
"You're right that you can't achieve the strategic until you've mastered
the tactical," he says, ignoring my question. "But what worked for you
in the Marines will never work here, considering how they run this
circus. Instead of one general in your chain of command, you've got ten
generals calling the shots here, and all of them have a direct line to
each and every private in your company."
I say slowly, "Wait. You're saying rigor and discipline don't matter?"
"Of course they matter," he says sternly. "But you have a much bigger
problem, and it has nothing to do with your argle-bargle of
'efficiencies' and 'process.' Your problem right now is that you
obviously don't actually know what 'work' is."
I stare at him.
Who is this buffoon? For a moment, I wonder whether I can assign Wes or
Patty to deal with this guy, but Steve obviously wanted me to handle
this personally.
"I know what work is," I say slowly. "We do it every day. If we can't
keep the lights on and finish the work that the business requires, I'm
out of a job."
"What then, exactly, is your definition of 'work?' " he asks, with a
genuinely curious expression on his face.
"Well, I can tell you that Steve has stated over and over to me in no
uncertain terms that we need to get Phoenix out the door. That qualifies
as work in my mind."
He looks up, appearing to have a conversation with himself. "Yes, that's
certainly one type of work. But you're still missing the three other
types of work that [IT]{.smallcaps} Operations is responsible for. To
me, that's nowhere near the level of understanding of work you need in
order to fix your problems around project deliverables, outages, and
compliance."
He stands up. "Grab your stuff. We're going for a ride."
Confused and annoyed, I look at my watch. It's 4:17 p.m. I have too much
to do to waste much more time with this guy.
Then he's gone. I look out in the hallway, but he's not there, either. I
look at Stacy questioningly, and she points toward the elevators. I run
to catch up with him.
He's walked into an elevator that just opened. When he turns around, he
holds the door open for me. "You probably don't even see when work is
committed to your organization. And if you can't see it, you can't
manage it---let alone organize it, sequence it, and have any assurance
that your resources can complete it."
I frown, recalling my last meeting with Wes and Patty when they
struggled to come up with the list of all our commitments to the
organization. I say, "What is this? Some kind of intelligence test?"
"Yes, you could say that," he replies. "But don't worry. It's not just
you. Steve has to pass his intelligence test, too. And for that matter,
Dick, as well."
I follow him to his blue subcompact rental car and we drive five minutes
to [MRP]{.smallcaps}-8, one of our manufacturing plants. It's enormous,
probably four times bigger than my building, but this one is in
immaculate condition, with some obvious recent renovations and add-ons.
A security guard in her late fifties greets us, "Good afternoon, Dr.
Reid. How nice to see you! How are you doing? It's been a long time."
Erik shakes her hand warmly, replying with a wink, "Great seeing you
again, Dorothy. We're just here to get a birds-eye view of the plant
floor. Can we still get on the catwalk?"
She replies with a flirtatious smile, "It's closed to most people, but
for you, I think we can make an exception."
I look at Erik suspiciously. He supposedly couldn't get anyone's name
right, and yet he apparently remembers the name of some security guard
from years past. And no one ever mentioned anything about a *Dr. Reid*.
After climbing five flights of stairs, we're standing on a catwalk that
overlooks the entire plant floor, looking like it goes on for at least
two city blocks in every direction.
"Look down there," he says. "You can see loading docks on each side of
the building. Raw materials are brought in on this side, and the
finished goods leave out the other. Orders come off that printer down
there. If you stand here long enough, you can actually see all the
[WIP]{.smallcaps}, that's 'work in process' or 'inventory' for plant
newbies, make its way toward the other side of the plant floor, where
it's shipped to customers as finished goods."
"For decades at this plant," he continues, "there were piles of
inventory everywhere. In many places, it was piled as high as you could
stack them using those big forklifts over there. On some days, you
couldn't even see the other side of the building. In hindsight, we now
know that [WIP]{.smallcaps} is one of the root causes for chronic
due-date problems, quality issues, and expediters having to rejuggle
priorities every day. It's amazing that this business didn't go under as
a result."
He gestures broadly with both arms outstretched, "In the 1980s, this
plant was the beneficiary of three incredible scientifically-grounded
management movements. You've probably heard of them: the Theory of
Constraints, Lean production or the Toyota Production System, and Total
Quality Management. Although each movement started in different places,
they all agree on one thing: [WIP]{.smallcaps} is the silent killer.
Therefore, one of the most critical mechanisms in the management of any
plant is job and materials release. Without it, you can't control
[WIP]{.smallcaps}."
He points at a desk near the loading docks closest to us. "See that desk
over there?"
I nod but also look pointedly at my watch: 4:45 p.m.
Oblivious to my impatience, he says, "Let me tell you a story. Decades
ago, there used to be a guy named Mark. He was the supervisor for that
first work center, right down there by that desk. Those racks hold the
folders for incoming jobs. Isn't it amazing that those folders look
exactly like they did back then?
"At any rate," he continues, "one day I see Mark picking up a folder to
start some job. I ask him, 'On what basis did you choose that job,
versus any of the others?'
"And you know what he tells me? He says, 'It's a job that requires this
work center first. And we're open.' "
He shakes his head incredulously. "I could hardly believe it. I tell
him, 'Your station is just the first of twenty operations. You don't
factor the availability of any of the other nineteen stations in your
decision?' And he replies, 'Well, no. This is the way I've done it for
twenty years.' "
He laughs. "I suppose to him, it sounds like a reasonable way to pick
which job to perform. He's keeping the first station busy, and it's
similar to first-in, first-out scheduling. But of course, now everyone
knows that you don't release work based on the availability of the first
station. Instead, it should be based on the tempo of how quickly the
bottleneck resource can consume the work."
I just stare at him blankly.
He continues, "Because of how Mark was releasing work, inventory kept
piling up in front of our bottleneck, and jobs were never finished on
time. Every day was an emergency. For years, we were awarded Best
Customer of the Year from our air freight shipment company, because we
were overnighting thousands of pounds of finished goods to angry
customers almost every week."
He pauses and then says emphatically, "Eliyahu M. Goldratt, who created
the Theory of Constraints, showed us how any improvements made *anywhere
besides the bottleneck* are an illusion. Astonishing, but true! Any
improvement made after the bottleneck is useless, because it will always
remain starved, waiting for work from the bottleneck. And any
improvements made before the bottleneck merely results in more inventory
piling up at the bottleneck."
He continues, "In our case, our bottleneck was a heat treat oven, just
like in Goldratt's novel, *The Goal*. We also had paint-curing booths
that later became constraints, too. By the time we froze the release of
all new jobs, you couldn't even see the bottleneck work centers because
they were surrounded by huge piles of inventory. Even from up here!"
Despite myself, I laugh with him. It's obvious in hindsight, but I can
imagine that to Mark, it was anything but obvious. "Look, thanks for the
history lesson. But I learned most of this already in business school. I
don't see how this could possibly be relevant to managing
[IT]{.smallcaps} Operations. [IT]{.smallcaps} is not like running a
factory."
"Oh, really?" he turns to me, frowning intensely. "Let me guess. You're
going to say that [IT]{.smallcaps} is pure knowledge work, and so
therefore, all your work is like that of an artisan. Therefore, there's
no place for standardization, documented work procedures, and all that
high-falutin' 'rigor and discipline' that you claimed to hold so near
and dear."
I frown. I can't figure out if he's trying to convince me of something I
already believe or trying to get me to accept an absurd conclusion.
"If you think [IT]{.smallcaps} Operations has nothing to learn from
Plant Operations, you're wrong. Dead wrong," he says. "Your job as
[VP]{.smallcaps} of [IT]{.smallcaps} Operations is to ensure the fast,
predictable, and uninterrupted flow of planned work that delivers value
to the business while minimizing the impact and disruption of unplanned
work, so you can provide stable, predictable, and secure
[IT]{.smallcaps} service."
Listening to him, I wonder if I should be writing this down.
He studies me closely. "Well, I can see that we're not ready to have
this discussion. Until you gain a better understanding of what work is,
any conversation we have about controlling work will be totally lost on
you. It would be like talking about acrobatics to someone who doesn't
believe in gravity yet.
"Rest assured, though," he says, pointing at the job release desk, "in
order to get to where you want to go, eventually you *will* need to
figure out what your equivalent to that desk is. You must figure out how
to control the release of work into [IT]{.smallcaps} Operations and,
more importantly, ensure that your most constrained resources are doing
only the work that serves the goal of the entire system, not just one
silo.
"Once you figure this out, young Bill, you will be well on your way
toward understanding the Three Ways," he says. "The First Way helps us
understand how to create fast flow of work as it moves from Development
into [IT]{.smallcaps} Operations, because that's what's between the
business and the customer. The Second Way shows us how to shorten and
amplify feedback loops, so we can fix quality at the source and avoid
rework. And the Third Way shows us how to create a culture that
simultaneously fosters experimentation, learning from failure, and
understanding that repetition and practice are the prerequisites to
mastery."
Although he now sounds oddly like Master Shifu in the movie *Kung Fu
Panda*, I'm listening intently. The need for rigor and discipline, and
constantly practicing and honing our skills are important lessons I've
kept with me from the Marines. The lives of my men depended upon it
there, and my job depends upon it here. Creating that predictability is
what I'm most intent on instilling in my [IT]{.smallcaps} Operations
group.
Erik hands me a slip of paper with a phone number on it. "Remember,
there are four types of work. You've named business project work as one.
When you have the other three, give me a call."
He takes out his car keys from his pocket and asks, "Do you want a lift
back to your office?"
------------------------------------------------------------------------
*It's 5:10 p.m.[ ]{.smallcaps}*when I finally get back to my cubicle. I
log back into my clunker laptop to reply to e-mails. But I can't
concentrate.
The last hour with Erik was like being in a strange parallel universe.
Or like being forced to watch a psychedelic movie made in a drug-induced
haze.
What did Erik mean that there were four categories of work?
I think back to my meeting with Wes and Patty. Wes mentioned we have a
separate list for [IT]{.smallcaps} infrastructure projects and business
projects. Are infrastructure projects another type of work?
As I ponder this, an e-mail notification window pops up on my screen,
indicating another e-mail expecting a response.
Are e-mails another type of work?
I doubt it. At the plant, Erik gestured to the entire plant floor. When
he mentioned "work," he seemed to mean it at an organizational level not
at the level of an individual contributor or manager.
I think about it some more. Then I shake my head and quickly e-mail
Steve, letting them know that I connected with Erik. I'm certain that a
decade from now, I'll be telling my friends about my brief encounter
with the raving madman on the manufacturing plant floor.
I need to get moving. Paige will be seriously annoyed if I come home
late on a Friday night. When I undock the laptop from the docking
station, an incredibly loud alarm pierces the air.
"Holy crap!" I shout, realizing that the sound is coming from my laptop.
Fumbling, I try to turn down the volume, to power it off, but nothing
makes the sound stop.
Frantically, I flip the laptop over and try to take the battery out, but
the tape keeps it attached. I grab a letter opener, finally managing to
slash the tape and get the battery out.
The laptop finally goes silent.
[]{#11-ch8.xhtml}
# Chapter 8 {.ch-title}
## • Monday, September 8 {.dateline}
*I spent all weekend* working on a PowerPoint slide deck for my meeting
with Steve this morning. Despite all that work, I wish I could have done
more to prepare.
I force myself to relax, visualizing having a healthy and vigorous
business discussion with him, walking out with everything I ask for. I
keep reminding myself how important this is for the company and my
organization. Everyone worked so hard to prepare for this and now
success or failure depends on how well I can communicate it all to
Steve.
Stacy smiles when I arrive and says warmly, "Go on in. I'm sorry we
could only get you thirty minutes."
I stop just inside the door, where Sarah is sitting with Steve at the
table. Sarah is telling Steve, "---you did an amazing job telling the
story of where we're going. These were some of the most skeptical
analysts around, but they clearly got excited. You've also given them a
reason for us to talk again when Phoenix goes live. They also seem
pretty impressed with the Phoenix roadmap."
They're telling analysts about the Phoenix roadmap? With so many
features being delayed to the next release, I question the wisdom of
making insufficiently informed promises to the market.
Steve just nods and replies happily, "Let's see if it changes their
impressions of us. Good job scheduling the call. Catch you later today
for the next one."
Sarah gives me a smile and says, "Hey, Bill. You're up and at it early
today, aren't you?"
Gritting my teeth, I just ignore her comment. "Good morning, everyone."
Trying to show an interest, I say, "Sounds like you had a good call."
Sarah smiles even more broadly. "Yes, they're really excited about our
vision and agree that it's going to be a real game changer for us. This
is what we need to change how we're perceived by the broader market and
Wall Street."
I look levelly at her, wondering whether these briefings that we give
the outside world might be what is causing such pressure on Chris' team
to release features so prematurely.
I grab a seat across from Steve. I can't quite turn my back on Sarah,
but I do my best.
I don't want to give Steve my handouts until Sarah has left the room,
but she continues to talk with Steve, recounting their meeting and how
to change the talk track for their next analyst call.
As they talk, all I can think of is how she's eating into my time with
Steve.
Eleven minutes later, Steve laughs at a joke from Sarah, and she finally
leaves the office, closing the door behind her. Steve turns to me and
says, "Sorry about going over---our next Phoenix analyst briefing is in
twenty minutes. So, what's on your mind?"
"You've impressed upon me from the very beginning that I need to help
maximize the probability of success of the Phoenix rollout," I start.
"Based on my observations of the past week, we are stretched dangerously
thin, to the point that I believe Phoenix is in considerable jeopardy.
"I've had my staff establish what our levels of demand and capacity
truly are," I continue. "We've started to inventory everything we're
being asked to do, regardless of how big or small. Based on the analysis
so far, it's clear to me that the demand for [IT]{.smallcaps} work far
exceeds our ability to deliver. I've asked them to make more visible
what the pipeline of work looks like, so we can make more informed
decisions about who should be working on what and when."
With as much gravitas as I can muster, I say, "One thing is very clear,
though. We are definitely understaffed. There's no way that we can
deliver everything we've promised. Either we need to cut down the
project list, or we've got to staff up."
Trying to replicate the reasoned and logical argument I've spent all
weekend rehearsing, I continue, "The other big problem is that we have
too many different projects competing for our attention. You've been
consistent and clear that Phoenix is the most important, but we can't
seem to keep resources dedicated to it. For instance, last Thursday,
internal audit delivered to us a set of findings that we must
investigate and assemble a response letter for in one week. Doing so
will impact Phoenix."
I've been watching Steve as I talked, and so far, he's remained
expressionless. I look at him calmly and ask, "What I'd like to get out
of our meeting is an understanding of the relative priority of Phoenix
versus the audit findings and to talk about the number of projects and
how to adequately staff them."
In my mind, I've done a good job of being the competent and passionate
manager who is dispassionately struggling to decide how to best serve
the business, without making moral judgments.
Steve replies in an exasperated voice, "What kind of bullshit
prioritization question is this? If I went to my board and told them
that I need to do either sales or marketing, and asked them which of
those I should do, I'd be laughed out of the room. I need to do both,
just like you need to do both! Life is tough. Phoenix is the top company
priority, but that doesn't mean you get to hold the
[SOX]{.smallcaps}-404 audit hostage."
I count to three before saying, "Obviously, I'm not being clear. Both
Phoenix and the compliance project share certain key resources, such as
Brent. The compliance project *alone* would tie up these people for a
year, but we need them focused on Phoenix. On top of that, our
infrastructure is so fragile, that we have daily failures, which often
require these same resources to restore normal operations. If a similar
outage to the payroll run failure happened today, we' d likely have to
pull Brent off both the Phoenix and compliance work to figure out what
went wrong."
I look at him dead-on and say, "We've looked at different resourcing
options, including hiring and moving people around, but none of them
will have any effect fast enough to make a difference. If Phoenix is
really the top priority, we need to put some of the compliance work on
hold."
"Out of the question," he says, before I can even finish. "I've seen
that big pile of audit findings, and we will be in very hot water if we
don't get those issues fixed."
This is definitely not going according to plan. "Okay..." I say slowly.
"We'll do our best, but let me state for the record that we're too
understaffed to do a good job on either one, let alone both."
I wait for him to acknowledge my point. Seconds go by before he finally
nods.
Realizing this is probably the best I'm going to get, I indicate to the
first page of the handout I gave him. I say, "Let's zoom up and talk
about project demand and capacity. We're currently supporting over
thirty-five business projects through Kirsten's Project Management
Office, and at current count, seventy-plus other smaller business
projects and internal initiatives. And there are others out there that
we just haven't counted yet. With our 143 [IT]{.smallcaps} Operations
people, nothing is getting done as promised."
I point him to the second page of the handout, saying, "As you can see,
my team and I have come up with a request for six additional resources
that we're most short-handed on."
I go for the close, saying, "My goal is to increase our throughput so we
won't be in this position again, and to get as many of these projects
done as we can. I'd like your approval to get these openings
immediately, so we can start our search. Talent like Brent is not easy
to find, and we need to start sooner rather than later."
In my rehearsals, this is when Steve would run his finger down the
figures, ask me some questions, and we' d have a meaningful discussion
about how to make the best trade-offs. Maybe he'd even pat me on the
back and compliment me on the quality of my analysis.
But Steve doesn't even pick up my handouts. Instead, he looks at me and
says, "Bill, Phoenix is already \$10 million over budget, and we must
get cash-flow positive soon. You have some of the most expensive
resources in the entire company. You have to use what you've got."
He crosses his arms and continues, "Last year, we had some
[IT]{.smallcaps} analysts come in and benchmark our company against our
peers. They told us that we're spending way more on [IT]{.smallcaps}
than our competitors.
"You may think that with three thousand employees, six more employees
won't make a difference. But, trust me, every expense is under scrutiny.
If I can't close the profitability gap, I'll have to do another layoff.
Your math of adding another \$2 million in labor costs just doesn't
work."
He continues in a more sympathetic voice. "My suggestion to you? Go to
your peers and make your case to them. If your case is really valid,
they should be willing to transfer some of their budget to you. But let
me be clear: Any budget increases are out of the question. If anything,
we may have to cut some heads in your area."
I spent hours role-playing worst-case scenarios over the weekend.
Apparently, I'm going to have to practice being more pessimistic.
"Steve, I don't know how I can be more clear about this," I say, feeling
a little desperate. "This stuff isn't magic. All this work being piled
on us is done by real people. Commitments like the compliance work are
made without any regard for what's already on people's plates, like
Phoenix."
Realizing I have little to lose, but trying to shock some sense into
him, I say, "If you really care about closing the gap with the
competition by having Phoenix succeed, you sure aren't acting like it.
To me, it seems like you're just being suckered to rush to the gunfight
late, showing up with only a knife."
I expected some kind of reaction but he merely leans back, crossing his
arms in front. "We're all doing our best. So you better go back and do
the same."
Just then, the door opens as Sarah walks in. "Hi, Steve. Sorry to
interrupt, but we have the next analyst call in two minutes. Shall I
dial us in?"
Shit. I look down at my watch. 9:27.
She even robbed me of my last three minutes.
Utterly defeated, I finally say, "Okay, got it. Keep pushing. I'll keep
you posted."
Steve nods in thanks, and then turns to Sarah as I close the door behind
me. On my way out, I toss the presentation I had worked on all weekend
into Stacy's recycling bin.
------------------------------------------------------------------------
*I try to wave away* the stench of failure as I walk to the
[CAB]{.smallcaps} meeting. I'm still thinking about how I'm going to
break the bad news to Wes and Patty when I walk into the conference room
that Patty has coined the Change Coordination Room.
All thoughts of Steve disappear when I see what's there.
Almost every area of the wall is now covered in whiteboards. Index cards
cover nearly every inch of the whiteboards on two of the walls. It's not
just one deep---in some places there are hooks attached to the board,
with ten cards hanging off them.
On the conference room table are twenty, maybe even thirty, more piles
of cards.
On the far side of the table, two guys who work for Patty have their
backs to us, studying a card. After a moment, they tape it between two
other cards in front of them.
"Holy crap," I say.
"We've got a problem." Patty says from behind me.
"Not enough space for more whiteboards?" I say, only half joking.
Before Patty answers, I hear Wes enter the room. "Holy shit!" he says.
Where did all these cards come from? Are they all for this week?"
I turn to ask him, "Are you surprised? Most of these are coming from
your group."
He looks around at all the boards and then at the cards on the table, "I
knew that my guys were really busy, but, there must be a couple of
hundred changes here."
Patty turns her laptop around to show us the spreadsheet she has open,
"Since last Friday afternoon, there have been 437 changes submitted for
this week."
Wes for once is speechless. He finally shakes his head and says, "And
now we're supposed to go through and approve all of them? This meeting
was only scheduled for an hour---we' d need days to go through all of
these!"
He looks at me. "Mind you, I'm not saying that we shouldn't, but if
we're going to do this every week..."
Again, Wes stops speaking, overwhelmed at the task in front of us.
Quite honestly, I feel the same way. Apparently, getting all the
managers to submit their changes for the week was just the first step. I
didn't expect that the process would fall apart as we went beyond
collecting the data and actually set out to process and authorize the
changes.
I force myself to say cheerfully, "This is a great start. Like most
things, things get worse before they get better. We've got enthusiastic
support from the technical managers, so now we've got to figure out how
to get these changes scrutinized and scheduled on an on-going basis. Any
ideas?"
Patty is first to speak up. "Well, no one says that we have to be the
ones reviewing all the changes---maybe we can push down some of these to
delegates."
I listen to Wes and Patty trade ideas back and forth before I say,
"Let's go back to our goals: get the left and right hands to know what
the other is doing, give us some situational awareness during outages,
and give audit some evidence that we're addressing change control.
"We need to focus on the riskiest changes," I continue. "The 80/20 rule
likely applies here: Twenty percent of the changes pose eighty percent
of the risk."
I stare again at piles of cards in front of us and pick up a couple at
random, searching for some inspiration.
Holding up a card that has a big frowny face drawn on it, I ask, "What's
[PUCCAR]{.smallcaps}?"
"That worthless app," Wes says with disgust, "is the Parts Unlimited
Check Clearing and Reconciliation application that someone implemented
almost two decades ago. We call it 'pucker' because every time we change
it, it blows up, and no one knows how to fix it. The vendor went out of
business during the dot-com boom, but we've never gotten funding to
replace it."
I ask, "If we know it's that prone to crashing, why do we need to change
it?"
Wes says quickly, "We try not to. But sometimes the business rules
change, and we also have to keep it patched. It's running an operating
system that's out of maintenance, so it's always dicey..."
"Good! It's a risky change. What other types of changes are being
submitted like [PUCCAR]{.smallcaps}?" I ask.
We make a pile of nearly fifty cards proposing changes to the Rainbow,
Saturn, and Taser applications, and also changes to the network and
certain shared databases, which could impact a significant portion, or
even all, of the business.
"Even looking at those cards makes my heart palpitate," Wes says. "These
are some of the dangerous changes we make around here."
He's right. I say, "Okay, let's mark all of these as 'fragile.' These
are high risk and must be authorized by the [CAB]{.smallcaps}. Patty,
changes like this should be at the top of the pile during our meetings."
Patty nods, taking notes saying, "Got it. We're predefining high-risk
categories of change that not only must have change requests submitted,
but must have authorization before being scheduled and implemented."
We quickly create a list of the top ten most fragile services,
applications, and infrastructure. Any change request that could affect
any of these will be immediately flagged for [CAB]{.smallcaps} scrutiny.
Patty adds, "We need to create some standard procedures around these
changes---like when we'll want them implemented---and have key resources
not only aware of them but also standing by, just in case things go
wrong---even the vendors."
She adds with a half smile, "You know, like having firefighters and
ambulances lined up on the runway, ready to spray safety foam when the
airplane lands in flames."
Wes laughs and adds wryly, "Yeah, in the case of [PUCCAR]{.smallcaps},
have the coroner stock up on a bunch of body bags, too. And a
[PR]{.smallcaps} person ready to handle the angry phone calls from the
business, saying that some customers were allergic to the foam we used."
I laugh. "You know, that's an interesting idea. Let's let the business
choose the foam. There's no reason why all the responsibility should
rest on our shoulders. We can send an e-mail out to the business ahead
of time and ask when the best implementation time would be. If we can
give them data on the outcomes of previous changes, they may even
withdraw the change."
Patty is typing away. "Got it. For these types of changes, I'll have my
staff generate some reports on the changes' success rates and any
associated downtime. This will help the business make more informed
decisions around the changes."
I'm extremely pleased with Patty's idea and am confident that we're on
the right track. "Okay, that still leaves four hundred cards to go. Any
ideas?"
Wes has been going through the cards methodically, creating two big
stacks of cards next to him. He picks a card from the bigger pile, "This
pile has changes we do all the time. Like this one about the monthly tax
table upload to the [POS]{.smallcaps} systems. I don't think we should
suspend any of these changes.
"On the other hand, these changes are stuff like 'increasing the Java
application server thread pool size,' 'installing the Kumquat vendor
application hotfix to resolve performance issue,' and 'resetting the
Kentucky data center load balancer to default duplex settings.'
"What the hell do I know about these things?" Wes says. "I just don't
know enough about the context to have an actual opinion. I don't want to
be like a seagull, flying in, crapping on people, and then flying away,
you know?"
Excited, Patty says, "Excellent! The first ones are the low-risk changes
that [ITIL]{.smallcaps} calls 'standard changes.' For changes we've done
many times before successfully, we just preapprove. They still need to
be submitted, but they can be scheduled without us."
When everyone nods, she continues, "That leaves about two hundred
changes that are medium-risk changes that we still need to look at."
"I agree with Wes," I respond. "For these, we need to trust that the
manager knows what he or she is doing. But I'd like Patty to verify that
people have appropriately informed anyone they could affect, and gotten
the 'okay to proceed' from all of them."
I think for a moment and say, "Take John's tokenization application.
Before that change request would even come to us, I would expect him to
get the nod from the application and database owners, and also the
business. If he's done that, that's good enough for me. I view our role
as making sure that he's dotted the i's and crossed the t's. At this
level, I care more about the integrity of the process, not so much about
the actual changes."
Patty is typing away. "Let me see if I've got this right: For the 'messy
middle changes,' we're deciding that the change submitter has
responsibility and accountability for consulting and getting approval
from people potentially affected. Once they do that, they submit their
change card for us to review and approve for scheduling."
I smile and say, "Yep. Work for you, Wes?"
At last, he says, "I think it'll work. Let's give it a shot."
"Good," I say. Then I say to Patty, "You can help make sure the change
requesters are actually doing all the work beforehand?"
Patty smiles and says, "With pleasure."
She looks up at the board, tapping a pen on the table while she thinks.
She says, "Today is Monday. We've already said today's changes are
cleared for implementation. I propose we extend the amnesty period
through tomorrow, and assemble a full [CAB]{.smallcaps} meeting for
Wednesday, with the intent of scheduling the rest of the changes. That
should give everyone enough time to prepare."
I look at Wes. He says, "This is good, but I'm already thinking about
next week. We should tell everyone to keep the change requests coming
in, and let's set up the weekly [CAB]{.smallcaps} meetings starting
Friday the nineteenth."
Patty looks as pleased as I am that Wes is planning ahead to the
following week, instead of griping. She says, "I'll have instructions
sent to everyone in the next couple of hours."
After she finishes typing, she adds, "One last thing. I just want to
point out that we're tying up two people, as well as myself, running
this manual process. It's very labor intensive. Eventually, we're going
to have to think about some way to automate this."
I nod. "No doubt that this isn't sustainable in its current form. But
let's get a couple of [CAB]{.smallcaps} meetings under our belt and nail
down what exactly the rules are. I promise you that we'll revisit this."
The meeting winds down and we all leave smiling. That's a first for my
team.
[]{#12-ch9.xhtml}
# Chapter 9 {.ch-title}
## • Tuesday, September 9 {.dateline}
*I'm in the most ruthless budget meeting* I've ever attended. Dick sits
in the back of the room, listening attentively and occasionally
officiating. We all defer to him, as he'll create the first cut of the
annual plan. Sarah sits next to him, tapping away on her iPhone.
I finally pick up the phone. It must be a genuine emergency. It's been
vibrating almost nonstop for the past minute.
I read, "Sev 1 incident: credit card processing systems down. All stores
impacted."
Holy crap.
I know I've got to leave this meeting, despite knowing that everyone
will try to steal my budget. I stand up, struggling with the large
laptop, trying to keep more pieces from falling off. I almost make it
out when Sarah says, "Another problem, Bill?"
I grimace. "Nothing that we can't handle."
In reality, any Sev 1 outage automatically qualifies as a very big
problem, but I don't want to give her any ammunition.
When I get to the [NOC]{.smallcaps}, I grab the seat next to Patty, who
is coordinating the call. "Everyone, Bill just joined us. To catch you
up, we have confirmed that the order entry systems are down and we have
declared a Sev 1 incident. We were just trying to establish what
changed."
She pauses, looking at me. "And, I'm not confident we actually know."
I prompt everyone, "Patty asked a pretty simple question. So, what were
all the changes made today that could have led to this outage?"
There is an awkward silence that stretches on as people either look down
or look around at one another suspiciously. Everyone is avoiding eye
contact.
I'm about to say something when I hear, "This is Chris. I told Patty
this before, and I'm telling you again now, none of my developers
changed anything. So cross us off your hit list. It was probably a
database change."
Someone at the end of the table says angrily, "What? We didn't make any
changes---well, not on anything that could have impacted the order entry
systems. Are you sure it wasn't an operating system patch gone wrong
again?"
Someone two seats over then sits up and says heatedly, "Absolutely not.
We don't have any updates scheduled to hit those systems for another
three weeks. I'd bet fifty bucks it was a networking change---their
changes are always causing problems."
Slapping both hands over his eyes, Wes shouts, "For crying out loud,
guys!"
Looking exasperated and resigned, he says to someone across the table,
"You need to defend your honor, too? Everyone might as well have a
turn."
Sure enough, the Networking lead across the table from him holds up both
hands, looking hurt and aggrieved. "You know, it really isn't fair that
Networking keeps getting blamed for outages. We didn't have any changes
scheduled for today."
"Prove it," the database manager challenges.
The Networking lead turns bright red, his voice cracking. "This is
bullshit! You're asking me to prove that we didn't do anything. How the
hell do you prove a negative? Besides, I'm guessing the problem is a bad
firewall change. Most of the outages in the last couple of weeks were
caused by one of them."
I know I should probably put an end to this madness. Instead, I force
myself to lean back in my chair and keep observing, one hand covering my
mouth to hide my angry scowl and to keep me from saying something rash.
Patty looks exasperated and turns to me. "No one from John's team is
present on the call. His team handles all the firewall changes. Let me
try getting a hold of him."
I hear the sounds of loud tapping on a keyboard from the speakerphone,
and then a voice says, "Umm, can someone try it now?"
There are sounds of multiple people typing on laptop keyboards, as they
try to access the order entry systems.
"Hold it!" I say loudly, jumping halfway out of my chair, pointing at
the speakerphone. "Who just said that?"
An awkward silence lengthens.
"It's me, Brent."
Oh, man.
I force myself to sit down again and take a long, deep breath. "Brent,
thanks for the initiative, but, in a Sev 1 incident, we need to announce
and discuss any actions before taking them. The last thing we want to do
is to make things worse and complicate establishing root cause---"
Before I can finish, someone at the other end of the table interrupts
from behind his laptop, "Hey, the systems are back up again. Good work,
Brent."
Oh, come on.
I press my lips together in frustration.
Apparently, even undisciplined mobs can get lucky, too.
"Patty, wrap this up," I say. "I need to see you and Wes in your office
immediately." I stand up and leave.
I remain standing in Patty's office until I have both of their
attention. "Let me make myself clear. For Sev 1 incidents, we cannot fly
by the seat of our pants. Patty, from now on, as the person leading a
Sev 1 incident call, I need you to start the call presenting a timeline
of all relevant events, especially changes.
"I'm holding you responsible for having that information close-at-hand,
which should be easy since you also control the change process. That
information comes from you, not all the yahoos on the conference call.
Is that clear?"
Patty looks back at me, obviously frustrated. I resist the urge to
soften my words. I know she's been working hard, and I've been piling
even more onto her lately.
"Yeah, totally clear," she says wearily. "I'll work on documenting that
process and will institute it as quickly as I can."
"Not good enough," I say. "I want you to host practice incident calls
and fire drills every two weeks. We need to get everyone used to solving
problems in a methodical way and to have the timeline available before
we go into that meeting. If we can't do this during a prearranged drill,
how can we expect people to do it during an emergency?"
Seeing the discouraged expression on her face, I put my hand on her
shoulder. "Look, I appreciate all the work you're doing lately. It's
important work, and I don't know what we' d do without you."
Next, I turn to Wes. "Impress upon Brent immediately that during
emergencies, everyone must discuss changes they're thinking about, let
alone the ones they actually implement. I can't prove it, but I'm
guessing Brent caused the outage, and when he realized it, he undid the
change."
Wes is about to respond, but I cut him off.
"Put a stop to this," I say forcefully, pointing at him. "No more
unauthorized changes, and no more undisclosed changes during outages.
Can you get your people under control or not?"
Wes looks surprised and studies my face for a moment. "Yeah, I'm on it,
boss."
------------------------------------------------------------------------
*Wes and I spend nearly every waking hour* late Tuesday and early
Wednesday in the Phoenix war room. The deployment is only three days
away. As each day goes by, the worse it looks.
It's a relief to head back to the Change Coordination Room.
As I walk in, most of the [CAB]{.smallcaps} is here. The messy pile of
index cards is gone. Instead, they're either hanging on one of the
whiteboards on the wall or neatly organized on the table in the front of
the room, labeled "Pending Changes."
"Welcome to our change management meeting," Patty begins. "As you can
see on the board, all of the standard changes have been scheduled.
Today, we'll review and schedule all the high- and medium-risk changes.
We'll then look at the change schedule to make any needed
adjustments---I won't give away anything right now, but I think you'll
see something that requires our attention."
She picks up the first pile of cards. "The first high-risk change is to
a firewall, submitted by John, scheduled for Friday." She then reads out
the people who have been consulted and signed off on the proposed
change.
She prompts Wes and me, "Bill and Wes, do you approve this to go on the
board as a Friday change?"
I'm satisfied that there have been enough eyes on this, so I nod.
Wes says, "Same for me. Hey, not bad. Twenty-three seconds to approve
our first change. We beat our previous best time by fifty-nine minutes!"
There is scattered applause. Patty doesn't disappoint as she goes
through the remaining eight high-risk changes, taking even less time for
those. There is more applause, while one of her staff posts the cards on
the board.
Patty picks up the medium-risk change stack. "There were 147 standard
changes submitted. I want to commend everyone for following the process
and talking with the people that needed to be consulted. Ninety of those
changes are ready to be scheduled, and have been posted. I've printed
them out for everyone to review."
Turning to Wes and me, she says, "I sampled ten percent of these, and,
for the most part, they look good. I'll keep track of problem trends,
just in case some of these need more scrutiny going forward. Unless
there are any objections, I think we're done with the medium-risk
changes. There's actually a more pressing problem that we need to
address."
When Wes says, "No objections from me," I nod for Patty to proceed, who
merely gestures to the boards.
I think I see what's wrong, but I stay quiet. One of the leads points to
one of the boxes and says, "How many changes are scheduled for Friday?"
Bingo.
Patty flashes a small smile and says, "173."
On the board, it's now very obvious that nearly half the changes were
scheduled for Friday. Of the remaining, half are scheduled for Thursday
with the rest sprinkled earlier in the week.
She continues, "I'm not suggesting that 173 changes happening on Friday
is bad, but I'm worried about change collisions and
resource-availability conflicts. Friday is also the day Phoenix is being
deployed.
"If I were air traffic control," she continues, "I'd say that the
airspace is dangerously overcrowded. Anyone willing to change their
flight plans?"
Someone says, "I've got three that I'd like to do today, if no one
minds. I don't want to be anywhere near the airport when Phoenix comes
in for a landing."
"Yeah, well, lucky you," Wes mutters. "Some of us have to be here on
Friday. I can already see the flames pouring out of the wings..."
Two other engineers ask for their changes to be moved earlier in the
week. Patty has them go to the board to move their change cards,
verifying that it wouldn't interfere with other changes already
scheduled.
Fifteen minutes later, the distribution of the cards on the change board
is much more even. I'm less happy that everyone is moving their changes
as far away from Friday as possible, like woodland creatures running
away from a forest fire.
Watching the change cards being moved around, something else starts to
bother me. It's not just the images of carnage and mayhem around
Phoenix. Instead, it has something to do with Erik and the
[MRP]{.smallcaps}-8 plant. I keep staring at the cards.
Patty interrupts my concentration. "---Bill, that concludes what we
needed to get through. All the changes for the week are approved and
scheduled."
As I try to reorient myself, Wes says, "You've done a really great job
organizing this, Patty. You know I was one of your louder critics.
But..." He gestures at the board, "All this is just terrific."
There is a murmur of agreement, and Patty flushes visibly. "Thanks.
We're still in our first week of having a real change process, and this
is the broadest participation we've ever had. But before we start
patting ourselves on the back, how about we make it to a second week,
okay?"
I say, "Absolutely. Thanks for all the time you're putting into this,
Patty. Keep up the great work."
When the meeting adjourns, I stay behind, staring at the change board.
Several times during this meeting, something flickered at the edge of my
mind. Was it something that Erik said that I dismissed earlier?
Something to do with work?
Last Thursday, Wes and Patty did a manual inventory of all our projects,
coming up with nearly a hundred projects. It was manually generated by
interviewing all the line workers. Those projects certainly represent
two categories of work: business projects and internal [IT]{.smallcaps}
projects.
Looking at all the change cards on the wall, I realize that I'm looking
at another collection of work that we once again manually generated.
According to Patty, it's 437 discrete pieces of...work...that we're
doing this week.
I realize that changes are the third category of work.
When Patty's people moved around the change cards, from Friday to
earlier in the week, they were changing our *work schedule*. Each of
those change cards defined the work that my team was going to be doing
that day.
Sure, each of these changes is much smaller than an entire project, but
it's still work. But what is the relationship between changes and
projects? Are they equally important?
And can it really be that before today, none of these changes were being
tracked somewhere, in some sort of system? For that matter, where did
all these changes come from?
If changes are a type of work different than projects, does that mean
that we're actually doing more than just the hundred projects? How many
of these changes are to support one of the hundred projects? If it's not
supporting one of those, should we really be working on it?
If we had exactly the amount of resources to take on all our project
work, does this mean we might not have enough cycles to implement all
these changes?
I debate with myself whether I'm on the verge of some large and
meaningful insight. Erik asked me what my organization's equivalent to
the job release desk on the plant floor. Does change management have
anything to do with it?
Suddenly I laugh out loud at the absurd number of questions I've just
asked myself. I feel like a one-man debate club. Or that Erik tricked me
into doing some philosophical navel-gazing.
Thinking for a moment, I decide there's value in knowing that changes
represent yet another category of work but don't know why.
I've now identified three of the four categories of work. For a brief
moment, I wonder what the fourth category of work is.
[]{#13-ch10.xhtml}
# Chapter 10 {.ch-title}
## • Thursday, September 11 {.dateline}
*The next morning, bright and early,* I'm back in the Phoenix war room.
Kirsten gives us a rundown of the most critical Phoenix project tasks at
the beginning of each day. Because the stakes are so high, committed
tasks are usually reported by the responsible manager as "completed."
No one wants to get on Kirsten's bad side. Or Steve's, for that matter.
The bad news of the day comes from William Mason, Director of Quality
Assurance, who works for Chris. Apparently, they're still finding twice
as many broken features as are getting fixed.
It's never a good sign when pieces are falling off the car as it moves
down the assembly line. No wonder all of us are dreading the deployment
date.
I'm pondering how we can mitigate some of this risk when I hear Kirsten
call Brent's name for the third time. And for the third time, Wes is
having to explain why something didn't get done.
Sarah says from the back of the room, "Wes, once again we're getting
bottlenecked by your people. Are there some personnel issues here that
you need to be addressing?"
Wes turns bright red and is about to respond, when I quickly interject,
"Kirsten, how many other tasks have been assigned to Brent?"
Kirsten quickly replies, "As of today, there are five outstanding tasks.
Three were assigned last Wednesday, and two were assigned last Friday."
"Okay, I'm on it," I say. "As soon as we're done here, I'll look into
what's going on. Expect a status report by noon today along with revised
timelines for completion. I'll let you know if we require anything."
------------------------------------------------------------------------
*On my walk over to Brent's cube in Building 7,* I remind myself that my
goal is to observe and seek to understand. After all, this guy has come
up in conversation every day since I accepted my new role.
Maybe Brent isn't actually as smart as we think. Or perhaps he *is* some
technology Einstein and any attempt to find similarly skilled people
will fail. Or maybe he's deliberately sabotaging our attempts to take
work away from him.
But Brent seems professional and smart, not much different than many
senior engineers I've worked with in the past.
As I approach his desk, I hear him on the phone and typing away on his
keyboard. He's sitting down in front of his four monitors with a headset
on, typing something into a terminal application.
I remain standing outside of his cube, discreetly listening in.
He says, "No, no, no. The database is up and running. Yeah, I know
because it's right in front of me... Yes, I can do queries... Yes...
Yes... No... I'm telling you, it has to be the application server...
It's up? Okay, let me see... Wait, let me try doing a manual sync. Try
it now..."
His cell phone rings. "Wait a second, I've got another call coming in.
I'll call you right back."
He writes something down on a Post-it note, putting it on his monitor
next to two other Post-it notes. Exasperated, he answers his cell phone,
"Yeah, Brent here... The what service is down? Have you tried rebooting
it? Look, I'm really slammed right now with Phoenix---I'll get back to
you later today?"
I'm in the middle of silently congratulating him when I hear him say,
"Uh-huh...I don't even know who that is. The [VP]{.smallcaps} of what?
Okay, let me have a look."
I sigh, taking a seat in an empty cubicle to watch today's episode of A
Day in The Life of Brent.
He's on the phone for another five minutes, hanging up only after some
critical production database is back up and running.
I appreciate how Brent seems to genuinely care that everyone relying on
[IT]{.smallcaps} systems can get their work done, but I'm dismayed that
everyone seems to be using him as their free, personal Geek Squad. At
the expense of Phoenix.
Brent grabs one of the Post-it notes off of his monitor and picks up his
phone. Before he can dial, though, I stand up and say, "Hi, Brent."
"Agh!" he shouts, startled. "How long have you been there?"
"Only for a couple of minutes," I say, putting on my most friendly
smile, grabbing a seat next to him. "Long enough to see you fix two
people's problems. That's admirable, but I just came from Kirsten's
daily Phoenix stand-up. There are five tasks that have been assigned to
you, which are now late."
I show him the five tasks from the project management meeting. He says
quickly, "I'm half-done with all of these already. I just need a couple
of hours of quiet working time to get this done. I'd do this from home
if I could, but the network connection is too slow."
"Who's been calling you, and what do they want?" I ask, frowning.
"Usually it's other [IT]{.smallcaps} people who are having problems
fixing something," he replies, rolling his eyes. "When something goes
down, I'm apparently the only person who knows where to go looking."
"I thought Wes hired a bunch of people to take over some of these
escalations from you." I say.
Brent rolls his eyes again. "That was the idea. But most had other
responsibilities and were never available when we needed them. Others
were let go during the downsizings because they weren't busy enough.
Trust me. That was no big loss. I ended up handling most of those issues
anyway."
"How many calls are you getting each day? Are you logging these calls
anywhere?" I ask.
"You mean, like in our ticketing system? No, because opening up a ticket
for each of those calls would take longer than fixing the problem."
Brent says dismissively. "The number of calls depends on the day. The
last week has been worse than normal."
I get it now. I bet if anyone called right now and yelled loud enough or
name-dropped someone scary enough, Brent could be dragged into fixing
someone else's problem for hours on end.
"You tried to push back on the last person who called. What made you
decide to work the issue, instead of telling them to go pound sand?" I
ask.
He replies, "She told me that the [VP]{.smallcaps} of Logistics was
screaming that replenishment orders weren't getting created, and that if
it didn't get fixed right away, our stores were at risk of stocking out
on fast-moving products. I didn't want to be the person being called out
for single-handedly allowing stock-outs to happen in the stores."
I purse my lips. Company executives strong-arming my engineers into
doing their bidding is total bullshit. But jeopardizing Phoenix is above
their pay grade.
Standing up, I say, "Okay, from here on out, you're working only on
Phoenix. Steve Masters has said that this is everyone's top priority.
Now more than ever, the project needs you. I'm expecting you to reject
any task that anyone tries to assign you."
Brent looks simultaneously relieved and concerned. Maybe he's thinking
about that [VP]{.smallcaps} of Logistics.
I add, "If anyone contacts you about anything besides Phoenix, send them
to Wes. Let him deal with all the jackasses."
He says skeptically, "Look, I appreciate this, but I really don't think
this is going to work in the long run. Our guys around here just don't
seem up-to-speed with how all our systems work. In the end, they keep
coming to me."
"Well, they're going to have to learn. When they call, send them to Wes.
If anyone's got a problem with that, then send them to me. In fact, put
a vacation message on your e-mail, saying that you're not responding to
anything except for Phoenix and to instead contact..."
At my prompting, Brent says with a small smile, "Wes."
"See? You're already getting the hang of it." I smile in return.
I point to his desk phone, "Do whatever it takes to break people of the
habit of going directly to you. You've got my permission to turn off
your phone ringer and change your voicemail greeting to say you're not
available and to contact Wes instead. Whatever it takes."
Realizing that I'm distracting Brent from Phoenix by just standing here,
I say quickly, "No, I'll have my assistant Ellen change your voicemail
greeting for you."
Brent smiles again, and says, "No, no, no. I can do that. Thanks for the
offer, though."
I write my cell phone number on a Post-it note, and hand it to him,
"Ellen will do it. We need you on those Phoenix tasks. Call if you need
anything from me."
When he nods, I start heading back to Building 9, but then turn around
to ask, "Hey, let me buy you a beer sometime next week?"
He agrees, his expression brightening.
As I leave the building, I immediately call Patty. When she picks up, I
say, "Grab Wes and meet me outside the Phoenix war room. We need to
change the way we're managing escalations to Brent. Right now."
------------------------------------------------------------------------
*We all sit down in the conference room* across the hallway from the
Phoenix war room.
"How'd it go with Brent?" Wes asks.
When I tell him that Brent wasn't able to work on Phoenix because of all
the break-fix work, he blanches. "He's been in all these emergency
meetings! How can he possibly think anything is more important than
Phoenix!"
I say, "Good question. Why would Brent drop Phoenix to work on something
else?"
Wes' bluster disappears for a couple of moments. "Probably because
someone like me was screaming at him, saying that I absolutely needed
his help to get my most important task done. And it's probably true: For
way too many things, Brent seems to be the only one who knows how they
actually work."
"If it were me, I'd try to justify it by saying that it would only take
a couple of minutes..." Patty says. "Which could be true, but it's like
death by a thousand cuts."
"Processes are supposed to protect people. We need to figure out how to
protect Brent," I say. I then describe how I already told Brent to send
everyone wanting anything to Wes.
"What? You want me to micromanage all of his time? I don't have time to
be Brent's secretary or be some sort of help desk person!" he shouts.
"Okay, what's on your plate that's more important than making sure your
resources are getting critical Phoenix work done?" I ask.
Wes looks back at me for several moments stonily and then laughs. "Okay,
you got me. Look, Brent is a smart guy. But he's also one of the worst
people I've ever met at writing anything down. Let me tell you a real
story of how impossible this is going to be: Several months ago, we were
three hours into a Sev 1 outage, and we bent over backward not to
escalate to Brent. But eventually, we got to a point where we were just
out of ideas, and we were starting to make things worse. So, we put
Brent on the problem."
He shakes his head, recalling the memory, "He sat down at the keyboard,
and it's like he went into this trance. Ten minutes later, the problem
is fixed. Everyone is happy and relieved that the system came back up.
But then someone asked, 'How did you do it?' And I swear to God, Brent
just looked back at him blankly and said, 'I have no idea. I just did
it.' "
Wes thumps the table and says, "And *that* is the problem with Brent.
How the hell do you document that? 'Close your eyes and go into a
trance'?"
Patty laughs, apparently recalling the story. She says, "I'm not
suggesting Brent is doing this deliberately, but I wonder whether Brent
views all his knowledge as a sort of power. Maybe some part of him is
reluctant to give that up. It does put him in this position where he's
virtually impossible to replace."
"Maybe. Maybe not," I say. "I'll tell you what I do know, though. Every
time that we let Brent fix something that none of us can replicate,
Brent gets a little smarter, and the entire system gets dumber. We've
got to put an end to that.
"Maybe we create a resource pool of level 3 engineers to handle the
escalations, but keep Brent out of that pool. The level 3s would be
responsible for resolving all incidents to closure, and would be the
only people who can get access to Brent---on one condition.
"If they want to talk with Brent, they must first get Wes' or my
approval," I say. "They'd be responsible for documenting what they
learned, and Brent would never be allowed to work on the same problem
twice. I'd review each of the issues weekly, and if I find out that
Brent worked a problem twice, there will be hell to pay. For both the
level 3s and Brent."
I add, "Based on Wes' story, we shouldn't even let Brent touch the
keyboard. He's allowed to tell people what to type and shoulder-surf,
but under no condition will we allow him to do something that we can't
document afterward. Is that clear?"
"That's great," Patty says. "At the end of each incident, we'll have one
more article in our knowledge base of how to fix a hairy problem and a
growing pool of people who can execute the fix."
Wes doesn't look completely convinced, but he eventually laughs. "I like
it, too. We'll treat him like Hannibal Lecter---when we need him, we'll
put him into a straightjacket, tie him to a wheelchair, and cart him
out."
I laugh.
Patty adds, "To prevent another Brent escalation, we should log every
keystroke and record the terminal session. Maybe even have someone
follow him around with a video camera and turn on audit logging so we
know exactly what he changed."
I like it, although it sounds a bit extreme. However, I suspect that it
will take extreme measures to get us out of this situation.
I venture, "Maybe we take away his production access, so the only way
the work can get done is him telling the level 3s what to do."
Wes guffaws. "He might quit if we did that right away."
"So, who do we have that's available to put into this level 3 resource
pool?" I ask.
He hesitates. "Well, we have the two hires we made a year ago that were
meant to help shore up Brent. One is working on creating server build
standards, but we can take her off of that temporarily. There are two
other engineers that we identified for cross-training years ago, but we
never had the time to pursue it further. So, that's three people."
"I'll define the new Brent procedures," Patty says. "I like gating all
access to him through you and Wes. But how will we discourage people
like that [VP]{.smallcaps} of Logistics from going directly to Brent?"
I reply immediately, "We'll collect the names of the people who do, and
I'll call each of their bosses to tell them to cease and desist. And
then I'll let Steve know how they're disrupting Phoenix."
"Okay, let's give it a try," she says. "You know, we've got the 'stick'
approach covered, but what about the 'carrot'? How can we motivate Brent
and the engineers to follow this new process?"
"Maybe we send them to whatever conference or training they want. When
senior engineers get to the level of Brent, or aspire to be Brent, they
want to learn and share what they've done. As for Brent, how about we
make him take a week off, completely free of any escalation duties?" Wes
suggests.
"My God," Wes continues, shaking his head. "I don't think Brent's even
been able to take a day off without a pager in about three years. You
know, he'll burst into tears when we offer that to him."
"Make it so, guys," I say, smiling as I imagine that scene.
Before I forget, I add, "Wes, I want a timesheet from Brent every day,
and I want every escalation Brent works in the ticketing system. We need
that documented so we can analyze it later. Anyone using Brent's time
will need to justify it to me. If it's not justified, I'll escalate it
to Steve, and that person and his manager will have to explain to Steve
why they think their project or task is so important."
"This is amazing," Patty says. "We've gotten more change, incident, and
escalation processes going in the last week than we have in the last
five years!"
"It's probably just in the nick of time," Wes says, sounding relieved.
"Do me a favor, and don't tell anyone I said that. I've got a reputation
to protect."
[]{#14-ch11.xhtml}
# Chapter 11 {.ch-title}
## • Thursday, September 11 {.dateline}
*Later that day during lunch,* I curse loudly. I was trying to use my
precious few unscheduled minutes during my break to get caught up on
e-mails but forgot that my crappy laptop crashes if I turn it on while
it's in the docking station. It's the third time I've done it this week.
I'm already eating late and half my lunch break will be gone by the time
I can log on.
Looking around, I find a blank Post-it note on my desk and write in
large letters, "[DO NOT INSERT LAPTOP UNTIL POWERED ON!!!]{.smallcaps}"
and put it on the docking station to avert my next act of time-wasting
stupidity.
I'm smiling at my countermeasure when Patty calls me on my cell phone.
"You have a minute to talk? I'm seeing something very odd on the change
calendar. You need to see this."
When I walk into the conference room, I see the now familiar change
cards hanging on the wall. The inbox basket is full of cards and more
are neatly stacked in piles on the table. Patty is scrutinizing
something on her laptop, chewing a fingernail.
Looking exhausted, she says, "I'm starting to think this entire change
process is a total waste of time. Organizing all these changes and
managing all the stakeholder communication is taking up three people
full-time. Based on what I'm seeing now, it may be useless."
To see her suddenly disparaging the processes she has championed for
years is genuinely alarming.
"Whoa," I say, waving both my hands in front of her. "Catch me up,
because I think you've done a fantastic job, and I don't want us to go
back to the old ways. What has you so concerned?"
She points to the Monday and Tuesday change boxes. "At the end of each
day, my people start closing out the scheduled changes. We wanted to
make sure that any changes that weren't completed were flagged so they
can be rescheduled and to make sure that our change calendar was
tracking what was happening in reality."
She points to the corner of one card. "We put a check on the change
cards that have been verified as completed and then indicate whether it
caused a service incident or outage. Since last Friday, sixty percent of
the scheduled changes didn't get implemented! Which means we're doing
all this work to authorize and schedule these changes, only to find that
they're not even getting done!"
I can see why Patty is alarmed.
"Why aren't they being completed? And what do you do with the incomplete
change cards?" I ask.
She scratches her head. "I've called a bunch of the change requesters,
and their reasons are all over the board. A couple people said that they
couldn't get all the people they needed to start their change. Someone
else discovered halfway through his change that the storage guys didn't
finish expanding the [SAN]{.smallcaps} like they had promised, so he had
to back out his change, two hours into the procedure."
I groan, thinking about the wasted time and effort. I keep listening as
Patty continues, "Someone else said that she couldn't implement her
change because there was an outage in progress. And a bunch of other
people said, um..."
She looks uncomfortable, so I prompt her to continue. "Well, they said
they needed Brent for a portion of their changes, and he wasn't
available," she says reluctantly. "In some cases, Brent's involvement
was planned. But in other cases, they discovered they needed his help
only after they started implementing and had to abort when Brent wasn't
available."
Before Patty is even finished speaking, I'm seeing red.
"*What?* Brent again? What is going on? Just how has Brent managed to
wedge himself into everyone's path?
"Oh, shit!" I exclaim when it hits me what's happening. "Did we create
this problem by focusing Brent solely on Phoenix? Is this new policy a
mistake?"
She says after a moment, "You know, that's an interesting question. If
you genuinely believe that Brent should only be working on the most
important projects, then I think the new policy is correct, and we
shouldn't change it back.
"I think it's also important to note that until recently, Brent was
helping people implement their changes, without that dependency recorded
anywhere. Or rather, he'd try to. But he'd invariably be too busy to
help everyone, so many of these changes wouldn't have been completed,
even in the old way."
I pick up my phone and speed-dial Wes, telling him to join us.
When he arrives a couple of moments later, he takes a seat and then
looks at my old laptop, saying, "Jeez. You still carrying that thing
around? I'm sure we have a couple of newer eight-year-old laptops that
you could use."
Ignoring his comment, Patty quickly brings him up to speed. His reaction
to her revelation isn't much different than mine.
"You've got to be kidding me!" he says angrily, slapping his palm on his
forehead. "Maybe we should allow Brent to help people make changes?"
I quickly say, "No, that can't be the answer. I suggested that, too. But
Patty pointed out that this would imply that the blocked changes are
more important than Phoenix. Which they aren't."
I think aloud, "Somehow, just like we're breaking the habits of people
asking Brent to help with break-fix work, we need to do the same with
change implementation. We've got to get all this knowledge into the
hands of people actually doing the work. If they can't grok it, then
maybe we have a skills problem in those teams."
When no one says anything, I tentatively add, "How about we take those
same level 3 engineers that are dedicated to protect Brent from
break-fix to help with these change issues?"
Wes quickly responds, "Maybe. But it's not a long-term fix. We need the
people doing the work to know what the hell they're doing, not enable
more people to hoard knowledge."
I listen to Wes and Patty brainstorm ideas to reduce yet another
dependency on Brent when something starts to bother me. Erik called
[WIP]{.smallcaps}, or work in process, the "silent killer," and that
inability to control [WIP]{.smallcaps} on the plant floor was one of the
root causes for chronic due-date problems and quality issues.
We just discovered that sixty percent of our changes didn't complete as
scheduled.
Erik had pointed to the ever-growing mountain of work on the plant floor
as an indication that the plant floor managers had failed to control
their work in process.
I look at the mountain of change cards piled up on today's date on the
calendar, as if a giant snowplow had pushed them all forward. Suddenly,
it's starting to seem like the picture Erik painted on the plant floor
eerily describes the state of my organization.
Can [IT]{.smallcaps} work really be compared to work on a plant floor?
Patty interrupts my deep contemplation as she asks, "What do you think?"
I look back up at her. "For the last couple of days, only forty percent
of the scheduled changes were completed. The rest are being carried
forward. Let's assume that this continues for a bit longer, while we
figure out how to disseminate all the Brent knowledge.
["]{.smallcaps}We have 240 incomplete changes this week. If we have four
hundred new changes coming in next week, we'll have 640 changes on the
schedule next week!
"We're like the Bates Motel of changes," I say in disbelief. "Changes go
in but never come out. Within a month, we'll have thousands of changes
that we'll be carrying around, all competing to get implemented."
Patty nods, "That's *exactly* what's bothering me. We don't have to wait
a month to see thousands of changes---we're already tracking 942
changes. We'll cross over one thousand pending changes sometime next
week. We're running short of space to post and store these change cards.
So why are we going through all this trouble if the changes aren't even
going to get implemented!"
I stare at all the cards, willing them into giving me an answer.
An ever-growing pile of inventory trapped on the plant floor, as high as
the forklifts could stack it.
An ever-growing pile of changes trapped inside of [IT]{.smallcaps}
Operations, with us running out of space to post the change cards.
Work piling up in front of the heat treat oven, because of Mark sitting
at the job release desk releasing work.
Work piling up in front of Brent, because of...
Because of what?
Okay, if Brent is our heat treat oven, then who is our Mark? Who
authorized all this work to be put in the system?
Well, we did. Or rather, the [CAB]{.smallcaps} did.
Crap. Does that mean we did this to ourselves?
But changes need to get done, right? That's why they're changes.
Besides, how do you say no to the onslaught of incoming work?
Looking at the cards piling up, can we afford not to?
But when was the question ever asked whether we should accept the work?
And on what basis did we ever make that decision?
Again, I don't know the answer. But, worse, I have a feeling that Erik
may not be a raving madman. Maybe he's right. Maybe there is some sort
of link between plant floor management and [IT]{.smallcaps} Operations.
Maybe plant floor management and [IT]{.smallcaps} Operations actually
have similar challenges and problems.
I stand up and walk to the change board. I start thinking aloud, "Patty
is alarmed that more than half our changes aren't completing as
scheduled, to the extent that she's wondering whether this whole change
process is worth the time we're investing in it.
"Furthermore," I continue, "she points out that a significant portion of
the changes can't complete because Brent is somehow in the way, which is
partially because we've directed Brent to reject all non-Phoenix work.
We think that reversing this policy is the wrong thing to do."
I take a mental leap, following my intuition. "And I'd bet a million
dollars that this is the exact wrong thing to do. It's because of this
process that, for the first time, we're even aware of how much scheduled
work isn't getting done! Getting rid of the process would just kill our
situational awareness."
Feeling like I'm getting on a roll, I say adamantly, "Patty, we need a
better understanding of what work is going to be heading Brent's way. We
need to know which change cards involve Brent---maybe we even make that
another piece of information required when people submit their cards. Or
use a different color card---you figure it out. You need to inventory
what changes need anything from Brent, and try to satisfy it instead
with the level 3 engineers. Failing that, try to get them prioritized so
we can triage them with Brent."
As I'm talking, I'm more confident that we're heading down the right
path. At this point, we might not be fixing the problem, but at least
we'll be getting some data.
Patty nods, her expression of concern and despair now gone. "You want me
to get my arms around the changes that are heading to Brent, indicating
them on the change cards and maybe even requiring this information on
all new cards. And to get back to you when we know how many changes are
Brent-bound, what the changes are, and so forth, along with a sense of
what the priorities are. Did I get that right?"
I nod and smile.
She types away on her laptop. "Okay, I've got it. I'm not sure what
we'll find out, but it's better than anything I came up with by a long
shot."
I look over at Wes, "You look concerned---anything you want to share?"
"Uh..." Wes says eventually. "There's not much to share, really. Except
that this is a very different way of working than anything I've seen in
[IT]{.smallcaps}. No offense, but did you switch medication recently?"
I smile wanly, "No, but I did have a conversation with a raving madman
on a catwalk overlooking the manufacturing plant floor."
But if Erik was right about [WIP]{.smallcaps} in [IT]{.smallcaps}
Operations, what else was he right about?
[]{#15-ch12.xhtml}
# Chapter 12 {.ch-title}
## • Friday, September 12 {.dateline}
*It's 7:30 p.m. on Friday,* two hours after the Phoenix deployment was
scheduled to start. And things are not going well. I'm starting to
associate the smell of pizza with the futility of a death march.
The entire [IT]{.smallcaps} Operations team was assembled in preparation
for the deployment at 4 p.m. But there was nothing to do because we
hadn't received anything from Chris' team; they were still making last
minute changes.
It's not a good sign when they're still attaching parts to the space
shuttle at liftoff time.
At 4:30 p.m., William had stormed into the Phoenix war room, livid and
disgusted that no one could get all of the Phoenix code to run in the
test environment. Worse, the few parts of Phoenix that were running were
failing critical tests.
William started sending back critical bug reports to the developers,
many of whom had already gone home for the day. Chris had to call them
back in, and William's team had to wait for the developers to send them
new versions.
My team wasn't just sitting around, twiddling our thumbs. Instead, we
were frantically working with William's team to try to get all of
Phoenix to come up in the test environment. Because if they couldn't get
things running in a test environment, we wouldn't have a prayer of being
able to deploy and run it in production.
My gaze shifts from the clock to the conference table. Brent and three
other engineers are huddling with their [QA]{.smallcaps} counterparts.
They've been working frantically since 4 p.m., and they already look
haggard. Many have laptops open to Google searches, and others are
systematically fiddling with settings for the servers, operating
systems, databases, and the Phoenix application, trying to figure out
how to bring everything up, which the developers had assured them was
possible.
One of the developers had actually walked in a couple of minutes ago and
said, "Look, it's running on my laptop. How hard can it be?"
Wes started swearing, while two of our engineers and three of William's
engineers started poring through the developer's laptop, trying to
figure out what made it different from the test environment.
In another area of the room, an engineer is talking heatedly to somebody
on the phone, "Yes, we copied the file that you gave us... Yes, it's
version 1.0.13... What do you mean it's the wrong version... What? When
did you change that?... Copy it now and try again... Okay, look, but I'm
telling you this isn't going to work... I think it's a networking
problem... What do you mean we need to open up a firewall port? Why the
hell didn't you tell us this two hours ago?"
He then slams the phone down hard, and then pounds the table with his
fist, yelling, "Idiots!"
Brent looks up from the developer laptop, rubbing his eyes with fatigue.
"Let me guess. The front-end can't talk to the database server because
someone didn't tell us we need to open a firewall port?"
The engineer nods with exhausted fury, and says, "I cannot freaking
believe this. I was on the phone with that jackass for twenty minutes,
and it never occurred to him that it wasn't a code problem. This is
[FUBAR]{.smallcaps}."
I continue to listen quietly, but I'm nodding in agreement at his
prognosis. In the Marines, we used the term [FUBAR]{.smallcaps}."
Watching tempers fray, I look at my watch: 7:37 p.m.
It's time to get a management gut check from my team. I round up Wes and
Patty and look around for William. I find him staring over the shoulder
of one of his engineers. I ask him to join us.
He looks puzzled for a moment, because we don't normally interact, but
he nods and follows us to my office.
------------------------------------------------------------------------
*"Okay, guys,* tell me what you think of this situation," I ask.
Wes speaks up first, "Those guys are right. This is [FUBAR]{.smallcaps}.
We're still getting incomplete releases from the developers. In the past
two hours, I've already seen two instances when they've forgotten to
give us several critical files, which guaranteed that the code wouldn't
run. And as you've seen, we still don't know how to configure the test
environment so that Phoenix actually comes up cleanly."
He shakes his head again. "Based on what I've seen in the last half
hour, I think we've actually moved backward."
Patty just shakes her head with disgust and waves her hand, adding
nothing.
I say to William, "I know we haven't worked much together, but I'd
really like to know what you think. How's it looking from your
perspective?"
He looks down, exhaling slowly and then says, "I honestly have no idea.
The code is changing so fast that we're having problems keeping up. If I
were a betting man, I'd say Phoenix is going to blow up in production.
I've talked with Chris a couple of times about stopping the release, but
he and Sarah ran right over me."
I ask him, "What do you mean by you 'can't keep up'?"
"When we find problems in our testing, we send it back to Development to
have them fix it," he explains. "Then they'll send back a new release.
The problem is that it takes about a half hour to get everything set up
and running, and then another three hours to execute the smoke test. In
that time, we'll have probably gotten three more releases from
Development."
I smirk at the reference to smoke tests, a term circuit designers use.
The saying goes, "If you turn the circuit board on and no smoke comes
out, it'll probably work."
He shakes his head and says, "We have yet to make it through the smoke
test. I'm concerned that we no longer have sufficient version
control---we've gotten so sloppy about keeping track of version numbers
of the entire release. Each time they fix something, they're usually
breaking something else. So, they're sending single files over instead
of the entire package."
He continues, "It's so chaotic right now that even if by some miracle
Phoenix does pass the smoke test, I'm pretty sure we wouldn't be able to
replicate it, because there are too many moving parts."
Taking off his glasses, he says with finality, "This is probably going
to be an all-nighter for everyone. I think there's genuine risk that we
won't have anything up and running at 8 a.m. tomorrow, when the stores
open. And that's a big problem."
That is a huge understatement. If the release isn't finished by 8 a.m.,
the point of sale systems in the stores used to check out customers
won't work. And that means we won't be able to complete customer
transactions.
Wes is nodding. "William is right. We're definitely going to be here all
night. And performance is worse than even I thought it would be. We're
going to need at least another twenty servers to spread the load, and I
don't know where we can find so many on such short notice. I have some
people scrambling to find any spare hardware. Maybe we'll even have to
cannibalize servers in production."
"Is it too late to stop the deployment?" I ask. "When exactly is the
point of no return?"
"That's a very good question." Wes answers slowly. "I'd have to check
with Brent, but I think we could stop the deployment now with no issues.
But when we start converting the database so it can take orders from
both the in-store [POS]{.smallcaps} systems and Phoenix, we are
committed. At this rate, I don't think that will be for a couple of
hours yet."
I nod. I've heard what I've needed to hear.
"Guys, I'm going to send out an e-mail to Steve, Chris, and Sarah to see
if I can delay the deployment. And then I'm going to find Steve. Maybe I
can get us one more week. But, hell, even getting one more day would be
a win. Any thoughts?"
Wes, Patty, and William all just shake their heads glumly, saying
nothing.
I turn to Patty. "Go work with William to figure out how we can get some
better traffic coordination in the releases. Get over to where the
developers are and play air traffic controller, and make sure everything
is labeled and versioned on their side. And then let Wes and team know
what's coming over. We need better visibility and someone to keep people
following process over there. I want a single entry point for code
drops, controlled hourly releases, documentation... Get my drift?"
She says, "It would be my pleasure. I'll head up to the Phoenix war room
for starters. I'll kick down the door if that's what it takes and say,
'We're here to help...' "
I give them all a nod of thanks and head to my laptop to write my
e-mail.
::: block
From: Bill Palmer
To: Steve Masters
Cc: Chris Anderson, Wes Davis, Patty McKee, Sarah Moulton, William Mason
Date: September 12, 7:45 [PM]{.smallcaps}
Priority: Highest
Subject: [URGENT]{.smallcaps}: Phoenix deployment in major trouble---my
recommendation: 1 week delay
Steve,
First off, let me state that I want Phoenix in production as much as
anyone else. I understand how important it is to the company.
However, based on what I've seen, I believe we will not have Phoenix up
by the tomorrow 8 [AM]{.smallcaps} deadline. There is [SIGNIFICANT
RISK]{.smallcaps} that this may even impact the in-store
[POS]{.smallcaps} systems.
After discussions with William I recommend that we delay the Phoenix
launch by one week to increase the likelihood that Phoenix achieves its
goals and avert what I believe will be a [NEAR-CERTAIN]{.smallcaps}
disaster.
I think we're looking at problems on the scale of the "November 1999
Thanksgiving Toys R Us" train-wreck, meaning multiday outages and
performance problems that potentially put customer and order data at
risk.
Steve, I will be calling you in just a couple of minutes.
Regards,
Bill
:::
------------------------------------------------------------------------
*I take a moment* to collect my thoughts and call Steve, who answers on
the first ring.
"Steve, it's Bill. I just sent out an e-mail to you, Sarah, and Chris. I
cannot overstate how badly this rollout has gone so far. This is going
to bite us in the ass. Even William agrees. My team is now extremely
concerned that the rollout will not complete in time for the stores to
open at 8 a.m. Eastern time tomorrow. That could disrupt the stores'
ability to take sales, as well as probably cause multiday outages to the
website.
"It's not too late to stop this train wreck," I implore. "Failure means
that we'll have problems taking orders from anyone, whether they're in
the stores or on the Internet. Failure could mean jeopardizing and
screwing up order data and customer records, which means losing
customers. Delaying by a week would just mean disappointing customers,
but at least they'll come back!"
Steve breathes into the phone and then replies, "It sounds bad, but at
this point, we don't have a choice. We have to keep going. Marketing
already bought weekend newspaper ads announcing the availability of
Phoenix. They're bought, paid for, and being delivered to homes across
the country. Our partners are all lined up and ready to go."
Flabbergasted, I say, "Steve, just how bad does it have to be for you to
delay this release? I'm telling you that we could be taking a reckless
level of risk in this rollout!"
He pauses for several moments. "Tell you what. If you can convince Sarah
to postpone the rollout, let's talk. Otherwise, keep pushing."
"Are you kidding me? She's the one who's created this kamikaze mess."
Before I can stop myself, I hang up on Steve. For a brief moment, I
consider calling him back to apologize.
As much as I hate to, I feel like I owe the company one last try to stop
this insanity. Which means talking to Sarah in person.
*Back in the Phoenix war room* it's stuffy and rank from too many people
sweating from tension and fear. Sarah is sitting by herself, typing away
on her laptop.
I call out to her, "Sarah, can we talk?"
She gestures to the chair next to her, saying, "Sure. What's up?"
When I say in a lowered voice, "Let's talk in the hallway."
As we walk out together in silence, I ask her, "From up here, how does
it look like the release is going?"
She says noncommittally, "You know how these things go when we're trying
to be nimble, right? There's always unforeseen things when it comes to
technology. If you want to make omelets, you've got to be willing to
break some eggs."
"I think it's a bit worse than your usual rollout. I trust you saw my
e-mail, right?"
She merely says, "Yes, of course. And you saw my reply?"
Shit.
I say, "No. But, before you explain, I wanted to make sure you
understood the implications and the risks we're posing to the business."
And then I repeat almost word for word what I told Steve just minutes
before.
Not surprisingly, Sarah is unimpressed. As soon as I stop talking, she
says, "We've all been busting ass getting Phoenix this far. Marketing is
ready, Development is ready. Everyone is ready but you. I've told you
before, but apparently, you're not listening: Perfection is the enemy of
good. We've got to keep going."
Marveling at this colossal waste of time, I just shake my head and say,
"No, lack of competence is the enemy of good. Mark my words. We're going
to be picking up the pieces for days, if not weeks, because of your dumb
decisions."
As I storm back into the [NOC]{.smallcaps}, I read Sarah's e-mail, which
makes me even more furious. I resist the urge to reply and add fuel to
the fire. I also resist the emotional desire to delete it---I may need
it to cover my ass later.
::: block
From: Sarah Moulton
To: Bill Palmer, Steve Masters
Cc: Chris Anderson, Wes Davis, Patty McKee, William Mason
Date: September 12, 8:15 [PM]{.smallcaps}
Priority: Highest
Subject: Re: [URGENT]{.smallcaps}: Phoenix deployment in major
trouble---my recommendation: 1 week delay
Everyone is ready but you. Marketing, Dev, Project Management all have
given this project their all. Now it's your turn.
[WE MUST GO]{.smallcaps}!
Sarah
:::
*Suddenly, I panic* for a brief moment that I haven't told Paige
anything for hours. I send her a quick text message:
*Night keeps getting worse. Am here for at least a couple more hrs. Will
catch u in am. Love you. Wish me luck, darling.*
I feel a tap on my shoulder and turn around to see Wes. "Boss. We've got
a very serious problem."
The expression on his face is enough to make me scared. I quickly stand
up and follow him to the other side of the room.
"Remember when we hit the point of no return around 9 p.m.? I've been
tracking the progress of the Phoenix database conversion, and it's
thousands of times slower than we thought it would be. It was supposed
to complete hours ago, but it's only ten percent complete. That means
all the data won't be converted until Tuesday. We are totally screwed."
Maybe I'm more tired than I thought but I'm not following him. I say,
"Why is this a problem?"
Wes tries again, "That script needs to complete before the
[POS]{.smallcaps} systems can come up. We can't stop the script and we
can't restart it. Apparently, there's nothing we can do to make it go
faster. I think we can hack Phoenix so that it can run, but I don't know
about the in-store [POS]{.smallcaps} systems---we don't have any to test
with in the lab."
Holy crap.
I think twice before I ask, "Brent?"
He just shakes his head. "I had him look at it for a couple of minutes.
He thinks that someone turned on database indexing too soon, which is
slowing down the inserts. There's nothing we can do about it now,
though, without screwing up data. I put him back on the Phoenix
deployment."
"How is everything else going?" I ask, wanting a full assessment of the
situation. "Any improvement on performance? Any update on the database
maintenance tools?"
"Performance is still terrible," he says. "I think there's a huge memory
leak, and that's even without any users on it. My guys suspect we're
going to have to reboot a bunch of the servers every couple of hours
just to keep it from blowing up. Damned developers..."
He continues, "We've scrounged up fifteen more servers, some of them new
and some yanked from various corners of the company. And now, believe it
or not, we don't have enough space in the data center racks to deploy
them. We have to do a big recabling and racking job, moving crap around.
Patty just put a call out and brought in a whole bunch of her people to
help with that."
I feel my eyebrows hit my hairline in genuine surprise. And then I bend
forward, laughing. I say, "Oh, dear God. We finally find servers to
deploy, and now we can't find space to put them in. Amazing. We just
can't get a break!"
Wes shakes his head. "You know, I've heard stories like this from my
buddies. But this may turn out to be the mother of all deployment
failures."
He continues, "Here's the most amazing part: We made a huge investment
in virtualization, which was supposed to save us from things like this.
But, when Development couldn't fix the performance problems, they blamed
the virtualization. So we had to move everything back onto physical
servers!"
And to think that Chris proposed this aggressive rollout date because
virtualization would save our asses.
I wipe my eyes and force myself to stop laughing. "And how about the
database support tools the developers promised us?"
Wes immediately stops smiling. "Absolute garbage. Our guys are going to
have to manually edit the database to correct all the errors Phoenix is
generating. And we're going to have to manually trigger replenishments.
We're still learning about how much of this type of manual work Phoenix
is going to require. It's going to be very error-prone and take a ton of
people to do."
I wince, thinking about how this will tie up even more of our guys,
doing menial work that the broken application should be doing. Nothing
worries auditors more than direct edits of data without audit trails and
proper controls.
"You're doing a great job here. Our top priority is finding out what the
effect of the incomplete database conversion will be on the in-store
[POS]{.smallcaps} system. Find someone who knows those things inside and
out, and get their thoughts. If necessary, call someone on Sarah's team
who handles day-to-day retail operations. Bonus points if you can get
your hands on a [POS]{.smallcaps} device and server we can log into to
see what the impact is ourselves."
"Got it," Wes says, nodding. "I know just the person to put on this."
I watch him head off and then look around, trying to figure out where I
can be the most useful.
------------------------------------------------------------------------
*The morning light is starting* to stream in from the windows, showing
the accumulated mess of coffee cups, papers, and all sorts of other
debris. In the corner, a developer is asleep under some chairs.
I had just run to the bathroom to wash my face and wipe the grime from
my teeth. I feel a little fresher, but it's been years since I've pulled
an all-nighter.
Maggie Lee is the Senior Director of Retail Program Management and works
for Sarah. She is kicking off the 7 a.m. emergency meeting, and there
are nearly thirty people packed into the room. In a tired voice, she
says, "It's been a night of heroics, and I appreciate everyone doing
what it takes to hit our Phoenix commitments.
"As you know, the reason for this emergency meeting is that something
went wrong in the database conversion," she continues. "That means all
the in-store [POS]{.smallcaps} systems will be down, which means that
the stores will not have working cash registers. That means manual tills
and manual card swipes."
She adds, "The good news is that the Phoenix website is up and running."
She gestures at me and says, "My thanks to Bill and the entire
[IT]{.smallcaps} Operations crew for making this happen."
Irritated, I say, "I'd far rather have those [POS]{.smallcaps} systems
up instead of Phoenix. All hell is breaking loose in the
[NOC]{.smallcaps}. All our phones have been lit up for the past hour,
because people in the stores are all screaming that their systems aren't
responding. It's like the Jerry Lewis Telethon down there. Like all of
you, my voicemail has already filled up from the staff in our 120
stores. We're going to need to pull in more people just to man the
phones."
A phone vibrates somewhere on the table, as if to punctuate my point.
"We need to get proactive here," I say to Sarah. "We need to send out a
summary to everyone in the stores, as quickly as possible outlining
what's happened and more specific instructions on how to conduct
operations without the [POS]{.smallcaps} systems."
Sarah momentarily looks blank, and then says, "That's a good idea. How
about you take a first cut at the e-mail, and we'll take it from there?"
Dumbfounded, I say, "What? I'm not a store manager! How about your group
takes the first cut, and Chris and I can make sure it's accurate."
Chris nods.
Sarah looks around the room. "Okay. We'll get something together in the
next couple of hours."
"Are you kidding me?" I shout. "Stores on the East Coast start opening
in less than an hour---we need to get something out there now!"
"I'll take care of it," says Maggie, raising her hand. She immediately
opens up her laptop and starts typing.
As I squeeze my head between my hands to see if I can make my headache
hurt less, I wonder how much worse this rollout could get.
------------------------------------------------------------------------
*By 2 p.m. Saturday,* it's pretty clear that the bottom is a lot further
down than I thought possible.
All stores are now operating in total manual fallback mode. All sales
are being processed by those manual credit card imprint machines, with
the carbon paper imprints being stored in shoeboxes.
Store managers have had employees running to the local office supply
stores to find more carbon paper slips for the card imprint machines, as
well as to the bank, so they could give out correct change.
Customers using the Phoenix website are complaining about how it is
either down or so slow as to be unusable. We have even managed to turn
into a Twitter trending topic. All of our customers who had been excited
to try our service started complaining about our big [IT]{.smallcaps}
fail after seeing our [TV]{.smallcaps} and newspaper ads.
Those customers who were able to order online had a rude awakening when
they went to the store to pick up their order. That's when we discovered
that Phoenix seemed to be randomly losing transactions, and in other
cases, it was double- or triple-charging our customers' credit cards.
Furious that we've potentially lost integrity of the sales order data,
Ann from Finance drove in and her team has now set up *another* war room
across the hallway, fielding calls from the stores to handle problem
orders. By noon, there were piles of papers from hundreds of pissed off
customers that were being faxed in from the stores.
To support Ann, Wes brought in even more engineers to create some tools
for Ann's staff to use, in order to process the ever-growing backlog of
screwed up transactions.
As I walk past the [NOC]{.smallcaps} table for the third time, I decide
that I'm too exhausted to be of use to anyone. It's almost 2:30 p.m.
Wes is arguing with someone across the room, so I wait until he's done.
I say to him, "Let's face up to the fact that this is going to be a
multiday ordeal. How are you holding up?"
He yawns and replies, "I managed to get an hour of sleep. Wow, you look
terrible. Go home and get a couple of hours yourself. I've got a handle
on everything here. I'll call you if anything comes up."
Too tired to argue, I thank him and leave.
------------------------------------------------------------------------
*I wake with a start* when I hear my cell phone ring. I bolt up and grab
my phone. It's 4:30 p.m. Wes is calling.
I shake my head to gain some semblance of alertness and then answer,
"What's up?"
I hear him say, "Bad news. In short, it's all over Twitter that the
Phoenix website is leaking customer credit card numbers. They're even
posting screenshots. Apparently, when you empty your shopping cart, the
session crashes and displays the credit card number of the last
successful order."
I've already jumped out of bed and am heading to the bathroom to get
showered. "Call John. He's going to have kittens. There's probably some
protocol for this, involving tons of paperwork and maybe even law
enforcement. And probably lawyers, too."
Wes replies, "I already called him. He and his team are on the way in.
And he is pissed. He sounded just like that dude from *Pulp Fiction*. He
even quoted the line about the day of reckoning and striking people down
with great vengeance and furious anger."
I laugh. I love that scene with John Travolta and Samuel L. Jackson.
It's not how I would have typecast our mild-mannered [CISO]{.smallcaps},
but as they say, you always have to watch out for the quiet ones.
I take a quick shower. I run into the kitchen and grab a couple of
sticks of the string cheese our son loves to eat. I take these with me
in the car and start my drive back into the office.
When I get on the highway, I call Paige. She answers on the first ring,
"Darling, where have you been? I'm at work and the kids are with my
mom."
I say, "I was actually at home for an hour. I fell asleep the instant I
crawled into bed, but Wes just called. Apparently, the Phoenix
application started showing the entire world people's credit card
numbers. It's a huge security breach, so I'm driving back in right now."
I hear her sigh disapprovingly. "You've been there for over ten years
and you've never worked these kind of hours. I'm really not sure I like
this promotion."
"You and me both, honey..." I say.
[]{#16-ch13.xhtml}
# Chapter 13 {.ch-title}
## • Monday, September 15 {.dateline}
*By Monday, the Phoenix crisis is a public fiasco.* We made it onto the
front-page news of all the technology sites. There are rumors that
someone from *The Wall Street Journal* was trying to get Steve for an
on-the-record interview.
I start with a jolt when I think I hear Steve mention my name.
Completely disoriented, I look around and realize that I'm at work and
that I must have fallen asleep while waiting for the Phoenix status
meeting to start. I sneak a peek at my watch. 11:04 a.m.
I have to look at my phone to figure out that it's Monday.
For a moment, I wonder where my Sunday went, but seeing Steve red-faced,
and addressing the entire room makes me pay attention.
"---don't care one bit whose fault this is. You can bet your ass that
this won't ever happen again on my watch. But right now, I don't give
two shits about the future---we are massively screwing our customers and
shareholders. All I want to hear about is how we're going to dig
ourselves out of this hole and restore normal business operations."
He turns and points at Sarah saying, "And you are not off the hook until
every one of your store managers says that they can transact normally.
Manual card swipes? What are we, in some Third World country?"
Sarah replies calmly, "I totally understand how unacceptable this is.
I'm making sure my entire staff knows that they are accountable and
responsible."
"No," Steve responds quickly and gravely. "You are ultimately
accountable and responsible. Do not forget that."
My heart actually lightens for a moment, as I wonder whether Steve has
broken free of Sarah's spell.
Turning his attention back to the entire room he says gravely, "When the
store managers say that we're no longer operating on life support, I
need fifteen minutes from each and every person who had a hand in this.
I expect you to clear your calendar. No excuses.
"That means you, Sarah, Chris, Bill, Kirsten, Ann. And even you, John,"
he says, pointing at people as he names them.
Way to go, John. You picked a great time to finally get noticed by
Steve.
He continues, "I'll be back in two hours after I get on a phone call
with another journalist because of this mess!"
His door slam shakes the walls.
Sarah breaks the silence. "Well, you all heard Steve. Not only do we
need to get the [POS]{.smallcaps} systems up, but we must also get the
Phoenix usability issues fixed. The press is having a heyday with the
clunkiness of the ordering interface and everything timing out."
"Are you out of your mind?" I say, leaning forward. "We are keeping
Phoenix alive by sheer heroics. Wes wasn't joking when he said that
we're proactively rebooting all the front-end servers every hour. We
can't introduce any more instabilities. I propose code rollouts only
twice a day and restricting all code changes to those affecting
performance."
To my surprise, Chris immediately chimes in, "I agree. William, what do
you think?"
William nods. "Absolutely. I suggest we announce to the developers that
all code commits must have a defect number that corresponds to a
performance problem. Anything that doesn't will get rejected."
Chris says, "That good enough for you, Bill?"
Pleased with the solution, I say, "Perfect."
Although Wes and Patty seem simultaneously pleased and taken aback by
this sudden cooperation from Development, Sarah is not pleased. She
says, "I don't agree. We've got to be able to respond to the market, and
the market is telling us that Phoenix is too hard to use. We can't
afford to screw this up."
Chris replies, "Look, the time for usability testing and validation was
months ago. If we didn't get it right the first time, we're not going to
get it right without some real work. Have your product managers work on
their revised mockups and proposals. We'll try to get it in as soon as
we can after the crisis is over."
I affirm his position, saying, "I agree."
"You raise some good points. I approve," she says, apparently realizing
that she wasn't going to win this argument.
I'm not sure Sarah is actually in a position to approve anything. But,
luckily, the discussion turns quickly to how to regain [POS]{.smallcaps}
functionality.
I revise my opinion of Chris upward a couple of notches. I still think
he was a willing accomplice of Sarah's, but maybe I'll give him the
benefit of the doubt.
------------------------------------------------------------------------
*Leaving the Phoenix war room,* I see the room across the hallway where
Ann and her team handle problem orders. I'm overcome by a sudden
curiosity, genuinely wanting to see how they're doing.
I knock and walk in, still chewing a stale bagel from the meeting. Since
Saturday, there has been an endless supply of pizzas, pastries, Jolt
colas, and coffee to keep all the troops at their tasks.
Before me is a scene of frenetic activity: There are tables covered with
piles of incoming faxes from the stores and twelve people walk from one
to the next. Each fax is a problem order waiting to be routed to an army
of finance and customer service representatives who have been
press-ganged into service. Their job was to either deduplicate or
reverse every one of these transactions.
In front of me, four finance people are sitting at another table, their
fingers flying across ten-key calculators and open laptops. They're
manually tabulating the orders, trying to calculate the scale of the
disaster and doing reconciliations to catch any mistakes.
On the wall, they're keeping track of the totals. So far, five thousand
customers have had either duplicate payments or missing orders, and
there are an estimated twenty-five thousand more transactions that still
need to be investigated.
I shake my head in disbelief. Steve is right. We massively screwed the
customers this time. It's downright embarrassing.
On the other hand, I have to respect the operation the Finance people
have put in place to handle the mess. It looks organized, with people
doing what needs to get done.
A voice next to me says, "Another Phoenix trainwreck, huh?"
It's John, taking in the scene like me. He's not saying "I told you so,"
but almost. With him, of course, is his ever-present black three-ring
binder.
John smacks his face with his palm. "If this were happening to our
competitor, I'd be laughing my ass off. I told Chris over and over about
this possibility, but he wouldn't listen. We're paying for it now."
He walks up to one of the tables and starts looking over people's
shoulders. I see his body suddenly tense as he picks a pile of papers
up. He flips through the papers, his face ashen.
He returns to where I'm standing, and whispers, "Bill, we've got a major
problem. Outside. Now."
"Look at this order slip," he hisses as we stand outside. "Do you see
the problem here?"
I look at the page. It's a scanned order slip, slanted and
low-resolution. It's for a purchase of various auto parts, and the
dollar amount seems reasonable at \$53.
I say, "Why don't you just tell me?"
John points to a handwritten number scrawled by the scanned credit card
and customer signature. "That three-digit number is the
[CVV]{.smallcaps}2 code on the back of the credit card. That's there to
prevent credit card fraud. Under the Payment Card Industry rules, we are
not allowed to store or transmit anything on track 2 of the magnetic
card stripe. Even possessing this is an automatic cardholder data breach
and an automatic fine. Maybe even front-page news."
Oh, no. Not again.
He continues, as if reading my mind, "Yeah, but worse this time. Instead
of just being on the local news, imagine Steve being splashed on the
front page of every market where we have customers and stores. And then
flying to [DC]{.smallcaps} to be grilled by senators, on behalf of all
their outraged constituents."
He continues, "This is really serious. Bill, we've got to destroy all of
this information immediately."
I shake my head, saying, "No way. We've got to process every one of
those orders, so that we don't charge or even double-charge our
customers. We're obligated to do this, otherwise we're taking money from
them that we'll eventually need to return."
John puts his hand on my shoulder, "That may seem important, but that's
only the tip of the iceberg. We're already in deep shit because Phoenix
leaked cardholder data. This may be just as bad. We get fined according
to the number of cardholders affected."
He gestures at all the papers, saying, "This could more than double our
fines. And you think our audits are bad now? This will make them ten
times more painful, because they'll classify us as a Level 1 merchant
for the rest of eternity. They may even raise our transaction fees from
three percent to---who knows how high? That could halve our retail store
profit margins and---"
He stops mid-sentence and opens up his three-ring binder to a calendar.
"Oh, shit! The [PCI]{.smallcaps} auditors are on-site *today* doing a
business process walk-through. They're on the second floor, interviewing
the order administration staff about our operations. They're even
supposed to use this conference room!"
"You've got to be kidding me," I say as the feeling of panic starts to
set in, which amazes me considering that it's been three days of
constant adrenaline.
I turn to look through the window of the conference door and see very
clearly all the finance people handling all the customer problem orders.
Shit.
"Look," I say, "I know that sometimes people think you're not on our
side, but I really need your help. You've got to keep the auditors off
this floor. Maybe even out of this building. I'll put up some curtains
on the windows, or maybe even barricade the door."
John looks at me and then nods. "Okay, I'll handle the auditors. But I
still don't think you fully understand. As the custodians of cardholder
data, we cannot allow hundreds of people to have access to it. The risk
of theft and fraud is too high. We've got to destroy the data
immediately."
I can't help but laugh for a moment at the endless stream of problems.
Forcing myself to focus, I say slowly, "Okay, I'll make sure the Finance
people understand this and handle it. Maybe we can get them all scanned
and shipped to an offshore firm for them to enter."
"No, no, no. That's even worse!" he says. "Remember, we're not allowed
to transmit it, let alone send it to a third party. Understand? Look,
just so we can claim plausible deniability, I'm going to pretend I
didn't hear that just now. You've got to figure out how to destroy all
this prohibited data!"
I get pissed off at John's mention of plausible deniability, regardless
of whether it was well intentioned or not. I take a deep breath and say
to him, "Keep those auditors off this floor, and I'll worry about the
card imprints. Okay?"
He nods and says, "Roger. I'll call you when I park the auditors
somewhere safe."
As I watch him walk quickly down the hallway to the stairway, I keep
thinking to myself, "He's only doing his job. He's only doing his job."
I swear under my breath and turn back around to look back at the
conference room. And now I see the big printed sign hanging on the door,
proclaiming "Phoenix [POS]{.smallcaps} Recovery War Room."
Suddenly, I feel like I'm in the movie *Weekend at Bernie's*, where some
teenage boys keep trying to hide or disguise a dead body from a hit man.
Then I wonder if this is more like the massive around-the-clock
shredding operation that allegedly happened at the offices of Arthur
Andersen, the audit firm investigated after Enron failed. Am I complicit
in destroying important evidence?
What a mess. I shake my head, and walk back into the conference room to
deliver the bad news.
------------------------------------------------------------------------
*I finally get back down* to the [NOC]{.smallcaps} at 2:30 p.m., and
survey the carnage as I make my way to my office. Seven extra tables
have been set up to make more meeting spaces, and there are people
assembled around each of them. Empty pizza boxes are piled up on many of
the tables and in one corner of the room.
I take a seat behind my desk, sighing in relief. I spent almost an hour
with Ann's team on the cardholder data issue, and then another half hour
arguing with them that this is really their problem, not mine. I told
them that I could help, but that my team was too tied up trying to keep
Phoenix running to take any more responsibility.
I realize with some amazement that this may have been the first time
I've been able to say no to anyone in the company since I started in
this role. I wonder if I could have done it if we weren't the people
almost single-handedly keeping our store order entry systems up.
As I ponder this, my phone rings. It's John. I answer quickly, wanting
an update on the auditor issue. "Hey, John. How's it going?"
John replies, "Not terrible. I've got the auditors set up right next to
me, here in Building 7. I've rearranged it so that all the interviews
will be done here. They won't go anywhere near the Phoenix war room, and
I've told the Building 9 security people explicitly not to let them past
the front desk."
I chuckle at seeing John bend all the rules. "That's great. Thanks for
pulling all that together. Also, I think Ann could use your help
figuring what exactly it takes to stay in compliance with the cardholder
data regulations. I helped as best I could, but..."
John says, "No problem. I'm happy to assist."
He hesitates for a couple of moments. "I hate to bring it up now, but
you were supposed to give internal audit the [SOX]{.smallcaps}-404
response letter today. How is that coming along?"
I burst out in laughter. "John, our plan was to get that report done
over the weekend after the Phoenix deployment. But, as you know, things
didn't quite go as planned. I doubt anyone has worked on it since
Friday."
In a very concerned voice, John says, "You know that the entire audit
committee looks at this, right? If we blow this deadline, it's like a
red flag to everyone that we have severe control issues. This could
drive up the length of the external audit, too."
I say as reasonably as I can, "Trust me, if there was anything I could
do, I would. But right now, my entire team has been working
around-the-clock to support the Phoenix recovery efforts. Even if they
completed the report, and all I had to do was bend over and pick it up,
I couldn't. We're that far underwater."
As I'm talking, I realize how liberating it is to state that my team is
absolutely at capacity and that there aren't any calories left over for
any new tasks, and people actually believe me.
I hear John say, "You know, I could free two engineers up. Maybe they
could help do some of the legwork around estimating the remediation
effort? Or if you need it, we could even put them into the technical
resource pool to help with recovery. They're both very technical and
experienced."
My ears perk up. We've got everyone deployed doing all sorts of things
that this emergency requires and most have pulled at least one
all-nighter. Some are monitoring fragile services and systems, others
are helping field phone calls from the store managers, others are
helping [QA]{.smallcaps} build systems and write tests, some are helping
Development reproduce problems.
I say immediately, "That would be incredibly helpful. Send Wes an e-mail
with a couple of bullet points on each of your engineers. If he doesn't
have an urgent need for their skills, I'll task them on generating the
remediation estimates, as long as it doesn't require interrupting anyone
working Phoenix."
"Okay, great," John says. "I'll send the info to Wes later today, and
I'll let you know what he and I decide to do."
He signs off, and I consider the potential stroke of good fortune that
someone could be working on the audit response.
I then wonder if the fatigue is getting to me. Something is really
screwy in the world when I'm finding reasons to thank Development *and*
Security in the same day.
[]{#17-ch14.xhtml}
# Chapter 14 {.ch-title}
## • Tuesday, September 16 {.dateline}
*By late Monday night,* we had stabilized the situation. Working with
Chris' team, the stores finally had working cash registers again, but
everyone knows it's only a temporary fix. At least we don't need to keep
sensitive cardholder data anymore, much to John's relief.
It's 10:37 a.m., and I'm standing outside of Steve's office with Chris.
He's leaning against the wall, looking pensively at the floor. Ann,
John, and Kirsten are also here, waiting for their turn, like penitent
students waiting outside the principal's office in elementary school.
The door to Steve's office opens and Sarah walks out. She looks ashen
faced and on the verge of tears. She was the first to go in, and her
session didn't even take the whole ten minutes.
She closes the door behind her, blows out her breath, and says to Chris
and me, "You're next."
"Here goes nothing...," I say, opening the door.
Steve stands by the window, looking out over the corporate campus. "Take
a seat, gentlemen."
When we're sitting down, Steve starts to pace in front of us. "I've
talked with Sarah. As the project leader, I'm holding her responsible
for the success or failure of Phoenix. I have no idea if I have a
leadership problem or if she just has the wrong people on the bus."
My jaw drops. Did Sarah somehow manage to weasel her way out of her part
in this disaster? This whole thing is her fault!
Steve turns to Chris. "We put over \$20 million into this project, and
the lion's share went to your team. From where I'm standing, we' d be
better off if we had nothing to show for it. Instead, I have half my
company scrambling to pick up the wreckage from the damage you caused."
Turning back to both of us, he continues, "In the good years, we were a
five percent net margin company. That meant to make \$1 million, we had
to sell \$20 million in products. Who knows how many sales we lost over
the weekend and how many loyal customers we've lost forever."
He starts pacing again. "We've done a terrible disservice to our
customers. They're the people who need to fix their cars to get to work.
They're fathers working on projects with their kids. We've also screwed
some of our best suppliers and clients.
"To appease the people who actually used Phoenix, Marketing is now
giving away \$100 vouchers, which could cost us millions of dollars.
Come on! We're supposed to take money from customers, not the other way
around!"
As a former sergeant, I know there's a time and place for dressing
someone down. But this is too much. "No offense, sir, but this is
supposed to be news to me? I called you, explaining what would happen,
asking you to delay the launch. You not only blew me off, you told me to
try to convince Sarah. Where's your responsibility in all of this? Or
have you outsourced all your thinking to her?"
As I'm talking, I realize I may be making a big mistake by saying what I
really think. Maybe it's from weeks of crisis-fueled adrenaline, but it
feels good rattling Steve's cage. Really good.
Steve stops pacing, pointing his finger at my forehead. "I know more
about responsibility than you may learn in your entire lifetime. I'm
tired of your Chicken Little routine, screaming that the sky is falling
and then happily saying 'I told you so' afterward. I need you to come to
me with some actual solutions."
Leaning into him, I say, "I told you *exactly* what was going to happen
when your sidekick Sarah brought up this crazy plan almost two weeks
ago. I proposed to you a timeline that would have prevented all this
from happening. You tell me that I could have done better? I'm all
ears." With exaggerated respect, I add, "*Sir*."
"I'll tell you what I need from you," he replies calmly. "I need the
business to tell me it's no longer being held hostage by you
[IT]{.smallcaps} guys. This has been the running complaint the entire
time I've been [CEO]{.smallcaps}. [IT]{.smallcaps} is in the way of
every major initiative. Meanwhile, our competitors pull away from us,
leaving us in the dust. Dammit, we can't even take a crap without
[IT]{.smallcaps} being in the way."
He takes a deep breath. "None of this is why you're here today. I called
you in to tell you two things. First, thanks to this latest
[IT]{.smallcaps} screwup, the board has insisted that we investigate
splitting up the company. They think the company is worth more sold off
in pieces. I'm against this, but they've already got consultants in our
panties investigating its feasibility. There's nothing I can do about
that.
"Second, I'm done playing Russian roulette with [IT]{.smallcaps}.
Phoenix just shows me that [IT]{.smallcaps} is a competency that we may
not be able to develop here. Maybe it's not in our [DNA]{.smallcaps}.
I've given Dick the green light to investigate outsourcing all of
[IT]{.smallcaps} and asked him to select a vendor in ninety days."
Outsourcing all of [IT]{.smallcaps}. Holy shit.
That means everyone in my entire department may not have jobs anymore.
That means that I may not have a job anymore.
In a sudden and sobering instant, I realize that the feeling of elation
and confidence I felt rattling Steve's cage was only an illusion. He has
all the power. With a wave of his pen, he could outsource all of us to
the lowest-cost bidder from some random corner of the planet.
I glance over at Chris, and he looks as shaken as I feel.
Steve continues, "I expect you'll give Dick all the help he requires. If
you can pull off some sort of miracle during the next ninety days, we'll
consider keeping [IT]{.smallcaps} in-house."
"Thank you, gentlemen. Please send in Kirsten," he says with finality.
------------------------------------------------------------------------
*"Sorry I'm late," I say,* slumping down in the booth across from Chris.
Shell-shocked after our meeting with Steve, he and I decided to meet for
lunch. In front of him is some sort of fruity drink with an umbrella. I
always figured him to be a blue-collar drinker---more like Pabst Blue
Ribbon, not some bachelorette party mixed drink.
He laughs humorlessly. "Trust me. You showing up ten minutes late is the
least of my problems. Get yourself a drink."
Paige tells me repeatedly that I shouldn't trust this guy. She has a
great instinct for people, but when it comes to me, she's embarrassingly
protective, which makes me laugh. I'm the ex-Marine, after all. She's
just a "nice nurse."
"Any pilsner you have on tap, please," I say to the waitress. "And a
scotch and water, too. It's been a rough day."
"That's what I heard. No problem at all, sweetie," she replies,
laughing. To Chris, she asks, "Another mai tai for you?"
He nods, handing her his empty glass. So that's what a mai tai looks
like. I've never tried one. We Marines are very self-conscious about
what we're seen drinking.
Chris raises his water glass and says, "To having a common death
sentence."
I smile wanly and raise my glass. Feeling obligated to inject some
optimism, I say, "And here's to figuring out how we get a stay of
execution from the governor."
We clink glasses.
"You know, I've been thinking," Chris says. "Maybe my group being
outsourced wouldn't be the worst thing in the world. I've been in
software development for virtually my entire career. I'm used to
everyone demanding miracles, expecting the impossible, people changing
requirements at the last minute, but, after living through this latest
nightmare project, I wonder if it might be time for a change..."
I can't believe it. Chris has always been confident, even arrogant,
seeming to really love doing what he does. "What kind of change? You
thinking about opening a mai tai bar in Florida or something like that?"
Chris shrugs. When he looks down, I can see the huge bags underneath his
eyes and the fatigue in his face. "I used to love this work, but it's
gotten so much more difficult over the last ten years. Technology keeps
changing faster and faster, and it's nearly impossible to keep up
anymore."
The waitress comes back with our drinks. Part of me feels guilty about
drinking during lunch on company time, but I figure I've earned it,
having given enough of my personal time to the company over the last two
weeks. Chris takes a long swig, and so do I.
He continues, "It's crazy what programmers, and even managers like me,
have to learn every couple of years. Sometimes it's a totally new
database technology, a new programming or project management method, or
a new technology delivery model, like cloud computing.
"Just how many times can you throw out everything you know to keep up
with the latest new-fangled trend? I look in the mirror every once in
awhile, asking myself, 'Will this be the year that I give up? Will I
spend the rest of my career doing [COBOL]{.smallcaps} maintenance or
become just another has-been middle manager?' "
I laugh sympathetically. I chose to be in the technology backwaters. I
was happy there. That is, until Steve threw me back into the big,
shark-infested pool.
Shaking his head, he continues, "It's harder than ever to convince the
business to do the right thing. They're like kids in a candy store. They
read in an airline magazine that they can manage their whole supply
chain in the cloud for \$499 per year, and suddenly that's the main
company initiative. When we tell them it's not actually that easy, and
show them what it takes to do it right, they disappear. Where did they
go? They're talking to their Cousin Vinnie or some outsourcing sales guy
who promises they can do it in a tenth of the time and cost."
I laugh. "A couple of years ago, someone in Marketing asked my group to
support a database reporting tool that one of their summer interns
wrote. It was actually pretty brilliant, given that she only had a
couple of months to work on it, and then it started being used in daily
operations. How in the hell do you support and secure something that's
written in Microsoft Access? When the auditors found out that we
couldn't secure access to all the data, we spent weeks cobbling together
something that satisfied them.
"It's like the free puppy," I continue. "It's not the upfront capital
that kills you, it's the operations and maintenance on the back end."
Chris cracks up. "Yes, exactly! They'll say, 'The puppy can't quite do
everything we need. Can you train it to fly airplanes? It's just a
simple matter of coding, right?' "
After we order food, I tell him about how reluctant I was to accept my
new role and my inability to get my arms around all the work that my
group has committed to.
"Interesting," Chris says. "You know, we're struggling, too. We've never
had so many problems hitting our ship dates. My engineers keep getting
pulled off of feature development to handle escalations when things
break. And deployments keep taking longer and longer. What used to take
ten minutes to deploy starts taking an hour. Then a full day, then an
entire weekend, then four days. I've even got some deployments that are
now taking over a week to complete. Like Phoenix."
He continues, "What use is it having all these offshore developers
building features if we aren't getting to market any faster? We keep
lengthening the deployment intervals, so that we can get more features
deployed in each batch."
He laughs. "I was in a meeting last week where the feature backlog was
so long, the product managers were arguing about which features will get
worked on three years from now! We can't even plan effectively for one
year, let alone three years! What's the use?"
I listen intently. What's happening with Phoenix is a combination of the
need to deliver needed features to market, forcing us to take shortcuts,
which are causing ever-worsening deployments. He's put his finger on a
very important downward spiral we need to break out of.
"Listen, Bill, I know it's a little late to say this, but better late
than never. I'm really sorry about my part in this Phoenix fiasco. Sarah
came to me a week before Kirsten's project management meeting, asking me
all sorts of questions. She asked when would be the soonest that we
could be code-complete. I had no idea she was going to interpret that as
the go-live date, especially with Steve in the room. William predicted
that it was going to be a disaster, and I should have listened to him,
too. That was bad judgment on my part."
I look into his eyes for a couple of moments. I finally decide to
believe him. I nod and say, "Thanks. Don't worry about it."
I add, "But don't do it again. If you do, I'll break both of your legs,
and then I'll have Wes attend every one of your staff meetings. I'm not
sure which is more motivating."
Chris smiles, raising his glass. "Here's to never letting this happen
again, eh?"
A good thought. I smile and clink my glass against his.
I finish my second beer. "I'm really worried that Sarah is going to try
to blame this whole thing on us, you know?"
Chris looks up from his glass and says, "She's like Teflon. Nothing
sticks to her. We've got to stick together. I've got your back, and I'll
give you a heads-up if I see her trying some weird political crap
again."
"Likewise," I say emphatically.
I look at my watch. It's 1:20 p.m. It's time to head back, so I signal
our waitress for the check. "This has been great. We need to do this
more often. How about we meet once a week and figure out what we need to
do to head off this boneheaded idea to outsource all of
[IT]{.smallcaps}?"
"Absolutely," he says. "I don't know about you, but I'm not going to
roll over on this. I'm going down swinging."
With that, we shake hands.
------------------------------------------------------------------------
*Even after eating some food,* I feel buzzed. I wonder where I can find
some breath mints so I won't smell like I spent the morning in a
distillery.
I look at my schedule on my phone, and move all my meetings to later in
the week. At 4 p.m., I'm still in my office when I get an e-mail from
Chris.
::: block
From: Chris Allers
To: Bill Palmer
Date: September 16, 4:07 [PM]{.smallcaps}
Subject: Throwing a little post-Phoenix party
Hey, Bill...
It was good meeting for lunch---I had a great time.
We're throwing a little impromptu party to celebrate the completion of
Phoenix. It's nothing elaborate, but I've ordered a beer keg, some wine
and food, and we're congregating right now in the Bldg 7 lunchroom.
We'd love to have your folks join us. In my mind, it was one of the best
team efforts I've seen in this company. I ordered enough booze for
everyone on your team, too. :-)
See you there,
Chris
:::
I genuinely appreciate Chris' gesture, and I think my team will, too.
Especially Wes. I forward the e-mail to Wes and Patty, telling them to
encourage everyone to make an appearance. They deserve it.
A couple of moments later my phone vibrates. I look down and read a
reply from Wes:
::: block
From: Wes Davis
To: Bill Palmer, Patty McKee
Date: September 16, 4:09 [PM]{.smallcaps}
Subject: Re: Fwd: Throwing a little post-Phoenix party
What a jackass. Most of my guys won't be able to make it. We're still
busy fixing all the bad transaction data that their shitty code
generated.
Must be nice to have the luxury of celebrating. "Mission Accomplished"
and all that, right?
W
:::
I groan. Although the crisis might be over for Chris' guys on the upper
floors, the people like us in the basement are still bailing water.
Still, I think it's important that we get our guys to drop by the party.
In order to succeed, we need to create these relationships with Chris'
team. Even if it's only for a half hour.
I grit my teeth and call Wes. As Spock once said, "Only Nixon could go
to China." And I guess I'm Nixon.
[]{#18-ch15.xhtml}
:::: {}
# Chapter 15 {.ch-title}
## • Wednesday, September 17 {.dateline}
*Even though I can't take the entire day off,* I take Paige out for
breakfast. She's been holding things down on the home front
single-handedly while I have spent every waking hour at work.
We're at Mother's, one of our favorite breakfast restaurants. We were
here on their opening day almost eight years ago. The owner has since
hit the big time. Not only has her restaurant become a local favorite,
but she's written a cookbook, and we saw her all over [TV]{.smallcaps}
during her book tour.
We are so happy to see her success. And I know Paige loves it when the
owner recognizes us, even when it's crowded.
I look in Paige's eyes as she sits across from me at the table. The
restaurant is surprisingly crowded on a Wednesday morning. People having
business meetings and local hipsters doing---well, whatever local
hipsters do in the mornings. Working? Playing? I genuinely have no idea.
She says, holding the mimosa in her hands, "Thanks for taking some time
off---are you sure you can't spend the rest of the day with me?"
At first, I almost didn't order one for myself, because I didn't want to
have anything alcoholic on a workday. But, for the second day in a row,
I find myself saying, "Screw it."
Drinking my orange juice and champagne, I smile sadly, shaking my head.
"I really wish I could, honey. If we were in Development, I'd give the
entire team the day off like Chris did. But, in Operations, we're still
finishing cleaning up from the Phoenix fiasco. I have no idea when life
will be normal again."
She shakes her head slowly. "I can't believe that this is only your
third week. You've changed. I'm not complaining, but I haven't seen you
this stressed out since..."
She looks up for a moment, reviewing her memories. She looks back at me
and says, "Ever! Half the time we're driving in the car, you have this
distant look on your face. The rest of the time you're clenching your
jaw, like you're reenacting some terrible meeting in your head. You
never hear what I'm saying, because you're so preoccupied by work."
I start to apologize, but she cuts me off. "I'm not complaining. I don't
want to wreck this nice moment while we're enjoying some time away from
work and the kids. But, when I think about how happy you were before you
accepted this role, I wonder why you're doing it."
I purse my lips together. Even with all the trauma in the past couple of
weeks, I feel like the organization has been better off as a result of
my contribution. And even with the imminent threat of being outsourced,
I'm glad that I'm one of the people trying to fend them off.
And yet, for over five years, I was one of the very few people able to
maintain any amount of work-life balance. And now that balance is
completely gone.
A fellow [NCO]{.smallcaps} in the Marines once told me that his
priorities were the following: provider, parent, spouse, and change
agent. In that order.
I think about that. First and foremost, my most important responsibility
is to be the provider for my family. My pay raise will help us get our
debt paid down, and we can start saving money again for our children's
college education like we always wanted to. It'd be difficult to give
that up and go back to feeling like we're just treading water.
We both suspect that our house is now worth less than we paid for it. We
tried to sell it a couple of years ago so we could move across town to
be closer to her parents. But after nine months, we took it off the
market.
With my promotion, we can pay off our second mortgage sooner. And maybe,
just maybe, if things go well, in a few years Paige might be able to
stop working.
But is it worth having to deal with Steve's raving demands for the
impossible, day in and day out?
Even worse: having to deal with that nutcase, Sarah.
"See? You're doing it again. Let me guess," Paige says, interrupting my
thoughts. "You're thinking about some meeting that you've had with
Steve, and how he's turned into a total asshole that no one can reason
with. Except for that nutcase, Sarah."
I laugh. "How did you know?"
She smiles. "It's so easy. You start looking off somewhere, and then
your shoulders and jaw tense up, and your lips press together."
I laugh again.
Paige's expression turns sad. "I keep wishing that they picked someone
else for this job. Steve knew exactly how to get you to say yes. He just
made it sound like it was your duty to save his job and the company."
I nod slowly. "But, honey, now it's really true---if they outsource all
of [IT]{.smallcaps}, almost two hundred people in my group could be out
of a job or working for some faceless outsourcing firm. And another two
hundred people in Chris' organization. I really feel like I can keep
that from happening."
She looks dubious, saying, "You really think you and Chris can stop
them? Based on what you've said, it sure sounds like they've already
made up their mind."
------------------------------------------------------------------------
*After I drop off a subdued Paige at home,* I take a moment in the
driveway to look at my phone before driving into work.
I'm surprised when I see an upbeat e-mail from Wes.
::: block
From: Wes Davis
To: Bill Palmer, Patty McKee
Date: September 19, 9:45 [AM]{.smallcaps}
Subject: FW: Whew! A change management close call!
Check this out, guys. One of the [DBA]{.smallcaps}s sent this out to all
the other engineers this morning.
\>\>\> Begin forwarded message:
Guys, the new change process saved our bacon this morning.
Today, we had two groups simultaneously making changes to the materials
management database and application servers. Neither group knew about
the other.
Rajiv spotted the potential collision on the change wall. We decided
that my changes would go in first, and I'd call him when we were done.
We could have totally made a mess of things.
Keep those change cards coming, guys! It saved our butts today!
Thanks to Rajiv, Tom, Shelly, and Brent ---
Robert
:::
At last, some good news. One of the problems of prevention is that you
rarely know about the disasters you averted.
But here we did. Nice.
And even better yet, it came from one of the engineers, not a manager.
When I get to my desk, I see the Post-it note on my docking station and
smile. I carefully power on my laptop, wait patiently for two minutes
for the login screen to come up before plugging it into the docking
station.
No screaming alarm. Exactly as documented. Nice.
Someone knocks on my door.
It's Patty. "I'm glad I caught you. Do you have a minute? I think we
have another problem."
"Sure," I say. "What's on your mind? Let me guess---more people
complaining about change management?"
Patty shakes her head, looking grim. "A little more serious than that.
Let's go to the Change Coordination Room?"
I groan. Every time Patty's summons me there, it's because of some new
intractable problem. But problems, like dog poop left in the rain,
rarely get better just by ignoring them.
I stand up and say, "Lead on."
When we get to the conference room, I look at the change board.
Something looks very different. "Uh-oh," I say.
Patty looks at the board with me and says, "Uh-huh. Obvious, and yet,
still kind of unexpected, right?"
I can only grunt in response.
On the board, up until last Thursday, it's pretty much as I remember it.
On each day, there are somewhere between forty and fifty changes, each
marked completed. But on the days following, there are barely any
changes posted at all. It's like someone just wiped all the cards clean
off the board.
"Where did they go?"
She points at another board on the side of the room that she's labeled,
"Changes To Be Rescheduled." There's a basket underneath, overflowing
with piles and piles of index cards.
Presumably, six hundred of them.
Understanding starting to dawn on me, I ask, "And the reason none of the
changes got completed is..."
Patty rolls her eyes. "Phoenix happened, that's what. All scheduled work
went out the window. We mobilized almost anyone who could type to help.
And only now are they being released back to their normal duties. You
can see on the board that today's the first day that scheduled changes
are starting to happen as planned again."
This seems important for some reason.
And then it hits me.
I had called Erik briefly to tell him that I had discovered three of the
four categories of work: business projects, internal projects, and
changes. He merely said that there was one more type of work, maybe the
most important type, because it's so destructive.
And in a searing moment of insight, I think I know what the fourth
category of work is.
And then suddenly, I don't. My tenuous understanding flickers briefly,
and then goes out entirely.
I say, "Damn!"
Patty looks at me questioningly, but I ignore her while I try to
recapture that fleeting moment of clarity.
I look at the portion of the change board with no cards on it. It really
is like some giant hand swept all those change cards aside that we had
so meticulously scheduled and arranged on the board. And we know what
swept it aside: It was Phoenix blowing up.
But Phoenix isn't the fourth category of work.
Maybe what I'm looking for is like dark matter. You can only see it by
what it displaces or how it interacts with other matter that we can see.
Patty called it firefighting. That's work, too, I suppose. It certainly
kept everyone up at all hours of the night. And it displaced all the
planned changes.
I turn back to Patty and say slowly, "Let me guess. Brent didn't get any
of his non-Phoenix change work completed either, right?"
"Of course not! You were there, right?" she says, looking at me like I
had grown eight heads. "Brent was working around-the-clock on the
recovery efforts, building all the new tooling to keep all the systems
and data up. Everything else was put on the back-burner."
All the firefighting displaced all the planned work, both projects and
changes.
Ah... Now I see it.
What can displace planned work?
Unplanned work.
Of course.
I laugh uproariously, which earns me a look of genuine concern from
Patty, who even takes a step back from me.
That's why Erik called it the most destructive type of work. It's not
really work at all, like the others. The others are what you planned on
doing, allegedly because you needed to do it.
Unplanned work is what prevents you from doing it. Like matter and
antimatter, in the presence of unplanned work, all planned work ignites
with incandescent fury, incinerating everything around it. Like Phoenix.
So much of what I've been trying to do during my short tenure as
[VP]{.smallcaps} of [IT]{.smallcaps} Operations is to prevent unplanned
work from happening: coordinating changes better so they don't fail,
ensuring the orderly handling of incidents and outages to prevent
interrupting key resources, doing whatever it takes so that Brent won't
be escalated to...
I've been doing it mostly by instinct. I knew it was what had to be
done, because people were working on the wrong things. I tried to take
all necessary steps to keep people from doing wrong work, or rather,
unplanned work.
I say, cackling and pumping my arms as if I had just scored a
game-winning, sixty-yard field goal, "Yes! I see it now! It really is
unplanned work! The fourth category of work is unplanned work!"
My ebullient mood is tempered when I look at Patty, who looks puzzled
and genuinely concerned.
"I promise to explain later," I say. "Just what is it that you wanted me
to see on the change board?"
She's taken aback, but points again at the void of completed changes for
the past week. "I know you were concerned about when sixty percent of
the changes weren't getting completed. So, I thought you'd really flip
your lid when one hundred percent of the changes didn't complete.
Right?"
"Yep. This is great work, Patty. Keep it up!" I say agreeably.
And then I turn around and head out the door, reaching for my cell
phone. There's someone I need to call.
"Hey!" Patty calls out. "Aren't you going to fill me in?"
I yell over my shoulder, "Later! I promise!"
------------------------------------------------------------------------
*Back at my desk I search everywhere* for that slip of paper that Erik
gave me. I'm pretty sure I didn't throw it away, but I honestly didn't
think that I would ever use it.
I hear Ellen say from behind me, "Need help with anything?"
And soon, both of us are scrounging all over my desk to find that little
piece of paper.
"Is this it?" she asks, holding up something that she retrieved from my
inbox.
I look more closely, and yes! It's the crumpled two-inch strip of paper
that Erik gave me. It looks like a gum wrapper.
Taking the piece of paper from her and holding it up, I say, "Great!
Thank you so much for finding this---believe it or not, this may be the
most important piece of paper I've gotten in years."
I decide to sit outside while I talk. In the bright autumn sunlight, I
find a spot on a bench near the parking lot. As I sit down, there's not
a cloud in the sky.
I call Erik, who answers on the first ring. "Hey, Bill. How are you guys
doing after Phoenix crashed and burned so spectacularly?"
"Yeah, well... Things are improving," I say. "You may have heard that
our [POS]{.smallcaps} systems went down, and we also had a small credit
card number breach."
"Ha! 'Small credit card breach.' I like that. Like 'small nuclear
reactor meltdown.' I've gotta write that one down," he says, snorting.
He's chuckling as though he predicted this level of calamity would
occur, which, come to think of it, I suppose he did, in the conference
room when I first met him. Something about "clearing the calendar."
Just like clearing the change board, I realize. I kick myself for not
picking up on his clue sooner.
"I trust you can tell me now what the four categories of work are?" I
hear him ask.
"Yes, I think I can," I say. "At the plant, I gave you one category,
which was business projects, like Phoenix," I say. "Later, I realized
that I didn't mention internal [IT]{.smallcaps} projects. A week after
that, I realized that changes are another category of work. But it was
only after the Phoenix fiasco that I saw the last one, because of how it
prevented all other work from getting completed, and that's the last
category, isn't it? Firefighting. Unplanned work."
"Precisely!" I hear Erik say. "You even used the term I like most for
it: *unplanned work*. Firefighting is vividly descriptive, but
'unplanned work' is even better. It might even be better to call it
'anti-work,' since it further highlights its destructive and avoidable
nature.
"Unlike the other categories of work, unplanned work is recovery work,
which almost always takes you away from your goals. That's why it's so
important to know where your unplanned work is coming from."
I smile as he acknowledges my correct answer, and am oddly pleased that
he validated my antimatter notion of unplanned work, as well.
He says, "What is this change board that you mentioned?"
I tell him about my attempts to get some sort of change process going
and my attempt to elevate the discussion above how many fields there
were on the change form, which then resulted in getting people to put
their intended changes on index cards and our need to juggle them on the
board.
"Very good," he says. "You've put together tools to help with the visual
management of work and pulling work through the system. This is a
critical part of the First Way, which is creating fast flow of work
through Development and [IT]{.smallcaps} Operations. Index cards on a
*kanban* board is one of the best mechanisms to do this, because
everyone can see [WIP]{.smallcaps}. Now you must continually eradicate
your largest sources of unplanned work, per the Second Way."
Until now, having been so wrapped up in defining what work is, I had
forgotten about Erik and his Three Ways. I dismissed them before, but
I'm now listening closely to his every word.
And over the next forty-five minutes, I find myself telling him the
entire tale of my short tenure. I'm interrupted only by Erik's loud
laughs and guffaws as I describe the calamities and my attempts to curb
the chaos.
When I'm finished, he says, "You've come much further than I thought:
You've started to take steps to stabilize the operational environment,
you've started to visually manage [WIP]{.smallcaps} within
[IT]{.smallcaps} Operations, and you've started to protect your
constraint, Brent. You've also reinforced a culture of operational rigor
and discipline. Well done, Bill."
I furrow my brows and say, "Wait. Brent is my constraint? What do you
mean?"
He replies, "Ah, well if we're going to talk about your next steps, you
definitely need to know about constraints because you need to increase
flow. Right now, nothing is more important."
Erik assumes a lecturing voice as he starts, "You say you learned about
plant operations management when you were in business school. I hope as
part of your curriculum, you read *The Goal* by Dr. Eli Goldratt. If you
don't have a copy anymore, get another one. You're going to need it."
I think my copy of that book is in my office at home. As I jot a quick
reminder to look for it, he continues, "Goldratt taught us that in most
plants, there are a very small number of resources, whether it's men,
machines, or materials, that dictates the output of the entire system.
We call this the constraint---or bottleneck. Either term works. Whatever
you call it, until you create a trusted system to manage the flow of
work to the constraint, the constraint is constantly wasted, which means
that the constraint is likely being drastically underutilized.
"That means you're not delivering to the business the full capacity
available to you. It also likely means that you're not paying down
technical debt, so your problems and amount of unplanned work continues
to increase over time," he says.
He continues, "You've identified this Brent person as a constraint to
restore service. Trust me, you'll find that he constrains many other
important flows of work, as well."
I try to interrupt to ask a question, but he continues headlong, "There
are five focusing steps which Goldratt describes in *The Goal*: Step 1
is to identify the constraint. You've done that, so congratulations.
Keep challenging yourself to really make sure that's your organizational
constraint, because if you're wrong, nothing you do will matter.
Remember, any improvement not made at the constraint is just an
illusion, yes?
"Step 2 is to exploit the constraint," he continues. "In other words,
make sure that the constraint is not allowed to waste any time. Ever. It
should never be waiting on any other resource for anything, and it
should always be working on the highest priority commitment the
[IT]{.smallcaps} Operations organization has made to the rest of the
enterprise. Always."
I hear him say encouragingly, "You've done a good job exploiting the
constraint on several fronts. You've reduced reliance on Brent for
unplanned work and outages. You've even started to figure out how to
exploit Brent better for the three other types of work: business and
[IT]{.smallcaps} projects and changes. Remember, unplanned work kills
your ability to do planned work, so you must always do whatever it takes
to eradicate it. Murphy does exist, so you'll always have unplanned
work, but it must be handled efficiently. You've still got a long way to
go."
In a more stern voice, he says, "But you're ready to start thinking
about Step 3, which is to subordinate the constraint. In the Theory of
Constraints, this is typically implemented by something called
Drum-Buffer-Rope. In *The Goal*, the main character, Alex, learns about
this when he discovers that Herbie, the slowest Boy Scout in the troop,
actually dictates the entire group's marching pace. Alex moved Herbie to
the front of the line to prevent kids from going on too far ahead. Later
at Alex's plant, he started to release all work in accordance to the
rate it could be consumed by the heat treat ovens, which was his plant's
bottleneck. That was his real-life Herbie."
"Fully two decades after *The Goal* was published," he continues, "David
J. Anderson developed techniques of using a kanban board to release work
and control [WIP]{.smallcaps} for Development and [IT]{.smallcaps}
Operations. You may find that of interest. You and Penelope are close
with your change board to a kanban board that can manage flow."
"So, here's your homework," he says. "Figure out how to set the tempo of
work according to Brent. Once you make the appropriate mapping of
[IT]{.smallcaps} Operations to work on the plant floor, it will be
obvious. Call me when you've figured it out."
"Wait, wait," I say, hurriedly before he hangs up. "I'll do the
homework, but aren't we missing the entire point here? What caused all
the unplanned work is Phoenix. Why are we focusing on Brent right now?
Don't we need to address all the issues with Phoenix inside of
Development, where all the unplanned work actually came from?"
"Now you sound just like Jimmy, complaining about things you can't
control," he sighs. "Of course Phoenix is causing all the problems. You
get what you design for. Chester, your peer in Development, is spending
all his cycles on features, instead of stability, security, scalability,
manageability, operability, continuity, and all those other beautiful
'itties.
"On the other end of the assembly line, Jimmy keeps trying to retrofit
production controls after the toothpaste is out of the tube," he says,
scoffing. "Hopeless! Futile! It'll never work! You need to design these
things, what some call 'nonfunctional requirements,' into the product.
But your problem is that the person who knows the most about where your
technical debt is and how to actually build code that is designed for
Operations is too busy. You know who that person is, don't you?"
I groan. "Brent."
"Yep," he says. "Without solving your Brent problem, you'll just be
inviting him to design and architecture meetings with Development, but
he'll never show up because..."
Being prompted again, I respond, "Unplanned work."
"Good!" he says. "You're getting better at this. But before you get a
big head, I'll tell you that there's still a big piece of the First Way
that you're missing. Jimmy's problem with the auditors shows that he
can't distinguish what work matters to the business versus what doesn't.
And incidentally, you have the same problem, too. Remember, it goes
beyond reducing [WIP]{.smallcaps}. Being able to take needless work out
of the system is more important than being able to put more work into
the system. To do that, you need to know what matters to the achievement
of the business objectives, whether it's projects, operations, strategy,
compliance with laws and regulations, security, or whatever."
He continues, "Remember, outcomes are what matter---not the process, not
controls, or, for that matter, what work you complete."
I sigh. Just when I think I have a concrete enough understanding of
constraints, once again Erik becomes illusive.
"Don't get distracted. Call me when you know how to throttle release of
work to Brent," he says and hangs up.
I can't believe it. I try calling him back twice, but it rolls
immediately to his voicemail.
Sitting down on the bench, I lean back, take a deep breath, and force
myself to enjoy the warm morning. I hear birds chirping and the noise of
traffic from the road.
Then, for the next ten minutes, I capture as much as I can remember on
my clipboard, trying to piece together what Erik covered.
When I'm done, I head inside to call Wes and Patty. I know exactly what
I need to do and am excited to get started.
::::
[]{#19-ch16.xhtml}
# Chapter 16 {.ch-title}
## • Thursday, September 18 {.dateline}
*I'm at my desk,* tying up some loose ends when Ellen runs up to me,
holding an e-mail printout. It's from Dick, raising the alarm with all
company executives that something has gone terribly wrong with the
company invoicing systems. Earlier today, one of the clerks discovered
that no customers had been invoiced for three days. Among other things,
this means that customers haven't been paying on time, which means the
company will have less cash in the bank at the end of the quarter than
projected, which will raise all sorts of uncomfortable questions when
the company earnings are announced.
It's clear from Dick's string of e-mails that he's livid, and
apparently, his whole accounts receivable staff and controller have been
chain smoking and doing damage control at all levels.
::: block
From: Dick Landry
To: Steve Masters
Cc: Bill Palmer
Date: September 18, 3:11 [PM]{.smallcaps}
Priority: Highest
Subject: [ACTION NEEDED]{.smallcaps}: Potential \$50[MM]{.smallcaps}
cash shortfall due to [IT]{.smallcaps}[ ]{.smallcaps}failure
[ALL CUSTOMER INVOICES ARE STILL STUCK OR MISSING IN THE SYSTEM. WE
CAN'T EVEN RETRIEVE THEM TO MANUALLY SEND INVOICES BY E-MAIL!
]{.smallcaps}
We're trying to figure out how we can resume normal business operations.
There's likely \$50[MM]{.smallcaps} of receivables stuck in the system,
which will be missing from our cash account at end of quarter.
Get your [IT]{.smallcaps} guys to fix this. The hole this blows in our
quarterly numbers will be impossible to hide, and maybe even impossible
to explain away.
Call me, Steve. I'll be on the window ledge.
Dick
:::
We're all gathered in the [NOC]{.smallcaps} conference room. I'm pleased
that when Patty finishes describing the incident, she quickly presented
all the relevant changes for the last seventy-two hours.
After she's done, I say firmly to the entire team, "First and foremost
on my mind is the risk of losing transactions. Ladies and gentlemen, I
need to be very clear about this: [DO NOT TOUCH ANYTHING WITHOUT GETTING
APPROVAL FROM ME.]{.smallcaps} This is not an outage we're dealing with
here. We're in a situation where we could accidentally lose order entry
or accounts receivable data. This terrifies me. And *that* should
absolutely terrify *you*.
"As Patty said, we need timelines and hypotheses for what might have
caused the invoicing system to fail," I say. "This is our *Apollo 13*
moment, and I'm Gene Kranz in Houston Mission Control. I don't want
guesswork. I want hypotheses backed up with facts. So get back to your
screens, assemble timelines and data, and I want to hear your best
thinking on cause and effect. Failure is not an option."
By 6 p.m., Patty's team has documented over twenty different potential
failure causes that have been proposed. After further investigation,
eight remain as likely possibilities. An owner has been assigned to look
into each.
Realizing that there's little more we can do as a group until they
complete their research, we agree to reconvene at 10 p.m. tonight.
On the one hand, I'm frustrated that once again, we've been plunged into
a crisis and our day is dominated by unplanned incident work. On the
other hand, I feel a deep sense of satisfaction at the orderly nature of
our incident investigation and quickly text Paige that I'll be joining
the family for dinner shortly.
------------------------------------------------------------------------
*"Daddy," I hear, as I'm sitting in bed with Grant,* trying to put him
to sleep while keeping the thoughts of outages out of my head. "Why
doesn't Thomas the Tank Engine have a tender car? Why?"
Smiling down at him, I marvel at the questions my three-year-old son
comes up with. We're going through our nighttime ritual of reading
books. I'm glad to be doing this again, which I do every night. Or did,
that is, until the Phoenix recovery effort.
Most of the lights are off, but one lamp is still dimly lit. There is a
pile of books on Grant's bed, and we're on the third one of the night.
I'm starting to get a little dry-mouthed from reading. The idea of
taking a little break and doing some research on the Internet on train
tender cars sounds pretty appealing.
I love how inquisitive my kids are and how much they love books, but
there are nights when I'm so exhausted that I've actually fallen asleep
during our nightly ritual. My wife will walk in, find me asleep with one
of Grant's books lying on top of my face and Grant asleep beside me.
Despite how tired I am, I'm grateful to be at home early enough to
resume my nighttime ritual with my older son.
"Yes, we need to find out, Daddy," Grant demands. I smile at him, and I
dig my phone out from my pocket, intending to do a Google search for
"tank engine tender car."
But first, I quickly scan my phone for any new updates on the customer
invoicing problem. I'm amazed at the difference two weeks can make.
During the last Sev 1 incident that hit our credit card processing
systems, the conference call was full of finger-pointing, denials, and,
most importantly, wasted time when our customers couldn't give us money.
Afterward, we did the first of a series of ongoing blameless postmortems
to figure out what really happened and come up with ideas on how to
prevent it from happening again. Better yet, Patty led a series of mock
incident calls with all hands on deck, to rehearse the new procedures.
It was terrific to watch. Even Wes saw the value.
I'm pleased to see all the e-mails indicating a lot of good information
and effective discussion among the teams working the problem. They've
kept the telephone conference bridge and a chat room open for people
working the issue, and I plan on calling in at 10 p.m. to see how it's
going.
That's forty-five minutes from now. Plenty of time to spend with Grant,
who should be falling asleep soon.
He nudges me, obviously expecting more progress on the research front.
"Sorry, Granty. Daddy got distracted," I say as I open up the browser.
I'm surprised by how many of the search results are all about Thomas the
Tank Engine. It's the book series that spawned a multibillion dollar
franchise of toy trains, clothing, videos, and coloring books. With two
sons, we seem destined to own two of every item soon.
I'm reading a promising *Wikipedia* entry on trains when my phone starts
vibrating and the screen displays "Call from Steve Masters."
I groan and double-check my watch. It's 9:15 p.m.
I've had way too many meetings and phone calls with Steve lately. In my
head, I wonder how many of these meetings I can take.
On the other hand, after the Phoenix debacle, every outage and incident
is trivial in comparison, right?
I say gently, "Hang on, Grant. Daddy has to take a phone call. I'll be
right back." I jump out of his bed and walk into the dark hallway.
I'm glad I had just scanned through all the e-mail traffic on the outage
just seconds before. I take a deep breath before I hit the button to
answer the call.
I say, "Bill here."
Steve's loud voice booms in my ear. "Evening, Bill. I'm glad you're
there. Of course you know about the customer invoicing problems from
Dick?"
"Yes, of course," I reply, surprised at his tone. "My team declared a
major incident early this afternoon and we've been working this issue
ever since. I've been sending out status reports every hour. Dick and I
spent twenty minutes on the phone earlier this evening. I know the
problem is serious, and my team is following the process we've created
after the payroll failure. I'm completely satisfied that the process is
working."
"Well I just got off the phone with Dick, and he tells me that you're
dragging your feet," says Steve, clearly very angry. "Obviously, I'm not
calling you at night because I want to chitchat. Do you understand how
intolerable this is? Yet another [IT]{.smallcaps} screwup jeopardizing
everything. Cash is the lifeblood of the company, and if we can't
invoice customers, we can't get paid!"
Falling back on old training on handling frustrated people, I calmly
reiterate what I already stated. "As I said, I talked with Dick earlier
today. He very much impressed upon me all the implications. We've
activated our new incident process, and we're methodically looking into
what could have caused the failure. They're doing exactly what I want
them to, because with so many moving pieces, it's way too easy to make
things worse by jumping to conclusions---"
"Are you in the office?" Steve demands, cutting me off before I could
finish.
His question genuinely catches me off guard.
"Uh... No, I'm at home," I answer.
Is he worried that I've delegated the problem away? To reinforce my role
in handling the crisis and what my expectations from my team are, I say,
"I will be calling into the war bridge line at ten o' clock. As always,
we have a duty officer on site, and those on my staff who need to be in
the office are there already."
Finally, I ask bluntly, "Steve, want to tell me what's on your mind? I'm
on top of this situation. What do you need that you aren't getting right
now?"
He responds hotly, "What I need from you is some sense of urgency. Dick
and his team are burning the midnight oil trying to figure out how our
quarter will end up in six working days. But I think I already know what
the answer will be."
He continues, "We'll probably miss almost every target that we've
promised the board: revenue, cash, receivables---everything. In fact,
every measure we've promised the board is going the wrong way! This
screwup may confirm the board's suspicion that we've completely lost
control of managing this company!"
Steve is almost snarling now as he says, "So, what I want from you,
*Bill*, is to stay sufficiently on top of things, so that I don't have
my [CFO]{.smallcaps} saying that you're dragging your feet. The house is
burning down, and all I hear from you is about drawing pictures and
timelines. What in the hell is wrong with you? You afraid to get people
out of bed?"
I start again, "Steve, if I thought it would help, I'd have everyone
pull all-nighters in the data center tonight. For Phoenix, some people
didn't go home for nearly a week. Trust me, I know the house is on fire,
but right now, more than anything, we need situational awareness. Before
we send the teams crashing through the front door with fire hoses, we
have to have someone at least quickly walk the perimeter of the
yard---otherwise, we'll end up burning down the houses next door!"
I realize that I've raised my voice in the relative quiet of our house
as we're trying to get the kids to sleep. I resume, more quietly, "And
just in case you forgot, during the payroll outage, we made the outage
worse by our own actions. We probably could have completed the payroll
run during the business day if someone hadn't started screwing with the
[SAN]{.smallcaps}. Because of that, we added another six hours to the
outage, and we nearly lost payroll data!"
My hopes that the calm voice of reason is reaching him are dashed when I
hear him say, "Oh, yeah? I don't think your team agrees with you. What
was the name of that smart guy who you introduced me to? Bob? No, Brent.
I talked with Brent earlier today, and he's very skeptical of your
approach. He thinks what you're doing is separating people who actually
do the work from what needs to get done. What is Brent doing right now?"
Shit.
I like transparency. I always try to make my team totally accessible to
my boss and the business. But there's always risk in doing this.
Like having Brent spout off his crazy theories to the [CEO]{.smallcaps}.
"I hope Brent is at home, because that's exactly where he should be," I
respond. "Until we know for sure exactly what went wrong, that's where I
want him. Look, it's rocket scientists like him that often cause the
problem in the first place. Every time we escalate to Brent, we
perpetuate our reliance on him, and make it that much less likely we can
fix things without him!"
Suspecting that I may be losing Steve, I start again. "The chaotic way
we currently work, Brent is having to fix the punctured hulls almost
every day. I'm pretty sure, though, that Brent is one of the main
reasons the hull is punctured in the first place. It's not malicious, of
course, but it's just a side effect of the way we work and fix outages
here."
There is a pause. Then he says slowly and decisively, "I'm glad you're
being so professorial about this, but we've got a wildfire that's out of
control. Up until now, we've done it your way. And now we're going to do
it my way.
"I want you to call Brent in, and I want him to roll up his sleeves and
help fix this outage. And not just Brent. I want all eyeballs on screens
and all hands on keyboards. I'm Captain Kirk. You're Scotty. And I need
warp speed, so get your lazy engineers off their asses! Do you
understand me?"
Steve is yelling so loudly by now that I'm holding the phone away from
my ear.
Suddenly, I'm furious. Steve is going to screw this up again.
Recalling my days in the Marines, I finally say, "Permission to speak
freely, sir?"
I hear Steve on the other end of the line snort dismissively in
response. "Yes, dammit."
"You think I'm being overly cautious, and that I'm hesitating to do what
needs to be done. But you are wrong. Dead wrong," I say adamantly. "If
you do what I think you're suggesting, which is basically 'all hands on
deck,' I predict that we're going to make things much worse."
I continue, "I tried to advise you of something very similar before the
Phoenix launch. Up until now, we have not been sufficiently disciplined
in how we work outages. Given all the complexity and moving pieces,
there's too much likelihood of causing another problem. I may not know
exactly what caused the customer invoicing issue, but I know enough to
absolutely conclude that what you're proposing is a very bad idea. I
recommend continuing along the lines I am currently prosecuting."
I hold my breath, waiting to hear how he reacts.
He says slowly, "I'm sorry you feel that way, Bill, but the drawers open
on my side of the desk. I'm telling you that it's now
[DEFCON]{.smallcaps} 1, so go get the smartest people working on this
problem. And I want status updates on this [IT]{.smallcaps} failure
every two hours until it's fixed. Understood?"
Before I can think about what to say, I find myself saying, "I don't
know why you need me to do that. You're talking directly to my people,
and you're calling all shots on the ground. Do it yourself. I can't be
held responsible for the results of this [FUBAR]{.smallcaps} situation."
And before I hang up on him, I say with finality, "And expect my
resignation in the morning."
I wipe the sweat off my forehead, and look up from my phone to see my
wife Paige staring at me wide-eyed.
"Are you insane? You just quit? Just like that? How are we going to pay
the bills now?" she asks, her voice rising.
I turn the ringer off on my phone and put it back in my pocket, saying,
"Honey, I'm not sure how much of that conversation you heard, but let me
explain..."
[]{#20-ch17.xhtml}
# Chapter 17 {.ch-title}
## • Monday, September 22 {.dateline}
*In the four days since quitting,* Paige has been fretting endlessly. On
the other hand, I'm amazed at how much better I'm sleeping at night, as
if some huge, hidden weight has been lifted from my shoulders.
Uninterrupted by e-mails or emergency pages, the weekend was incredibly
peaceful. I was still receiving them on Thursday, but I just deleted the
e-mail accounts and blocked the text messages.
It felt great.
I tell Paige not to take Grant to her mother's. Instead, I'm taking him
on an adventure. Paige reacts with a bemused smile and helps me pack his
Thomas the Tank Engine backpack.
By 8 a.m., we're out of the house and heading happily to the train
station, where, for months, I've been promising to take him. For an hour
we watch trains go by, and I'm continually amazed at Grant's unabashed
joy. Despite the uncertainty around what I'll be doing next, I feel
blessed that I can share this moment with Grant.
As I'm taking pictures of Grant screaming with delight and pointing at
the diesel trains going by, I realize how few pictures I've taken of
either of my kids in the last month.
We're still watching the trains when my phone rings. It's Wes. I let it
roll to voicemail.
He calls several more times, and each time he leaves another voicemail.
Then Patty calls, which I let roll to voicemail, too. After three more
calls, I mutter in exasperation, "Come on, guys..."
"Palmer," I answer the phone.
"Bill, we just heard the news from Steve," I hear Patty say, sounding
like she's on a speakerphone. With surprising anger in her voice, she
continues, "I've got Wes here, and we're both completely shocked. We
knew something wasn't right when you didn't show up for our regular
[CAB]{.smallcaps} meeting on Friday. I just can't believe you resigned
during this outage---and after everything we've achieved!"
"Look, guys, it has nothing to do with you," I explain. "Steve and I
just had some irreconcilable differences about how to resolve the big
invoicing failure. I'm sure you guys will do fine without me."
As I say the last part, I feel slightly disingenuous.
"Well, we've pretty much screwed the pooch since you've left," Wes says,
sounding genuinely abashed, confirming my worst fears. "Steve insisted
that we bring in all the engineers, including Brent. He said he wanted a
'sense of urgency' and 'hands on keyboards, not people sitting on the
bench.' Obviously, we didn't do a good enough job coordinating
everyone's efforts, and..."
Wes doesn't finish his sentence. Patty picks up where he left off, "We
don't know for sure, but at the very least, the inventory management
systems are now completely down, too. No one can get inventory levels in
the plants or warehouses, and they don't know which raw materials we
need to replenish. All the finance guys are about to jump from window
ledges, because they may not be able to close the books for the quarter
on time. With all these systems down, no one has the data they need to
compute cost of goods sold, gross profit, and net margin."
"Holy shit." Speechless for a moment, I finally say, "That's
incredible."
Grant grabs at my phone, demanding my attention. I say, "Look, guys, I'm
with my son, and we're in the middle of something important. I can't
talk for very long. But rest assured that I'm really proud of everything
that we've done together, and I know that you guys can get through this
crisis without me."
"That's a load of junk, and you know it," Patty says. "How can you leave
us in the lurch like this? We have so many things that we planned on
fixing together, and you're leaving it all completely unfinished! I
never figured you as someone who would quit like this!"
"I agree. Leaving now is pretty shitty, if you ask me," Wes says,
chiming in.
I sigh. I'm never going to tell them about all the frustrating and
absurd meetings I've had to put up with Steve. That's between him and
me.
"I'm sorry to let you down, but it's something that I had to do," I say.
"You'll do just fine. Just don't let Steve or anyone else micromanage
you. No one knows the [IT]{.smallcaps} systems like you guys do, so
don't let anyone try to call the shots, okay?"
I hear Wes mutter, "Too late for that."
By now, Grant is trying to hang up my phone. "Guys, I've got to run.
We'll catch up later, okay? Over beers."
"Yeah, sure," Wes says.
"Gee, thanks for everything," Patty says. "Catch you around."
With that, the line disconnects.
I let out a long sigh. Then, looking at Grant, I put away my phone and
give him my full attention again, intent on recapturing our moment of
happiness before it was interrupted.
------------------------------------------------------------------------
*My phone rings again on our drive home.* Grant is asleep in the
backseat. This time, it's Steve.
Having no interest in talking with him just yet, I let it go to
voicemail. Three times.
I pull into our garage and get out of the car, trying to get Grant out
of his car seat without waking him up. As I walk through the house with
him, I see Paige. I point to Grant, silently mouthing to her, "Asleep."
I pad softly up the stairs, at last transferring him to his bed and
taking off his shoes.
With a sigh of relief, I close the door behind me and walk back
downstairs.
When Paige sees me, she says, "That bastard Steve called me this
morning. I almost hung up on him, but he gave me a long story about
doing all this soul-searching with some guy named Erik. He says he has a
proposition for you. I told him I'd pass along the message."
When I roll my eyes, she says in a suddenly concerned voice, "Look, I
know you resigned because you felt it was the right thing to do. But you
know as well as I do that there aren't many other companies in town that
pay as well as Parts Unlimited. Especially after your promotion. I don't
want to move away from my family."
She looks levelly at me. "Honey, I know he's a bastard, but we both
still need to earn a living. Promise me that you'll listen to what Steve
has to say and keep an open mind, okay? Bill? Okay?"
I merely nod and step into the dining room, hitting the speed dial for
Steve.
Steve answers his cell phone on the first ring. "Good afternoon, Bill.
Thanks for calling me back. I had the pleasure of talking with your
wife, telling her all about what a jackass I've been."
"Yeah, she said something to that effect," I respond. "She said that you
really wanted to talk."
I hear him say, "Look, I wanted to apologize for the way I've behaved
since you graciously accepted my request to become our [VP]{.smallcaps}
of [IT]{.smallcaps} Operations. Dick thought I was crazy when I told him
that I was going to have [IT]{.smallcaps} report to me. But I told him
about how, when I first became a plant manager, many decades ago, I
worked on the assembly line for a month, just to make sure that I
understood the ins and outs of daily life of everyone who worked there.
"I promised Dick that I would get my hands dirty and not just delegate
the problem away. I'm angry with myself that I haven't lived up to that
promise. And delegating all the [IT]{.smallcaps} issues to Sarah was a
total screwup.
"Listen, I know I haven't been fair to you, especially when you've
fulfilled your end of the bargain. You've been a straight shooter, and
you've genuinely tried to prevent bad things from happening."
He pauses for a couple of moments. "Look, I just got kicked in the ass
by Erik and by the entire audit committee. He held my feet to the fire
until I finally understood something. It made me realize that I've been
doing something really wrong for many years, and I want to make it
right.
"In short, I'd like you to resume your role as [VP]{.smallcaps} of
[IT]{.smallcaps} Operations, effective immediately. I'd like to work
with you, as Erik coined it, as the two sides of a dysfunctional
marriage. Maybe the two of us together can figure out what is really
going wrong with how [IT]{.smallcaps} is managed here at Parts
Unlimited.
"I'm convinced that [IT]{.smallcaps} is a competency that we need to
develop here. All I'm asking is that you spend ninety days with me and
give it a try. And if at the end of the ninety days you still want to
bail, then you can do so, with a one-year severance package."
Remembering my promise to Paige, I choose my words carefully. "You've
been pretty consistent in being, as you say, a complete jackass for the
past month. I've been very consistent in presenting to you my analyses
and recommendations, over and over again. And each time, you've crapped
on it. Why should I trust you now?"
Forty-five minutes later, after Steve continually tries to woo me back,
I hang up the phone and go back into the kitchen where Paige is waiting
to hear what happened.
[]{#21-ch18.xhtml}
# Chapter 18 {.ch-title}
## • Tuesday, September 23 {.dateline}
*The next morning,* I'm driving into work at 6:30 a.m. for Steve's
[IT]{.smallcaps} leadership off-site. He's calling it an off-site, even
though the meeting is in Building 2.
Earlier this morning, I padded softly into Grant and Parker's rooms to
say goodbye. Watching Parker sleep, I kissed him and whispered softly,
"Sorry that daddy couldn't take you on an adventure today. It was your
turn, but Daddy has to go back to work. This weekend, I promise."
This better be worth it, Steve.
The meeting is in the corporate boardroom. Walking onto the fifteenth
floor, I still can't believe how different it is than all the other
buildings.
Chris, Wes, and Patty are already here, all holding coffee cups and
plates full of pastries.
Patty barely acknowledges my presence.
Wes greets me loudly, saying sarcastically, "Hey, Bill. Nice to see you.
I hope you don't quit again today."
Thanks, Wes.
Chris acknowledges me with an understanding smile, rolling his eyes and
making the motions of getting a beer. I nod and smile, and turn to the
back of the room.
My mood brightens when I see the Vandal Doughnuts in back, and I start
loading up my paper plate. As I'm trying to decide whether having six
doughnuts on my plate is a breach of social protocol, I feel a hand clap
me on my shoulder.
It's Steve. "Good to see you again, Bill. I'm glad you're here." Looking
down at my overflowing plate, he laughs loudly. "Why not just take the
entire platter with you?"
"Good idea. Glad to be here," I reply.
Erik takes a seat right across from me, saying, "Morning, Bill." Behind
him is a large suitcase that he had lugged in.
I squint at the suitcase. The last time I saw a suitcase without wheels
was in my mother's attic twenty years ago.
Erik's hair is dripping wet, soaking the shoulders of his denim shirt.
Was he running late this morning and had to run out of his hotel without
drying his hair? Or does he look like this every morning?
Where exactly did Steve find this guy?
"Good morning," Steve says, addressing the room. "First, I appreciate
everyone making it here so early. Especially since I know that you and
your teams have been working incredibly long hours over the last two
weeks."
"Ha!" Erik snorts. "That's probably the understatement of the century."
Everyone laughs nervously, going to extra lengths to not make eye
contact with anyone else.
Steve smiles sadly. "I know that the last couple of weeks have been
harrowing. I now realize just how much responsibility I bear for all of
this. Not just for the Phoenix disaster, but everything leading up to
the audit issues, the customer invoicing and inventory failures over the
last couple of days, and the trouble we're having with the auditors."
He stops, obviously distraught and needing a moment to compose himself.
Is he tearing up?
Now here's a side of Steve you don't see every day. What the heck
happened to Steve after I left?
He puts down an index card that he's been holding, shrugs his shoulders
and gestures to Erik. "Erik described the relationship between a
[CEO]{.smallcaps} and a [CIO]{.smallcaps} as a dysfunctional marriage.
That both sides feel powerless and held hostage by the other."
His fingers worry at the card. "There are two things I've learned in the
last month. One is that [IT]{.smallcaps} matters. [IT]{.smallcaps} is
not just a department that I can delegate away. [IT]{.smallcaps} is
smack in the middle of every major company effort we have and is
critical to almost every aspect of daily operations."
He says, "I know that right now, nothing, absolutely nothing, is more
important to the company's success than how this leadership team
performs.
"The second thing I've learned is that my actions have made almost all
our [IT]{.smallcaps} problems worse. I turned down Chris and Bill's
requests for more budget, Bill's request for more time to do Phoenix
right, and micromanaged things when I wasn't getting the results I
wanted."
Steve then looks at me. "The person I wronged the most was Bill. He told
me things that I didn't want to hear, and I shut him down. In hindsight,
he was completely right, and I was completely wrong. And for that, Bill,
I'm very sorry."
I see Wes' jaw drop open.
Completely embarrassed, I merely say, "All water under the bridge now.
Like I said to you yesterday, Steve, apology not expected, but
appreciated."
Steve nods and looks at his card for several moments. "The huge
challenges ahead of us will require an outstanding team operating at
their absolute best. Yet, we don't completely trust one another. I know
that I am partially to blame, but that needs to end now.
"Over the weekend, I thought back on my career, which as you may know,
could end at any moment, as my board has made clear. I know that my most
rewarding times were always when I was part of a great team. That goes
for both my professional and personal life.
"A great team doesn't mean that they had the smartest people. What made
those teams great is that everyone trusted one another. It can be a
powerful thing when that magic dynamic exists.
Steve continues, "One of my favorite books about team dynamics is *Five
Dysfunctions of a Team*, by Patrick Lencioni. He writes that in order to
have mutual trust, you need to be vulnerable. So, I'm going to tell you
a little about myself and what makes me tick. And then I'm going to ask
you to do the same.
"It may make you uncomfortable, but it's part of what I need from you as
leaders. If you can't do it for yourself, do it for the livelihood of
the nearly four thousand Parts Unlimited employees and their families. I
don't take that responsibility lightly, and you shouldn't either."
Oh, shit. That's another part of "management off-sites" I forgot about.
Touchy-feely crap.
Steve ignores the skyrocketing tension in the room as everyone, like me,
puts up their deflector shields. "My family was dirt poor, but I'm
extremely proud to be the first one to actually make it to college. No
one before me made it out of high school. Growing up in rural Texas, my
parents worked in a cotton mill. During the summers, my brothers and I
were too young to work there, so we' d pick cotton in the fields."
People picked cotton in the last century? I quickly do the math in my
head, wondering if this was possible.
"So there I am, on top of the world at the University of Arizona. My
parents don't have money to pay tuition, so I find a job at a copper
mine.
"I don't know if [OSHA]{.smallcaps} existed back then, but if they
visited that mine, they would have shut it down. It was dangerous and
filthy." He points at his left ear, saying, "I lost most of my hearing
in this ear when some explosives went off too close to me.
"I finally get my first big break when I land a job at a pipe
manufacturing plant, helping with equipment maintenance. This is the
first job where I'm paid to think.
"I study management, and more than anything, I want to go into sales
after college. From what I see at the plant, those sales guys have the
best jobs in the world. They get paid to wine and dine clients, and they
travel from city to city, seeing what all the best factories are doing."
Steve shakes his head ruefully. "But that's not how it turns out. To
help pay for school, I join [ROTC]{.smallcaps} where I get my first
glimpse of what kids from middle-class America are like. And it means
that after college, instead of going to work in industry, I have to
fulfill my obligations to the US Army, which is where I discover my love
for logistics. I make sure materials get to where they need to. Soon, I
have a reputation of being the go-to guy when you really need just about
anything."
I'm riveted. Steve's a good storyteller.
"But it's hard being a poor country hick, surrounded by people from
privileged families. I feel like I need to prove myself to everyone. I'm
twenty-five years old, and I still have fellow officers constantly
calling me dumb and slow because of my accent and upbringing..." he
says, as his voice cracks slightly.
"It makes me even more determined to prove myself. After nine years, I'm
ready to leave the Army after a distinguished career. Right before I'm
discharged, my commanding officer tells me something that changes my
life.
"He says that although I've gotten consistently high ratings over the
years, without exception, none of the people who served under me would
want to work with me again. He tells me that if there were an Asshole of
the Decade Award, I'd win by a wide margin. And that if I want to make
something of myself, I need to get this fixed."
In the corner of my eye, I see Wes roll his eyes at Chris, who pointedly
ignores him.
"I know what you're thinking," Steve says, nodding at Wes. "But it's one
of the most crushing moments of my life, and I realize that I've made a
critical mistake in how I was living my life, betraying my own values.
"Over the next three decades, I became a constant student of building
great teams that really trust one another. I did this first as a
materials manager, then later as a plant manager, as head of Marketing,
and later, as head of Sales Operations. Then twelve years ago, Bob
Strauss, our [CEO]{.smallcaps} at the time, hired me to become the new
[COO]{.smallcaps}."
Steve exhales slowly, rubbing his face, suddenly looking very tired and
old. "Somehow, I've made the wrong turn again, just like I did in the
Army. I've become that person I promised myself I'd never be again."
He stops talking and looks around the room. The silence goes on for a
long time as we watch him stare out the window. The bright sun is
starting to stream in through the conference room windows.
Steve says, "We have big problems in front of us that we need to fix.
Erik is right. [IT]{.smallcaps} is not just a department.
[IT]{.smallcaps} is a competency that we need to gain as an entire
company. And I know that if we can reforge ourselves into a great team,
where we can all trust one another, we can succeed."
He then says, "Are you guys willing to do what it takes to help create a
team where we can all trust one another?"
Steve looks around the table. I see that everyone is looking back at him
with rapt attention.
The silence lengthens uncomfortably.
Chris is the first to speak. "I'm in. Working in a screwed up team
sucks, so if you're offering to help fix it, I'm all for it."
I see Patty and Wes also nodding, and then everyone turns to look at me.
[]{#22-ch19.xhtml}
::: {}
# Chapter 19 {.ch-title}
## • Tuesday, September 23 {.dateline}
*At last, I nod, too.*
Patty says, "You know, Bill, I think you've done a fantastic job in the
past couple of weeks. And I'm sorry for how I reacted when you quit.
I've seen such a difference in how the entire [IT]{.smallcaps}
organization works. This is an organization that has resisted adopting
any sort of process and had real problems with trust between
departments. It's amazing to see, and I give most of the credit to you."
"I'm with her. I suppose I'm glad you're back, too, you big quitter,"
Wes laughs loudly. "Whatever I might have said on that first day, I
don't want your job. We need you here."
Embarrassed, I just smile, acknowledging their remarks but not wanting
them to blather on, saying, "Okay. Thanks, guys."
Steve nods, watching our interaction. At last, he says, "Let's go around
the table and have each of you share something from your personal
history. Where were you born? How many siblings did you have and where
did you fit in? What childhood events helped form you as an adult?"
Steve continues, "The goal of this exercise is to get to know one
another as people. You've learned a bit about me and my vulnerabilities.
But that's not enough. We need to know more about one another. And that
creates the basis for trust."
He looks around. "Who wants to go first?"
Oh, shit.
Marines don't like this kind of touchy-feely stuff. I immediately avert
my eyes, not wanting to be called on first.
Much to my relief, Chris volunteers.
He starts off, "I was born in Beirut as the youngest of three children.
Before the age of eighteen, I had lived in eight different countries. As
a result, I speak four languages."
Chris tells us about how he and his wife tried for five years to have
children, the agony of having to administer the fertility treatment
injections to her, and just not being able to go through it a third
time.
Then he tells about the miracle of having identical twin boys, only to
have complications, and having to stay with his wife in the intensive
care unit for three months after they were born prematurely. And
spending night after night, praying that they would be okay, and not
wanting one twin to live his life without the other when they were
destined to be able to understand each other in a way that no other
person in the world could.
And how this experience taught him how selfish he was and his newfound
desire to be unselfish.
To my surprise, I blink back tears, seeing Chris' earnest aspirations
for his kids' future. I furtively notice others doing the same.
"Thank you for sharing, Chris," says Steve solemnly after a moment and
then looks around the room. "Who's next?"
To my surprise and relief, Wes goes next.
I learn that he's been engaged three times in his life, and at the last
minute, called off each one. And when he finally does get married, he
quickly got divorced because she was tired of his maniacal car racing
habit.
How can a guy who weighs nearly 250 pounds race cars?
Wes has four cars, and even if he weren't a Parts Unlimited employee, he
would be one of our most fanatic customers. He spends most of his
off-hours working on his Mazda Miata and old Audi that he races
competitively almost every weekend. Apparently, he's struggled with a
life-long battle to lose weight, even as a young child. He talked about
being the outcast.
He still battles his weight. Not to make friends or for his health, but
to try to keep up with the skinny Asian teenage car racers half his age,
even going to weight-loss camp. Twice.
There is a long silence.
I'm too nervous to laugh.
Steve finally says, "Thanks for sharing, Wes. Who's next?"
I purse my lips together and am again relieved when Patty raises her
hand.
We learn that she was actually an art major. She's one of those people
I've made fun of all my life? But she seems so reasonable!
She tells us what it's like growing up being the "smart girl with big
boobs and glasses," trying to decide what to do in life. She switched
majors five times in college, dropping out to become a singer-songwriter
in Athens, Georgia, spending two years touring clubs around the country
with her band. She went back to get her [MFA]{.smallcaps} but after
confronting the potential poverty of making a living as an artist,
applied to work at Parts Unlimited. She almost didn't get the job
because of a civil disobedience arrest that was still on her record.
When Patty stops talking, Steve thanks her. And then smiling at my
discomfort, he says, "Thank you. That leaves you, Bill..."
------------------------------------------------------------------------
*Even though I've known this moment is coming,* the room seems to fade
out.
I hate talking about myself. In the Marines, I was able to create a
persona where I could just yell at people and tell them what needed to
be done. I got paid to keep my people alive by being slightly smarter
than they were and having great vocal cords.
I do not share my feelings with work colleagues.
Or with almost anyone, for that matter.
I look at the notepad in front of me, where I've been writing down ideas
of what to share. All I see is nervous doodling.
The silence is nearly absolute, with everyone now looking at me
expectantly. Not impatiently, I see. Instead, they seem patient and
kind.
I see Patty's expression turn sympathetic.
I purse my lips together for a moment, and then just blurt out, "What
influenced me most? When I realized that my mom did everything for us,
and that my dad was completely undependable. He was an alcoholic and
when things weren't going well, all my brothers and sisters hid from
him. But it got to a point where I finally had enough and ran away. And
I left them behind. And my youngest sister was only eight years old."
I keep going, "You know, getting arrested was one of the best things
that ever happened to me. The alternative was having to go home. So
instead, I joined the Marines. That introduced me to an entirely new
world, where I learned that there was a totally different way of living
your life. It taught me that you could be rewarded by doing things right
and taking care of your fellow soldiers.
"What did I learn? That my main goal is to be a great father, not like
the shitty father I had. I want to be the man that my sons deserve." I
feel tears starting to fall down my cheeks, which I wipe away, angry
that my body is betraying me.
"That good enough for you, Steve?" I say with a lot more anger than I
had intended.
Steve nods with a half smile, saying slowly, "Thank you, Bill. I know
that was as difficult for you as it was for all of us."
I exhale slowly. And breathe deeply one more time, trying to regain some
equilibrium that I hadn't realized I'd lost.
The uncomfortable silence goes on.
"I know this isn't my place to say, Bill," Wes says slowly. "But, I'm
pretty sure your dad would be incredibly proud of you. And he would
realize what a total piece of shit he was, compared to you."
I hear laughter around the table, and Patty says quietly, "I agree with
Wes. Those kids of yours are luckier than they'll ever know."
Wes grunts in agreement, and Chris nods at me. And I find myself crying
for the first time in over thirty years.
------------------------------------------------------------------------
*Embarrassed, I pull myself together* and look up at everyone.
I'm relieved to see everyone shifting mental gears and turning their
attention back to Steve, who looks around the room.
"First, I'd like to thank all of you for giving of yourself and doing
that exercise with me," he says. "Although it's nice to get to know each
of you better, I wouldn't do this if I didn't think it was important.
Solving any complex business problem requires teamwork, and teamwork
requires trust. Lencioni teaches that showing vulnerability helps create
a foundation for that.
"I know it's unrealistic to think we're going to leave this meeting
knowing exactly what we need to do, with priorities and owners
assigned," he continues. "But I would like to have a joint vision as we
move toward a solution."
Steve puts both hands in front of him, and says, "Just to get the ball
rolling, I'd like to propose that one of our main problems is that we
blow every commitment and schedule that we make. People outside of
[IT]{.smallcaps} are always grumbling that we miss whatever expectations
we set. By a mile.
"Which makes me think," he says, looking around the room, "that we're
probably not good at making internal commitments to one another here
within [IT]{.smallcaps}. Thoughts?"
Uncomfortable silence.
"Look, I don't want to split hairs," Chris finally says defensively.
"But if you look at the actual metrics, my group has delivered almost
every major project on time. We make our dates."
"Yeah, just like you hit the Phoenix date, right?" Wes says, jeering.
"Now that was a huge success. I heard Steve was really proud of your
performance last week."
Chris turns red, raising both hands in front of him. "That's not what I
meant." He thinks for a moment, adding, "It was a total disaster. But,
technically, we did hit the date."
Interesting.
"If that's true," I say, digging in, "there's something really wrong
with our definition of what a 'completed project' is. If it means 'Did
Chris get all his Phoenix tasks done?' then it was a success. But if we
wanted Phoenix in production that fulfilled the business goals, without
setting the entire business on fire, we should call it a total failure."
"Let's stop pussyfooting here," Steve interrupts. "I've told Sarah that
Phoenix was one of the worst executed projects in the history of our
company. What's a better definition of success?"
Thinking for a moment, I finally say, "I don't know. But this is a
recurring pattern. Chris' group never factors in all the work that
Operations needs to do. And even when they do, they use up all the time
in the schedule, leaving none for us. And we're always left cleaning up
the mess, long afterward."
Chris nods understandingly. "Well, you and I are fixing some of this.
Part of it is a planning and architecture issue, which you and I have
talked about fixing. But you're underestimating how much of a bottleneck
your group is. We've got a bunch of other applications that need to be
deployed, but because your team is tied up, all the other deployments
waiting in line get delayed as well."
He adds, "On any given week, we've got five or six application groups
waiting in line for your group to deploy something or another. And when
anything goes wrong, everything gets stacked up. No offense, but when
you guys are late, it's like an airport that closes down. Before you
know it, you have a bunch of airplanes circling, all waiting to land."
Wes grumbles loudly, "Yeah, well, that's what happens when the airplane
you've built crash lands, totally destroying the runway."
Then Wes raises a placating hand. "Look, I'm not blaming you, Chris. I'm
just stating a well-known fact. When deployments don't go as planned,
whether the plan was written by your group or mine, it affects everybody
else. That's all I'm saying."
I nod, agreeing with Wes' characterization. And surprisingly, Chris is
nodding, as well.
I reply, "Erik has helped me understand that there are four types of
[IT]{.smallcaps} Operations work: business projects, [IT]{.smallcaps}
Operations projects, changes, and unplanned work. But, we're only
talking about the first type of work, and the unplanned work that get's
created when we do it wrong. We're only talking about half the work we
do in [IT]{.smallcaps} Operations."
I turn to look at Steve, saying, "I showed you our project list. On top
of the thirty-five business projects, we've got another seventy-five or
so Ops projects we're working. We've got a backlog of thousands of
changes that apparently all need to execute for some reason or another.
On top of that, we have an ever increasing amount of unplanned work,
mostly caused by all our fragile applications breaking, which includes
Phoenix."
I say flatly, "We are way over capacity, given the amount of work in
front of us. And we haven't even counted properly the big audit finding
remediation project yet, which Steve says is still top-priority."
I see the understanding start to dawn on Steve and Chris.
Speaking of which...
I look around, puzzled. "Hey, where's John? If we're talking about
compliance, shouldn't he be here, too? And isn't he a part of the
[IT]{.smallcaps} leadership team as well?"
Wes groans softly, rolling his eyes, saying, "Oh, great, that's just who
we need."
Steve looks startled. He looks at the index card he was holding earlier.
Then he runs his finger down a printed calendar in front of him. "Shit.
I forgot to invite him."
Chris mutters, "Well, we were getting so much done. It was probably a
blessing in disguise, right?"
There's more uncomfortable laughter, but people seem embarrassed that
we're making fun of John without him here.
"No, no, no, that's not what I meant," Steve says quickly, looking most
embarrassed of all. "Bill is right---we need him here. Everyone, let's
take a fifteen-minute break. I'm going to have Stacy track him down."
I decide to take a walk to clear my head.
------------------------------------------------------------------------
*When I return in ten minutes,* I see the strewn remains of a corporate
meeting in progress: Styrofoam cups half-filled with coffee, plates of
leftover food, crumpled up napkins.
Across the room, Patty and Wes are having an animated discussion with
Chris. At the other end of the table, Steve is talking on his cell phone
with someone, while Erik looks at the pictures of automotive parts
hanging on the wall.
I'm considering joining Patty and Wes when I see John walk in the room.
Underneath his arm, of course, is the black three-ring binder.
"Stacy said you were looking for me, Steve?" he said. He makes a point
of looking around slowly at the evidence of a meeting started without
him long ago. "Did I miss a meeting notice? Or did I just get left out
from yet another one?"
As almost everyone goes to extraordinary lengths to avoid eye contact
with him, he says even more loudly, "Hey, it smells like people just had
sex in here. Did I miss anything good?"
Chris, Patty, and Wes break off their conversation, and with exaggerated
nonchalance, grab their original seats.
"Ah, good, you're here. I'm glad you could make it," says Steve,
appearing completely unfazed. "Please grab a seat. Everyone, let's get
started again."
"John, my apologies for not sending you an invite. It's completely my
fault," Steve says, as he makes his way to the head of the table. "I
organized this meeting yesterday at the last minute, right after the
audit committee meeting. After recognizing my part in making all the
[IT]{.smallcaps} problems worse, I wanted to assemble the
[IT]{.smallcaps} leadership team to see if we could agree on a general
direction of the solution to the issues we're having around projects,
operational stability, and compliance."
John looks at me questioningly, lifting an eyebrow.
I'm curious at Steve's omission of the vulnerability exercise and all
that. Probably he figured if he can't redo it, he might as well not even
bring it up.
I nod reassuringly at John.
Steve turns to me. "Bill, please continue."
"When you brought up the word commitment, it reminded me of something
Erik asked me last week that stuck with me," I say. "He asked on what
basis do we decide whether we can accept a new project. When I said that
I didn't know, he took me on another tour of [MRP]{.smallcaps}-8
manufacturing plant. He took me to Allie, the Manufacturing Resource
Planning Coordinator, and asked her how she decides on whether to accept
a new order."
I flip back to my notes. "She said that she would first look at the
order and then look at the bill of materials and routings. Based on
that, she would look at the loadings of the relevant work centers in the
plant and then decide whether accepting the order would jeopardize any
existing commitments.
"Erik asked me how we made the same type of decision in
[IT]{.smallcaps}," I recall. "I told him then, and I'll tell you now, I
don't know. I'm pretty sure we don't do any sort of analysis of capacity
and demand before we accept work. Which means we're always scrambling,
having to take shortcuts, which means more fragile applications in
production. Which means more unplanned work and firefighting in the
future. So, around and around we go."
To my surprise, Erik interrupts. "Well put, Bill. You've just described
'technical debt' that is not being paid down. It comes from taking
shortcuts, which may make sense in the short-term. But like financial
debt, the compounding interest costs grow over time. If an organization
doesn't pay down its technical debt, every calorie in the organization
can be spent just paying interest, in the form of unplanned work."
"As you know, unplanned work is not free," he continues. "Quite the
opposite. It's very expensive, because unplanned work comes at the
expense of..."
He looks around professorially for an answer.
Wes finally speaks up, "Planned work?"
"Precisely!" Erik says jovially. "Yes, that's exactly right, Chester.
Bill mentioned the four types of work: business projects,
[IT]{.smallcaps} Operations projects, changes, and unplanned work. Left
unchecked, technical debt will ensure that the only work that gets done
is unplanned work!"
"That sure sounds like us," Wes says nodding. He then looks firmly at
Erik, saying, "And it's Wes, not Chester. I'm Wes."
"Yes, I'm sure you are," Erik says agreeably.
He addresses the rest of the room. "Unplanned work has another side
effect. When you spend all your time firefighting, there's little time
or energy left for planning. When all you do is react, there's not
enough time to do the hard mental work of figuring out whether you can
accept new work. So, more projects are crammed onto the plate, with
fewer cycles available to each one, which means more bad multitasking,
more escalations from poor code, which mean more shortcuts. As Bill
said, 'around and around we go.' It's the [IT]{.smallcaps} capacity
death spiral."
I smile to myself at Erik mangling Wes' name. I'm not sure what kind of
mental game he's playing, but it's amusing to watch.
Uncertain, I ask Steve, "Are we even allowed to say no? Every time I've
asked you to prioritize or defer work on a project, you've bitten my
head off. When everyone is conditioned to believe that no isn't an
acceptable answer, we all just became compliant order takers, blindly
marching down a doomed path. I wonder if this is what happened to my
predecessors, too."
Wes and Patty nod slightly.
Even Chris nods.
"Of course you can say no!" Steve replies heatedly, with a look of
genuine irritation on his face. He then takes a deep breath before
saying, "Let me be clear. I need you to say no! We cannot afford to have
this leadership team be order takers. We pay you to *think*, not just
*do!*"
Steve looks increasingly angry, saying, "What's at stake here is the
survival of the company! The outcomes of these projects dictate whether
this entire company succeeds or fails!"
He looks right at me. "If you, or for that matter, anyone knows that a
project will fail, I need you to say so. And I need it backed up with
data. Give me data like that plant coordinator showed you, so we can
understand why. Sorry, Bill, I like you a lot, but saying no just based
on your gut is not enough."
Erik snorts and mutters, "That's some pretty nice, soaring rhetoric,
Steve. Very moving. But you know what your problem is? You guys in the
business are punch drunk on projects, taking on new work that doesn't
have a prayer of succeeding. Why? Because you have no idea what capacity
you actually have. You're like the guy who is always writing checks that
bounce, because you don't know how much money you have and never bother
opening your mail.
"Let me tell you a story," he says. "Let me tell you about what that
[MRP]{.smallcaps}-8 plant was like before I arrived. Those poor bastards
would get these manila envelopes that would just show up, containing all
sorts of crazy orders. The business would make absurd commitments to
ship something at some impossible date, oblivious to all the work
already in the system."
He continues, "It was a nightmare everyday. They had inventory piled up
to the ceiling. And was there a systematic way to get [WIP]{.smallcaps}
through the plant? Hell, no! What got worked on was based on who yelled
the loudest or most often, who could engineer the best side deals with
the expediters, or who could get the ear of the highest ranking
executive."
Erik is as animated as I've ever seen him. "We started restoring sanity
when we figured out where our constraint was. Then we protected it,
making sure that time on the constraint was never wasted. And we did
everything to make sure work flowed through it."
Erik then grows still and merely says, "To fix your problem, you need to
do a lot more than just learning how to say no. That's the tip of the
iceberg."
We all look at him, waiting for him to keep going. But instead, he
stands up, walks to his suitcase, and opens it, revealing a jumble of
clothes, a snorkel, a garbage bag, and boxer shorts.
He starts digging, takes out a granola bar, closes the suitcase, and
returns to the table.
We all watch as he opens up the granola bar package and starts eating
it.
Steve, looking as mystified as the rest of us, eventually says, "Erik,
that's an intriguing story. Please keep going."
Erik sighs. "No, that's all I intended to say. If you can't figure out
from that what you need to do, then there's really not much hope for any
of you."
Steve slaps the table, exasperated.
But my mind is racing.
What we need to do isn't merely to prioritize better. I've already
learned what the priorities are, however inconvenient: Phoenix. Making
the audit findings go away. All while keeping everything running.
We think we know where the constraint is. It's Brent. Brent, Brent,
Brent. And we've already taken steps to protect Brent from unplanned
work.
I know I can't hire more resources.
I also know that the workload in my organization is totally out of
control.
No amount of heroics on my part can make a big dent in the tidal wave of
work that's been allowed to get into the system. Because no one ever
said no.
Our mistakes were made long before it came to me. The mistakes were made
by accepting the project and all the resulting shortcuts that Chris had
to make before it reached me.
How can we reverse this insanity?
Then a strange idea hits me.
I think about it for another moment. It sounds utterly absurd, yet I
can't find any flaws in the logic.
I say, "Steve, I have an idea. But please let me finish telling you the
entire idea before you react."
And I tell them what I'm thinking.
------------------------------------------------------------------------
*Steve is the first to speak.* "You must be out of your right mind,"
Steve says, his initial disbelief turning into exasperation. "You want
to just stop doing work? Who do you think we are? Subsidized potato
farmers paid not to grow crops?"
But before I can respond, John speaks up. "I agree. Your idea seems like
exactly the wrong thing to do. We've got a burning platform right now to
finally do the right thing. We need to strike while the iron is hot.
This is a perfect storm for us to finally get the budget we need to not
only do the right things, but do the right things right."
He starts rattling off the points on his fingers, "We've got the audit
finding that has board visibility, the high-visibility project that
can't fail, and an operational failure that can't happen again, either.
We should pour on the gas and put in the security controls we need, once
and for all."
Wes interjects, chortling to John, "I'm stunned! I thought you would
love Bill's idea. I mean, you love stopping things from getting done and
saying no, right? This should be like a dream come true for you!"
John turns bright red, obviously preparing a scathing reply. But Wes
puts his big, meaty hand on his shoulder, and says with a smile, "Hey,
I'm just kidding, okay? Just making a joke."
Everyone starts talking at once when Erik suddenly stands up, crumples
his granola bar wrapper, and throws it across the room into the
wastebasket, missing it completely. He leans back in his chair, saying,
"Bill, I think your proposal is very astute."
Looking at John, he continues, "Remember, Jimmy, the goal is to increase
the throughput of the entire system, not just increase the number of
tasks being done. And if you don't have a trustworthy system of work,
why should I trust your system of security controls? Bah. A total waste
of time."
John looks back at Erik, puzzled. "What?"
Erik sighs and rolls his eyes. Instead of responding to John, he turns
his gaze to Steve. "You've been a plant manager. Think of it as freezing
materials release until enough [WIP]{.smallcaps} completes and leaves
the plant. In order to control this system, we need to reduce the number
of moving parts."
When Steve doesn't appear convinced, Erik leans way forward in his chair
and asks him pointedly, "Suppose you're managing the [MRP]{.smallcaps}-8
plant, and you have inventory piled to the ceiling. What would happen if
you stopped releasing jobs and materials onto the plant floor?"
Surprised to be the target of the question, Steve considers it for a
moment. "The amount of [WIP]{.smallcaps} in the plant goes down, because
work will start leaving the plant as finished goods."
"Correct," Erik says, nodding approvingly. "And what will likely happen
to due-date performance?"
"Due-date performance goes up, because [WIP]{.smallcaps} went down."
Steve says, looking increasingly suspicious and reluctant about where
Erik might be leading him.
"Yes, very good," Erik says encouragingly. "But on the other hand, what
happens to inventory levels if you allow the plant to continue to accept
orders and release new jobs?"
He says after a moment, "[WIP]{.smallcaps} goes up."
"Excellent," Erik says. "And what happens to due-date performance?"
Steve looks like he's just swallowed something that isn't agreeing with
him, and he says eventually, "Everyone knows that in manufacturing, as
[WIP]{.smallcaps} increases, due-date performance goes down.
"Wait a minute, here," he says, squinting at Erik. "You're not actually
suggesting that this applies to [IT]{.smallcaps}, too? That by halting
all work except for Phoenix, we'll reduce the amount of
[WIP]{.smallcaps} in [IT]{.smallcaps}, and that this will somehow
improve due-date performance? Is that seriously what you're suggesting?"
Erik leans back in his chair looking pleased with himself. "Yes."
Wes says, "Won't that leave most of us just twiddling our thumbs with
nothing to do? That's 130 people in [IT]{.smallcaps} Operations just
sitting around. Doesn't that sound a bit...wasteful?"
Erik scoffs and says, "I'll tell you about wasteful. How about over a
thousand changes stuck in the system, with no apparent way of ever
getting them completed?"
Wes frowns. Then he nods, saying, "That's true. The number of cards on
Patty's change board keeps going up. If that's work in process, it's
definitely spiraling out of control. We're probably only a couple weeks
away from having those cards stacked to the ceiling, too."
I nod. He's right.
The idea is for [IT]{.smallcaps} Operations and Development to not
accept any new projects for two weeks and to stop all work in
[IT]{.smallcaps} Operations except for work related to Phoenix.
I look around. "If we single-task on the most important project for two
weeks and still aren't able to make a big dent, then I think we should
all find new day jobs."
Chris nods. "I think we should give it a shot. We'll keep working on the
other active projects, but we'll freeze all deployment work except
Phoenix. From Bill's perspective, it will look like that's the only
thing we're working on. Make no mistake, Phoenix will be everyone's top
priority."
Patty and Wes nod in agreement.
John crosses his arms. "I'm not sure if I can support this insane
proposal. First, I've never seen any organization do anything even
remotely like this before. Second, I'm very concerned that if we do
this, we'll lose our shot at getting all the audit issues fixed. As
Steve has already said, those audit findings could kill the company,
too."
"You know what your problem is?" Erik says, pointing a finger at John.
"You never see the end-to-end business process, so I guarantee you that
many of the controls you want to put in aren't even necessary."
John says, "What?"
Again, Erik waves John's question away. "Don't worry about it for now.
Let the inevitable happen, and we'll see what we can learn from it."
Steve turns to John. "I understand your concerns about security. But the
biggest risk to the company is not the unresolved audit findings. The
biggest risk to the company is that we don't survive. We need Phoenix to
regain competitive parity."
He pauses and says, "Let's give this project freeze one week and see if
it makes a difference in the Phoenix work. If we don't, we'll put the
remediation work back on the front burner. Okay?"
John nods reluctantly. He then flips to a page in his three-ring binder,
and makes some notes. He's probably recording Steve's promise.
"Steve, we definitely need your help to make this happen," I say. "My
guys are routinely strong-armed into doing pet projects by almost every
manager in this company. I think we need an e-mail from you to the
entire company, not only explaining why you're doing this, but what the
consequences will be if someone tries to put unauthorized work into the
system."
Erik makes an encouraging noise.
"No problem," Steve quickly replies. "I'll send you all a draft after
this meeting. Revise it and I'll send it out to all the company
managers. Good enough for you?"
Trying to keep the disbelief out of my voice, I say, "Yes."
It's astonishing what we agree to in the next hour. [IT]{.smallcaps}
Operations will freeze all non-Phoenix work. Development can't idle the
twenty-plus non-Phoenix projects, but will freeze all deployments. In
other words, no work will flow from Development to [IT]{.smallcaps}
Operations for another two weeks.
Furthermore, we will identify the top areas of technical debt, which
Development will tackle to decrease the unplanned work being created by
problematic applications in production.
This will all make a huge difference in my team's workload.
Furthermore, Chris and Kirsten will review all Phoenix tasks not being
worked, and steal resources from other projects to get them in work
again.
Everyone seems energized and excited to put the plan into place---even
John.
Before we all leave, Steve says, "Thank you all for your good thinking
today and for sharing something about yourself. I feel like I know all
of you better now. And, as unbelievable as I think Bill's crazy project
freeze idea is, I think it could work. I look forward to this being the
first of many great decisions this team will make.
"As I said, one of my goals is that we create a team where we can all
trust one another," he continues. "Hopefully, we made a small step in
that direction, and I encourage you to keep demanding honest and
truthful communications between you."
He looks around the room and asks, "Is there anything that you guys need
from me in the meantime?"
There are no requests, so we adjourn.
As we all get up to leave, Erik says loudly, "Great work, Bill. Couldn't
have done it better myself."
:::
[]{#23-ch20.xhtml}
# Chapter 20 {.ch-title}
## • Friday, September 26 {.dateline}
*Three days later,* I'm at my desk, trying to read a report on Phoenix
progress from Kirsten on my laptop. As it whirs and wheezes, I wonder
how many weeks it's been since John's security patch bricked my laptop.
Getting replacement laptops is like a lottery. It's tempting to bribe
one of the service desk people, as one of the Marketing managers
suggested, but I refuse to jump the queue. I have to keep playing by the
rules since I'm the person responsible for making and enforcing them. I
make a note to talk with Patty about our urgent need to reduce lead
times on these laptop replacements.
Finally, the e-mail comes up:
::: block
From: Kirsten Fingle
To: Steve Masters,
Cc: Bill Palmer, Chris Allers, Sarah Moulton
Date: September 26, 10:33 [AM]{.smallcaps}
Subject: Great news on project front!
Steve,
We are finally making headway. The project freeze and the resulting
[IT]{.smallcaps} focus on Phoenix has broken the logjam. We've
accomplished more in the previous seven days that we typically get done
in an entire month.
Kudos to everyone on the team!
On a side note: many project sponsors are very frustrated about their
projects being put on hold. In particular, Sarah Moulton believes that
her projects are exempt from the freeze. I referred her to you.
Attached is the formal status report. Please let me know if you have any
questions.
Kirsten
:::
Although the note about Sarah making trouble again makes my jaw clench,
this is absolutely fantastic news.
We were expecting it, but the good news is welcome, nonetheless,
especially after earlier in the week. We had a big setback because of a
Sev 1 incident that took out all the internal phone and voicemail
systems, bringing Sales and Manufacturing to its knees on the last day
of the quarter.
Two hours into the outage, we discovered it was caused by one of our
networking vendors who accidentally made a change to our production
phone system instead of the hot spare.
The outage will impact our quarterly revenue, but we don't know how much
yet. In order to prevent this from happening again, we're putting
together a project to monitor our critical systems for unauthorized
changes.
This monitoring project is what Wes, Patty, and John are talking about,
huddled around Patty's conference table.
I say, "Sorry to interrupt, but I wanted to share the good news." I show
them Kirsten's e-mail.
Wes leans back and says, "Well, that makes it official. Your project
freeze is actually working."
Patty looks over at him, appearing surprised. "You actually doubted it?
Come on, we've both been talking about how we've never seen people so
focused before. It's amazing how the project freeze has reduced the
priority conflicts and bad multitasking. We know it's made a huge
difference in productivity."
Wes shrugs then smiles. "Until Kirsten gives us credit, it's all just in
our heads."
He's got a point. It really is great to have Kirsten acknowledge the
progress we're making.
"By the way," Patty says, "She's is not kidding about the business
managers freaking out. I've had more and more [VP]{.smallcaps}s calling
me, demanding a waiver for their various pet projects or asking to get
some work done off the books. It's not just Sarah---she's just the most
blatant and vocal."
I frown. "Okay, that's part of our job and we expected this. But, I
don't want this kind of pressure being applied to any of our people.
Wes?"
"I've told everyone on my team that they're to route any complaints to
me. And trust me, I call each of those guys back and give them an
earful," he says.
Patty says, "I'm already getting anxious about what we do after we lift
the project freeze. Won't that be like opening up the floodgates?"
Once again, she has put her finger on something important. I say, "I'll
call Erik, but before I do, how do we currently prioritize our work?
When we commit to work on a project, a change, a service request, or
anything else, how does anyone decide what to work on at any given time?
What happens if there are competing priorities?"
"That happens every freaking day!" says Wes, looking incredulous.
"That's what's so great about freezing all the projects except for one.
No one has to decide what they're working on. No multitasking allowed."
"That's not my question," I say. "When we have multiple streams of work
going on simultaneously, how does anyone decide what needs to get worked
on at any given time?"
"Well," Wes says, "we trust them to make the right decision, based on
the data they have. That's why we hire smart people."
This is not good.
Recalling my twenty minutes observing Brent before the project freeze, I
ask, "And on what data do all our smart people base their prioritization
decisions?"
Wes says defensively, "We all try to juggle the competing priorities as
best as we can. That's life, right? Priorities change."
"Let's be honest," Patty says. "Priority 1 is whoever is yelling the
loudest, with the tie-breaker being who can escalate to the most senior
executive. Except when they're more subtle. I've seen a bunch of my
staff always prioritizing a certain manager's requests, because he takes
them out to lunch once a month."
Oh, great. In addition to some engineers being bullied, I have other
engineers who are like Corporal Max Klinger from *M\*A\*S\*H*, running
their own black market of [IT]{.smallcaps} work.
"If this is true, there's no way we can lift the project freeze. Don't
you see that we don't have any way of releasing work into
[IT]{.smallcaps} and be able to trust that it will get worked on?"
Trying to keep the resignation out of my voice, I say, "Patty is right.
We have a lot to figure out before the project freeze ends. Which is in
exactly one week."
------------------------------------------------------------------------
*I decide to take a quick walk outside.* I have thirty minutes before my
next meeting, and I need to think.
I'm more unsettled than ever. When we have more than one project in the
system at the same time, how do we protect the work from being
interrupted or having its priority trumped by almost anyone in the
business or someone else in [IT]{.smallcaps}?
The sun shines down on me. It's 11 a.m., and the air smells like autumn.
The leaves on the trees are starting to turn orange and brown, and there
are piles of them starting to form in the parking lot.
Despite my fretting, I realize how refreshing it is to be able to think
about what work we need to be doing and how to prioritize and release
it. For a moment, I marvel at the lack of constant firefighting that
dominated so much of my career in [IT]{.smallcaps}.
The types of issues we're having to solve lately are so...cerebral.
It's what I thought management was all about when I got my
[MBA]{.smallcaps}.
I'm convinced that if we do a good job thinking, we can make a real
difference. In that moment, I decide to call Erik.
"Hello?" I hear him say.
"Hi, it's Bill. Do you have a couple of minutes to talk? I have some
questions about the project freeze." I pause, and then add, "Or rather,
what happens after we lift the project freeze."
"Well, it's about time. I was wondering when you'd figure out that you
have a huge, new problem on your hands."
I quickly fill him in on the good news from Kirsten. I outline the
problems we've stumbled upon while we consider the monitoring project
and how we protect work in the system.
"Not bad, junior!" Erik says. "You've obviously put our discussion about
constraints into practice and are doing everything you can to protect
that constraint from being hit by unplanned work. You're asking some
very important questions about the First Way and how you manage your
flow of planned work. Until you can do that, you can't really manage
much of anything, can you?
"You're confused because you're realizing you don't know how work is
actually worked," he continues.
I suppress an irritated sigh.
"I think it's time for another trip to [MRP]{.smallcaps}-8. How soon can
you get there?" he asks.
Surprised, I ask, "You're in town?"
"Yep" he says. "There's a meeting with the auditors and the finance guys
this afternoon that I wouldn't miss for the world. Make sure you're
there for it. We're going to make John's head fall off."
I tell him that I can be at [MRP]{.smallcaps}-8 in fifteen minutes.
------------------------------------------------------------------------
*Erik's in the middle of the lobby waiting for me.*
I do a double take. He's wearing a faded T-shirt and a zippered, hooded
sweatshirt with a faded union logo. He already has a visitor badge and
is tapping his foot impatiently.
"I came as fast as I could." I say.
Erik merely grunts and gestures for me to follow him. Again, we climb
the staircase and stand on the catwalk overlooking the plant floor.
"So tell me what you see," he says, gesturing toward the plant floor.
I look down, confused, not knowing what he wants to hear. Starting with
the obvious, I say, "Like last time, I see raw materials coming in from
the loading docks on the left. And on the right, I see finished goods
leaving the other set of loading docks."
Surprisingly, Erik nods approvingly. "Good. And in between?"
I look down at the scene. Part of me feels foolish, afraid of looking
like the Karate Kid being quizzed by Mr. Miyagi. But I asked for this
meeting, so I just start talking. "I see materials and work in process,
flowing from left to right---but, obviously, moving very slowly."
Erik peers over the catwalk, and says, "Oh, really? Like some sort of
river?"
He turns to me, shaking his head with disgust, "What do you think this
is, some sort of poetry reading class? Suddenly, [WIP]{.smallcaps} is
like water running over smooth stones? Get serious. How would a plant
manager answer the question? From where to where does the work go, and
why?"
Trying again, I say, "Okay, okay. [WIP]{.smallcaps} goes from work
center to work center, as dictated by the bill of materials and
routings. And all that is in the job order, which was released at that
desk over there."
"That's better," Erik says. "And can you find the work centers where the
plant constraints are?"
I know that Erik had told me on that first odd trip to this plant.
"The heat treat ovens and paint curing booths," I say suddenly.
"There," I say, after scanning the plant floor and finally spotting a
set of large machines by the far wall. "And there," I say, pointing at
the large rooms with signs saying, "Paint Booth
#30-[a]{.smallcaps}["]{.smallcaps} and "Paint Booth
#30-[b]{.smallcaps}."
"Good. Understanding the flow of work is key to achieving the First
Way," Erik says, nodding. More sternly, he asks, "So now, tell me again
which work centers you've determined to be the constraints in your
organization?"
I smile, answering easily, "Brent. We talked about that before."
He scoffs, turning back to look at the plant floor.
"What?" I nearly shout. "How can it not be Brent? You even congratulated
me when I told you it was Brent a couple of weeks ago!"
"Suddenly Brent is a robotic heat treat oven? You're telling me your
equivalent of that paint curing booth down there is Brent?" he says with
mock disbelief. "You know, that might be the dumbest thing I've ever
heard."
He continues, "So, where would that leave your two managers, Chester and
Penelope? Let me guess. Maybe they're equivalent to that drill press
station and that stamping machine over there? Or maybe it's that metal
grinder?"
Erik looks sternly at me, "Get serious. I asked you what work centers
are your constraints. Think."
Completely confused, I look back down at the plant floor.
I know that part of the answer is Brent. But when I blurt it out so
confidently, Erik all but smacks me on the head. Again.
Erik seems aggravated that I named an actual person, suggesting that
Brent was a piece of equipment.
I look again at the heat treat oven. And then I see them. There are two
people wearing coveralls, hard hats, and goggles. One is in front of a
computer screen, punching in something, while the other is inspecting a
pile of parts on a loading pallet, scanning something with his handheld
computer.
"Oh," I say, thinking out loud. "The heat treat oven is a work center,
which has workers associated with it. You asked what work centers are
our constraints, and I told you that it was Brent, which can't be right,
because Brent isn't a work center.
"Brent is a worker, not a work center," I say again. "And I'm betting
that Brent is probably a worker supporting way too many work centers.
Which is why he's a constraint."
"Now we're getting somewhere!" Erik says, smiling. Gesturing broadly at
the plant floor below, he says, "Imagine if twenty-five percent of all
the work centers down there could only be operated by one person named
Brent. What would happen to the flow of work?"
I close my eyes to think.
"Work wouldn't complete on time, because Brent can only be at one work
center at a time," I say. Enthusiastically, I continue, "That's exactly
what's happening with us. I know that for a bunch of our planned
changes, work can't even start if Brent isn't on hand. When that
happens, we'll escalate to Brent, telling him to drop whatever he's
doing, so some other work center can get going. We'll be lucky if he can
stay there long enough for the change to be completely implemented
before he's interrupted by someone else."
"Exactly!" he says.
I'm slightly dismayed at the warm feeling of approval that I feel in
response.
"Obviously," he continues, "every work center is made up of four things:
the machine, the man, the method, and the measures. Suppose for the
machine, we select the heat treat oven. The men are the two people
required to execute the predefined steps, and we obviously will need
measures based on the outcomes of executing the steps in the method."
I frown. These factory terms are vaguely familiar from my
[MBA]{.smallcaps} years. But I never thought they'd be relevant in the
[IT]{.smallcaps} domain.
Looking for some way to write this down, I realize I left my clipboard
in my car. I pat my pockets and find a small crumpled index card in my
back pocket.
I hurriedly write down, "Work center: machine, man, method, measure."
Erik continues, "Of course, on this plant floor, you don't have one
quarter of the work centers dependent upon one person. That would be
absurd. Unfortunately for you, you do. That's why when Brent takes a
vacation, all sorts of work will just grind to a halt, because only
Brent knows how to complete certain steps---steps that probably only
Brent even knew existed, right?"
I nod, unable to resist groaning. "You're right. I've heard my managers
complain that if Brent were hit by the proverbial bus, we' d be
completely up the creek. No one knows what's in Brent's head. Which is
one of the reason I've created the level 3 escalation pool."
I quickly explain what I did to prevent escalations to Brent during
outages to keep him from being interrupted by unplanned work and how
I've attempted to do the same thing for planned changes.
"Good," he says. "You're standardizing Brent's work so that other people
can execute it. And because you're finally getting those steps
documented, you're able to enforce some level of consistency and
quality, as well. You're not only reducing the number of work centers
where Brent is required, you're generating documentation that will
enable you to automate some of them."
He continues, "Incidentally, until you do this, no matter how many more
Brents you hire, Brent will always remain your constraint. Anyone you
hire will just end up standing around."
I nod in understanding. This is exactly as Wes described it. Even though
he got the additional headcount to hire more Brents, we never were able
to actually increase our throughput.
I feel a sudden sense of exhilaration as the pieces fall into place in
my head. He's confirming some of my deeply held intuitions and providing
an underpinning theory for why I believe them.
My elation is short-lived. He looks me over disapprovingly, "You're
asking about how to lift the project freeze. Your problem is that you
keep confusing two things. Until you can separate them in your head,
you'll just walk around in circles."
He starts walking and I hurry after him. Soon, we're standing over the
middle of the plant floor.
"You see that work center over there, with the yellow blinking light?"
he asks, pointing.
When I nod, he says, "Tell me what you see."
Wondering what it would take to have a normal conversation with him, I
resume my dumb trainee role. "Some piece of machinery is apparently
down---that's what I'm guessing the blinking light indicates. There are
five people huddled off to the side, including what looks like two
managers. They all look concerned. There are three more people crouched
down, looking into what I'm guessing is the machine inspection panel.
They have flashlights and---yeah---they're also holding
screwdrivers---definitely a machine down..."
"Good guess," he says. "That's probably a computerized grinder that is
out of commission, and the maintenance team is working on getting it
back online. What would happen if every piece of equipment down there
needs Brent to fix it?"
I laugh. "Every outage escalated immediately to Brent."
"Yes." He continues, "Let's start with your first question. Which
projects are safe to release when the project freeze is lifted? Knowing
how work flows through certain work centers and how some work centers
require Brent and some do not, what do you think the answer is?"
I slowly repeat what Erik just recited, trying to piece together the
answer
"I got it," I say, smiling. "The candidate projects which are safe to
release are those that don't require Brent."
I smile even wider when he says, "Bingo. Pretty simple, yes?"
My smile disappears as I think through the implications. "Wait, how do I
know which projects don't require Brent? We never think we actually need
Brent until we're halfway through the work!"
I immediately regret asking the question as Erik glares at me. "I'm
supposed to give you the answer to everything that you're too
disorganized to be able to figure out for yourself?"
"Sorry. I'll figure it out," I say quickly. "You know, I'll be so
relieved when we finally know all the work that actually requires
Brent."
"Damn right," he says. "What you're building is the bill of materials
for all the work that you do in [IT]{.smallcaps} Operations. But instead
of a list of parts and subassemblies, like moldings, screws, and
casters, you're cataloging all the prerequisites of what you need before
you can complete the work---like laptop model numbers, specifications of
user information, the software and licenses needed, their
configurations, version information, the security and capacity and
continuity requirements, yada yada..."
He interrupts himself, saying, "Well, to be more accurate, you're
actually building a bill of resources. That's the bill of materials
along with the list of the required work centers and the routing. Once
you have that, along with the work orders and your resources, you'll
finally be able to get a handle on what your capacity and demand is.
This is what will enable you to finally know whether you can accept new
work and then actually be able to schedule the work."
Amazing. I think I almost get it.
I'm about ask some questions, but Erik says, "Your second question was
whether it was safe to start your monitoring project. You already
established it doesn't require Brent. Furthermore, you say that the goal
of this project is to prevent outages, which prevents Brent escalations.
More than that, when outages do occur, you'll need less of Brent's time
to troubleshoot and fix. You've already identified the constraint,
exploited it to squeeze the most out of it, and then you've subordinated
the flow of work to the constraint. So, how important is this monitoring
project?"
I think for a moment. And then groan at the obvious answer.
I run my fingers through my hair. "You said that we always need to be
looking for ways to elevate the constraint, which means I need to do
whatever is required to get more cycles from Brent. That's exactly what
the monitoring project does!"
I say with some disbelief that I didn't see this before, "The monitoring
project is probably the most important improvement project we have---we
need to start this project right away."
"Precisely," Erik says. "Properly elevating preventive work is at the
heart of programs like Total Productive Maintenance, which has been
embraced by the Lean Community. [TPM]{.smallcaps} insists that we do
whatever it takes to assure machine availability by elevating
maintenance. As one of my senseis would say, 'Improving daily work is
even more important than doing daily work.' The Third Way is all about
ensuring that we're continually putting tension into the system, so that
we're continually reinforcing habits and improving something. Resilience
engineering tells us that we should routinely inject faults into the
system, doing them frequently, to make them less painful.
"Mike Rother says that it almost doesn't matter what you improve, as
long as you're improving something. Why? Because if you are not
improving, entropy guarantees that you are actually getting worse, which
ensures that there is no path to zero errors, zero work-related
accidents, and zero loss."
Suddenly, it's so obvious and evident. I feel like I need to call Patty
right away to tell her to start the monitoring project immediately.
Erik continues, "Rother calls this the Improvement Kata," he continues.
"He used the word *kata*, because he understood that repetition creates
habits, and habits are what enable mastery. Whether you're talking about
sports training, learning a musical instrument, or training in the
Special Forces, nothing is more to mastery than practice and drills.
Studies have shown that practicing five minutes daily is better than
practicing once a week for three hours. And if you want to create a
genuine culture of improvement, you must create those habits."
Turning back to the plant floor, he continues, "Before we leave, turn
your attention from the work centers to all the space *between* the work
centers. Just as important as throttling the release of work is managing
the handoffs. The wait time for a given resource is the percentage that
resource is busy, divided by the percentage that resource is idle. So,
if a resource is fifty percent utilized, the wait time is 50/50, or 1
unit. If the resource is ninety percent utilized, the wait time is
90/10, or nine times longer. And if the resource is ninety-nine percent
utilized?"
Although I'm not quite understanding the relevance, I do the math in my
head: 99/1. I say, "Ninety-nine."
"Correct," he says. "When a resource is ninety-nine percent utilized,
you have to wait ninety-nine times as long as if that resource is fifty
percent utilized."
He gestures expansively, "A critical part of the Second Way is making
wait times visible, so you know when your work spends days sitting in
someone's queue---or worse, when work has to go backward, because it
doesn't have all the parts or requires rework.
"Remember that our goal is to maximize flow. Here at
[MRP]{.smallcaps}-8, we had a situation many years ago where certain
components were never showing up at final assembly on time. Was it
because we didn't have enough resources or because certain tasks were
taking too long?
"No! When we actually followed the parts around on the plant floor, we
found that for the majority of time, the parts were just sitting in
queues. In other words, the 'touch time' was a tiny fraction of 'total
process time.' Our expediters had to search through mountains of work to
find the parts and push them through the work center," he says
incredulously.
"That's happening at your plant, too, so watch for it," he says.
I nod and say, "Erik, I'm still stuck on releasing the monitoring
project. People always insist that their special project is urgent, and
needs to be worked at the expense of everything else. Where do all the
urgent audit and security remediation projects that John is screaming
for fit in?"
Erik looks intently at my face and finally says, "Have you heard a
single word I've been saying in the last two weeks?"
He looks at his watch and says, "Gotta go."
Startled, I watch him as he walks quickly to the catwalk exit. I have to
run to catch him. He's a big guy, probably a little over fifty years
old. Despite the extra pounds he's carrying, he moves fast.
When I catch up to him, I say, "Wait. Are you saying that audit issues
aren't important enough to fix?"
"I *never* said that," he says, stopping in his tracks and turning to
face me. "You screw up something that jeopardizes the business' ability
to maintain compliance with relevant laws and regulations? You better
fix it---or you should be fired."
He turns around and resumes his pace, saying over his shoulder, "Tell
me. All those projects that Jimmy your [CISO]{.smallcaps} is pushing. Do
they increase the flow of project work through the [IT]{.smallcaps}
organization?"
"No," I quickly answer, rushing to catch up again.
"Do they increase operational stability or decrease the time required to
detect and recover from outages or security breaches?"
I think a bit longer. "Probably not. A lot of it is just more busywork,
and in most cases, the work they're asking for is risky and actually
could cause outages."
"Do these projects increase Brent's capacity?"
I laugh humorlessly. "No, the opposite. The audit issues alone could tie
up Brent for the next year."
"And what would doing all of Jimmy's projects do to [WIP]{.smallcaps}
levels?" he asks, opening the door that takes us back into the
stairwell.
Exasperated, I say as we descend the two sets of stairs, "It would go
through the roof. Again."
When we reach the bottom, Erik suddenly stops and asks, "Okay. These
'security' projects decrease your project throughput, which is the
constraint for the entire business. And swamp the most constrained
resource in your organization. And they don't do squat for scalability,
availability, survivability, sustainability, security, supportability,
or the defensibility of the organization."
He asks deadpan, "So, genius: Do Jimmy's projects sound like a good use
of time to you?"
As I start to answer, he just opens the exit door and walks through it.
Apparently, it was a rhetorical question.
[]{#24-ch21.xhtml}
# Chapter 21 {.ch-title}
## • Friday, September 26 {.dateline}
*Despite breaking every speed limit on the way,* I'm twenty minutes late
to the audit meeting in Building 2. When I step into the conference
room, I'm stunned at how packed it is.
It's immediately obvious that this is a high-stakes meeting, fraught
with political nuance. Dick and our corporate counsel are at the head of
the table.
Opposite them are the external auditors who are legally liable for
finding financial reporting errors and fraud, and yet they still want to
keep us as clients.
Dick and his team will try to show that everything the auditors have
found is all a genuine misunderstanding. Their goal is to appear
earnest, but indignant that their precious time is being wasted.
It's all political theater but high-stakes political theater that is
definitely above my pay grade.
Ann and Nancy are also here along with Wes and some other folks who look
familiar.
Then I see John and do a double take.
My God, he looks terrible---like someone on his third day of quitting an
addiction. He looks as if he thinks that the entire room will turn on
him at a moment's notice and tear him to shreds, which may not be that
far from the truth.
Sitting next to John is Erik, who is the picture of composure.
How did he get here so quickly? And where did he change into those khaki
pants and denim shirt? In the car? While he was walking?
As I sit down next to Wes, he leans toward me. He gestures at a stapled
set of papers and whispers, "The agenda for this meeting is to go
through these two material weaknesses and the sixteen significant
deficiencies. There's John, looking like he's in front of the firing
squad, waiting for the bullet."
I see the sweat stains under John's arms, and think to myself, *Good
grief, John. Pull yourself together*. I'm the operational manager where
all those [IT]{.smallcaps} deficiencies reside, so I'm actually the one
on the firing line, not you.
But unlike John, I've had the benefit of having Erik's constant
reassurances that everything will work out.
Then again, Erik doesn't have his ass on the line and for a brief
moment, I wonder whether I should be as nervous as John.
------------------------------------------------------------------------
*Five hours later,* the conference table is covered with marked-up
papers and empty cups of coffee, the room smelling stale and rank from
all the tension and heated arguments.
I look up at the sound of the audit partner closing his briefcase.
He says to Dick, "Given this new data, it does appear that for the two
potential material weaknesses, the [IT]{.smallcaps} controls may indeed
be out of scope and thus can be resolved very quickly. Thank you in
advance for making yourselves available to get us the documentation we
need to close out these issues as expeditiously as possible.
"We will take all this under advisement and send you something in the
next day or two," he continues. "Most likely, we'll want to schedule
further testing of these newly documented downstream controls to make
sure they were in place and operating---to support the financial
statement assertions you're making."
As he stands up, I stare in disbelief at the audit partner. We really
dodged the bullet. Looking around the table, the Parts Unlimited team
looks equally surprised.
One exception is Erik, who just nods approvingly, obviously irritated
that it took so long to finally have the auditors on the run.
The other exception is John. He looks extremely distraught, sitting with
his shoulders slumped over that I'm suddenly concerned about his
well-being.
I'm about to get up to check on John when the audit partner shakes
Dick's hand and, to my surprise, Erik gets up to give him a hug.
"Erik, it's been a long time since [GAIT]{.smallcaps} and Orlando," the
audit partner says warmly. "I was sure our paths would cross again, but
I never would have guessed it would be at a client engagement! What have
you been up to lately?"
Erik laughs and says, "Mostly, happily sailing on my boat. A friend
asked me to join the Parts Unlimited board, partly due to their external
auditors making trouble with a bunch of young, bottom-up auditors who
strayed off the reservation. I should have known you'd be involved."
The audit partner looks genuinely embarrassed, and they huddle together,
whispering.
For the past five hours, John, Wes, and I sat on the sidelines while the
business managers walked the auditors through a precise discussion about
how the [IT]{.smallcaps} control issues simply couldn't lead to an
undetected financial reporting error. They pulled out something called
the "[GAIT]{.smallcaps} Principles" document and cited some of the
enclosed flowcharts.
Like watching a tennis match, the ball went back and forth between our
team and the auditors, using words like "linkage," "significance," and
"controls reliance." On occasion, Dick would trot in a bunch of experts
from the relevant business areas to show that even if someone malicious
managed to cause a failure in the [IT]{.smallcaps} control, the fraud
would still be caught by another control somewhere downstream.
Managers from Materials Management, Order Entry, Treasury, and Human
Resources showed that even if the application, database, operating
system, and firewall were riddled with security holes and thoroughly
compromised, the fraudulent transaction would still be caught by some
daily or weekly inventory reconciliation report.
Over and over again, they went through scenarios that assumed all the
[IT]{.smallcaps} infrastructure was made of Swiss cheese, where any
disgruntled or wrongdoing employee or external, malicious hacker could
log in and commit fraud with impunity.
But they would still detect any material error in the financial
statements.
Once, Dick pointed out that an entire department of twenty people is
responsible for spotting erroneous, let alone fraudulent, orders. They,
and not an [IT]{.smallcaps} control, served as the business safety net.
Each time, the auditors, often reluctantly, agreed that controls
reliance was placed on finance doing reconciliations. And not on the
[IT]{.smallcaps} systems or the [IT]{.smallcaps} controls within.
This was news to me. But I certainly wasn't going to disagree with them.
In fact, if shutting up and staying silent would allow Parts Unlimited
to escape all the audit findings, I'd be happy to drool and pretend to
be unable to read.
"You have a minute to talk?" I hear John say beside me in a scratchy
voice.
He's still slumped over, his head in his hands.
"Sure," I say, looking around at the nearly empty room. It's just John
and me at the large conference table, while Erik continues his whispered
powwow with the audit partner in the far corner.
------------------------------------------------------------------------
*John looks awful.* If his shirt were just a little more wrinkled, and
maybe had a stain or two in front, he could almost pass as a homeless
person.
"John, are you coming down with something? You don't look so hot," I
say.
His expression turns ugly, "Do you know how much political capital I've
spent over the last two years, trying to get everyone to do the right
thing? This organization has been kicking the information security can
down the road for a decade. I put absolutely everything on the line. I
told them the world would end if they didn't go beyond lip-service, and
at least try to fix some of these systemic [IT]{.smallcaps} security
issues... I mean, we need to at least pretend to care."
From the other side of the room, I see Erik turn to look at us. The
audit partner doesn't seem to have heard John. Nevertheless, Erik puts
his arm around him and collegially moves the conversation into the
hallway, closing the door loudly behind him.
Oblivious, John continues, "You know, there are times when I think I'm
the only person in this entire company that actually cares about the
security of our systems and data. Do you know how it feels to have the
entire Dev organization hiding their activities from me, and having to
beg people to tell me where they're meeting? What is this, elementary
school? I'm only trying to help them do their jobs!"
When I don't say anything, he just sneers at me. "Don't look at me like
that. I know you look down at me, Bill."
I look at him with genuine surprise.
"I know you never read my e-mails. I have to call you to even get you to
open them up---I know, because I get the read receipts while we're on
the phone, you asshole."
Ah.
But I've read many of his e-mails without him having to call me first.
However, before I can respond, he barrels forward, "You all look down on
me. You know, I used to manage servers, just like you do. But I found my
calling doing information security. I wanted to help catch bad guys. I
wanted to help organizations protect themselves from people who were out
to get them. It came out of a sense of duty and a desire to make the
world a better place.
"But ever since I've been here, all I do is fight the corporate
bureaucracy and the business, even though I'm trying to protect them
from themselves." Laughing harshly he says, "The auditors were supposed
to put the screws on us. They were supposed to punish us sinners for our
ungodly ways. And you know what? All afternoon, we just watched the
audit partner pamper us with kid gloves. What is the point of even
having an information security program at all? Even the auditors don't
care! Everything just got brushed under the rug for the cost of a golf
game."
John is almost shouting, "Our auditors should be put on trial for
incompetence! All those findings they dismissed were basic hygiene
issues! We live in a churning cesspool of risk. I'm amazed this place
doesn't just collapse under its own weight from lack of caring. I've
waited for years for everything to come crashing down upon us."
He pauses, whispering, "And yet, here we still are..."
Just then, Erik enters the room again, slamming the door behind him. He
grabs the seat closest to the door and looks sternly at John.
"You know what your problem is, Jimmy?" Erik says, pointing his finger
at him. "You are like the political commissar who walks onto the plant
floor, proudly flashing your badge at all the line workers, sadistically
poking your nose in everybody's business and intimidating them into
doing your bidding, just to increase your own puny sense of self-worth.
Half the time, you break more than you fix. Worse, you screw up the work
schedules of everyone who's actually doing important work."
This is going way overboard.
John sputters, "Who do you think you are? I'm trying to keep this
organization secure and keep the auditors away! I'm---"
"Why, thank you for nothing, Mr. [CISO]{.smallcaps}," Erik says,
interrupting him. "As you just observed, the organization can keep the
auditors away without you having to do anything at all. You are like the
plumber who doesn't even realize that you're servicing an airplane, let
alone the route you're flying, or the business condition of the
airline."
By now, John is white as a sheet, his jaw hanging open.
I'm about to intervene on his behalf, when Erik stands up and shouts to
John, "I don't have anything further to say to you until you prove to me
that you understand what just happened in this room. The business
managed to dodge the [SOX]{.smallcaps}-404 audit bullet, without any
help from your team. Until you figure out how and why, you don't have
any business interfering with the daily operations of this organization.
This should be your guiding principle: You win when you protect the
organization without putting meaningless work into the [IT]{.smallcaps}
system. And you win even more when you can take meaningless work out of
the [IT]{.smallcaps} system."
He then turns to me and says, "Bill, you just may be right. You guys
around here sure seem to have completely screwed up information
security."
I never said any such thing. I turn to look at John, intending to convey
that I have no idea what he's talking about, but John doesn't notice me.
He's staring at Erik with an expression of intense hatred on his face.
Erik says to me, pointing his thumb at John, "This guy is like the
[QA]{.smallcaps} manager who has his group writing millions of new tests
for a product we don't even ship anymore and then files millions of bug
reports for features that no longer exist. Obviously, he is making what
you and I would call a 'scoping error.' "
John is shaking with outrage. He says, "How dare you! As a potential
board director, I can't believe you're telling us to put our customer
data and financial statements at risk!"
Erik looks calmly back at John. "You really don't get it, do you? The
biggest risk to Parts Unlimited is going out of business. And you seem
hell-bent on making it go out of business even faster, with all your
ill-conceived, irrelevant technical minutia. No wonder you've been
marginalized! Everyone else is at least *trying* to help the business
survive. If this were an episode of *Survivor*, you'd have been voted
off a long time ago!"
By now, Erik is standing over John. "Jimmy, Parts Unlimited has at least
four of my family's credit card numbers in your systems. I need you to
protect that data. But you'll *never* adequately protect it when the
work product is already in production. You need to protect it in the
processes that create the work product."
Putting his hands in his pockets, he says more softly, "You want a clue?
Go to [MRP]{.smallcaps}-8 plant and find the plant safety officer. Go
talk to her, find out what she's trying to accomplish and how she does
it."
Erik's expression brightens slightly and he adds, "And please convey my
regards to her. I'll be ready to talk with you again when Dick says he
actually wants you around."
With that, he walks out the door.
John looks at me, "What the hell?"
Pulling myself out of my chair, I say, "Don't let it get to you. He says
similar things to me. I'm exhausted and I'm going home. I suggest you do
the same."
John stands up wordlessly. With the calm expression remaining on his
face, he pushes the three-ring binder off the table. It hits the ground
with a large thump, all the contents scattering everywhere. Hundreds of
pages are now strewn across the floor.
He looks at me with a humorless smile and says, "I will. Go home, that
is. I don't know if I'll be in tomorrow---or ever. What's the point,
really?"
He then walks out of the room.
I stare at John's binder, not quite believing he discarded it so
carelessly. He's been carrying it around for over two years. In front of
where he was sitting is a single piece of paper, almost blank with a few
lines scribbled on it. Wondering if it's a suicide note or a resignation
letter, I sneak a quick peek at what appears to be a poem.
A haiku?
::: block
Here I sit, hands tied
Room angry, I could save them
If only they knew
:::
[]{#25-ch22.xhtml}
# Chapter 22 {.ch-title}
## • Monday, September 29 {.dateline}
*The Monday following the audit meeting,* John disappeared. There is a
betting pool in the [NOC]{.smallcaps} speculating whether he suffered a
nervous breakdown, was fired, is just hiding, or worse.
I see Wes and some of his engineers, all laughing loudly, presumably at
John's expense.
I clear my throat to get Wes' attention. When he walks over, I turn
around so that my back is to the [NOC]{.smallcaps}, shielding everyone
from hearing what I'm telling Wes. "Do me a favor? Don't fan the rumor
mill about John. Remember what Steve was trying to impress upon us at
the off-site? We need to build a mutually respectful and trusted working
relationship with him."
Wes' smile disappears and after a moment, he finally says, "Yeah, I
know. I'm just kidding, okay?"
"Good," I say, nodding. "Okay, enough of that. Follow me. I need to talk
to you and Patty about the monitoring project." We go to her office,
where she's sitting at her desk, typing away in a project management
application, full of Gantt charts.
"Got a half hour?" I ask her.
When she nods, we gather around her conference table. I say, "I talked
with Erik on Friday before the audit meeting. Here's what I learned."
I tell them how Erik validated that we can release the monitoring
project and how important this project is to further elevate Brent. I
then try to explain the thought process of how we can determine which
projects we can safely release, based on whether they have any
dependencies on Brent.
"Wait a second. Bill of resources and routings?" Wes says, suddenly
looking very dubious. "Bill, I don't need to remind you that we're not
running a factory here. This is [IT]{.smallcaps} work. We use our brains
to get things done, not our hands. I know Erik has said a couple of
smart things here and there, but come on... This sounds like some sort
of consultant parlor trick."
"Look, I'm having trouble getting my head around this, too," I say. "But
can you really say that the conclusions we're making based on his
thinking are wrong? Do you think it's unsafe to release the monitoring
project?"
Patty wrinkles her forehead. "We know that [IT]{.smallcaps} work can be
projects or changes. And in many of the projects, there are many tasks
or subprojects that show up over and over again. Like setting up a
server. It's recurring work. I guess you could call that a subassembly."
She stands up, walks to the whiteboard, and draws some boxes. "Let's use
the example of configuring a server. It involves procurement, installing
the [OS]{.smallcaps} and applications on it according to some
specification, and then getting it racked and stacked. Then we validate
that it's been built correctly. Each of these steps are typically done
by different people. Maybe each step is like a work center, each with
its own machines, methods, men, and measures."
With less certainty, she continues, "But I'm not sure if I know what the
machine would be."
I smile as Patty scrawls on the board. She's making some leaps that I
haven't been able to make. I don't know where she'll end up, but I think
she's on the right track.
"Maybe the machine," I speculate, "is the tools necessary to do the
work? The virtualization management consoles, terminal sessions, and
maybe the virtual disk space that we attach to it?"
Patty shakes her head. "Maybe. The consoles and terminals sound like
they could be the machine. And I think disk space, the applications,
license keys, and so forth are all actually inputs or the raw materials
needed to create the outputs."
She stares at the whiteboard. At last, she says, "I suspect that until
we do a couple of these, we'll just be stumbling in the dark. I'm
starting to think that this whole work center notion actually describes
[IT]{.smallcaps} work pretty well. For this server setup example, we
know that it's a work center that gets hit by almost every business and
[IT]{.smallcaps} project. If we nail this down, we'll actually be able
to provide better estimates to Kirsten and all her project managers."
"Give me a break, guys," Wes says. "First, our work is not repetitive.
Second, it requires a lot of knowledge, unlike the people who just
assemble parts or tighten screws. We hire very smart people with
experience. Trust me. We can't standardize our work like manufacturing
does."
I consider Wes' point. "Last week, I think I would have agreed with you,
Wes. But I watched one of the final assembly work centers on the
manufacturing floor for fifteen minutes last week. I was overwhelmed
with everything that was going on. Frankly, I could barely keep up with
it. Despite trying to make everything repetitive and repeatable, they
still had to do an incredible amount of improvisation and problem
solving just to hit their daily production goals. They're doing a whole
lot more than tightening screws. They're performing heroics every day,
using every bit of experience and smarts they have."
I say adamantly, "They really earned my respect. If it weren't for them,
we all wouldn't even have jobs. I think we have a lot to learn from
plant floor management."
I pause. "Let's start the monitoring project as soon as we can. The
sooner we start, the sooner we'll get the benefits. We need to protect
each of our resources as if they were all Brents, so let's get this
done."
"There's one more thing," Patty says. "I keep thinking about the lanes
of work we're trying to create. I'd like to test some of these concepts
with the incoming service requests, like account add/change/deletes,
password resets, and---you know---laptop replacements."
She looks uncomfortably at my giant laptop, which is in even worse shape
than when I first got it three weeks ago. I've had to put even more duct
tape on it to keep it from falling apart, due to some further damage I
caused when I used my car keys to pry it open. And now, half the paint
on the screen lid has flaked off.
"Oh, for crying out loud," Wes groans, looking at it, genuinely
embarrassed. "I can't believe we haven't gotten you a replacement. We
don't suck *that* much. Patty, I'll find someone for you to dedicate to
the laptop and desktop backlog."
"Fantastic," Patty replies. "I have a little experiment in mind that I'd
like to try out."
Not wanting to get in the way, I say, "Make it so."
------------------------------------------------------------------------
*When I get to the office on the following Monday,* Patty is waiting for
me. "You have a second?" she asks, obviously eager to show me something.
Next thing I know, I'm standing in Patty's Change Coordination Room. I
immediately spot on the back wall a new board. On it: index cards
arranged in four rows.
The rows are labeled "Move worker office," "Add/change/delete account,"
"Provision new desktop/laptop," and "Reset password."
Each row has been divided up into three columns, labeled "Ready,"
"Doing," and "Done."
Interesting. This looks vaguely familiar. "What is this? Another change
board?"
Patty breaks out into a grin and says, "It's a kanban board. After our
last meeting, I went to [MRP]{.smallcaps}-8 myself. I was so curious
about this work center notion that I had to see it in action. I managed
to find one of the supervisors that I've worked with before, and he
spent an hour with me showing how they managed the flow of work."
Patty explains that a kanban board, among many other things, is one of
the primary ways our manufacturing plants schedule and pull work through
the system. It makes demand and [WIP]{.smallcaps} visible, and is used
to signal upstream and downstream stations.
"I'm experimenting with putting kanbans around our key resources. Any
activities they work on must go through the kanban. Not by e-mail,
instant message, telephone, or whatever.
"If it's not on the kanban board, it won't get done," she says. "And
more importantly, if it is on the kanban board, it will get done
quickly. You'd be amazed at how fast work is getting completed, because
we're limiting the work in process. Based on our experiments so far, I
think we're going to be able to predict lead times for work and get
faster throughput than ever."
That Patty is now sounding a bit like Erik is both unsettling and
exciting.
"What I've done," she continues, "is take some of our most frequent
service requests, documented exactly what the steps are and what
resources can execute them, and timed how long each operation takes.
Here's the result."
She hands me a piece of paper proudly.
It's titled, "Laptop replacement queue." On it is a list of everyone
who's requested either a new or replacement laptop or desktop along with
when they submitted the request and the projected date they'll receive
it. They're sorted by the oldest requests first.
I'm apparently fourteenth in line, with my laptop projected to arrive
four days from now.
"You actually believe this schedule?" I say, trying to be skeptical.
However, it really would be fantastic if we could actually publish this
to everyone, and be able to hit those dates.
"We worked on this all weekend long," she replies. "Based on the trials
we've done since Friday, we're pretty confident that we understand the
time required go from start to finish. We've even figured out how to
save a bunch of steps by changing where we're doing disk mirroring.
Between you and me, based on the time savings we're generating, I think
that we'll beat these dates."
She shakes her head. "You know, I did a quick poll of people we've
issued laptops to. It usually takes fifteen turns to finally get them
configured correctly. I'm tracking that now, and trying to drive this
down to three. We're putting in checklists everywhere, especially when
we do handoffs within the team. It's really making a difference. Error
rates are way down."
I smile and say, "This is important. Getting executives and workers the
tools they need to do their jobs is one of our primary responsibilities.
I'm not saying I don't believe you, but let's keep these time estimates
to ourselves for now. If you can generate a week's track record of
hitting the dates, then let's start publishing this to all the
requesters and their managers, okay?"
Patty smiles in return. "I was thinking the same thing. Imagine what
this will do to user satisfaction if we could tell them when they make
the request how long the queue is, tell them to the day when they'll get
it, and actually hit the date, because we're not letting our workers
multitask or get interrupted!
"My plant supervisor friend also told me about the Improvement Kata
they've adopted. Believe it or not, Erik helped them institute it many
years ago. They have continual two-week improvement cycles, each
requiring them to implement one small Plan-Do-Check-Act project to keep
them marching toward the goal. You don't mind that I've taken the
liberty of adopting this practice in our group to keep us moving toward
our own goals, right?"
Erik had mentioned this *kata* term and the continual two-week
improvement cycles before. Once again, Patty is at least one step ahead
of me.
"This is great work, Patty. Really, really well done."
"Thanks," she modestly responds, but she's grinning from ear to ear.
"I'm really excited by what I'm learning. For the first time, I'm seeing
how we should be managing our work, and even for these simpler service
desk tasks, I know it's going to make a big difference."
She points at the change board at the front of the room. "What I'm
really looking forward to is to start using these techniques for more
complex work. Once we figure out what our most frequently recurring
tasks are, we need to create work centers and lanes of work, just like I
did for my service requests. Maybe we can even get rid of some of this
scheduling, and create kanban boards instead. Our engineers could then
take any card from the Ready column, move them to Doing, until they're
Done!"
Unfortunately, I can't visualize it. "Keep going. Just make sure you're
working with Wes on this, and that he's onboard, okay?"
"Already on it," she replies quickly. "In fact, I have a meeting with
him later today to discuss putting a kanban around Brent, to further
isolate him from our daily crises. I want to formalize how Brent gets
work and increase our ability to standardize what he's working on. It'll
give us a way to figure out where all of Brent's work comes from, both
on the upstream and downstream sides. And of course, it will give us one
more line of defense from people doing drive-bys on Brent."
I give her a thumbs-up, and get ready to leave. "Wait, the change board
looks different. Why are the cards different colors?"
She looks at the board and says, "Oh, I haven't told you? We're
color-coding the cards to help us get ready for when we lift the project
freeze. We've got to have some way to make sure we're working on the
most important things. So, the purple cards are the changes supporting
one of the top five business projects, otherwise, they're yellow. The
green cards are for internal [IT]{.smallcaps} improvement projects, and
we're experimenting with allocating twenty percent of our cycles just
for those, as Erik recommended we do. At a glance, we can confirm that
there's the right balance of purple and green cards in work."
She continues, "The pink sticky notes indicate the cards that are
blocked somehow, which we're therefore reviewing twice a day. We're also
putting all these cards back into our change tracking tool, so we're
putting the change [ID]{.smallcaps}s on each of the cards, too. It's a
bit tedious, but at least now part of the tracking is automated."
"Wow, that's...incredible," I say, with genuine awe.
------------------------------------------------------------------------
*Later that day,* I'm sitting down at another conference table with Wes
and Patty to figure out how we're going to turn the project faucet back
on slowly enough so we can drink but don't end up drowning.
"As Erik pointed out, we actually have two project queues that we need
to sequence: business and internal projects," Patty says, pointing to
the thin stapled set of papers in front of us. "Let's do the business
projects first, because they're easier. We have the top five most
important projects identified, as ranked by all the project sponsors.
Four of these will require some work from Brent. When the freeze lifts,
we propose that we only release these five projects."
"That was easy," Wes laughs. "I can't believe how much arguing,
posturing, horse-trading, and backstabbing went on to get the top five
projects identified. It was worse than Chicago politics!"
He's right. But in the end, we got our prioritized list.
"Now to the hard part. We're still struggling on how to prioritize our
own seventy-three internal projects," she says, her expression turning
glum. "There's still way too many. We've spent weeks with all the team
leads trying to establish some sort of relative importance level, but
that's all we've done. Argue."
She flips to the second page. "The projects seem to fall into the
following categories: replacing fragile infrastructure, vendor upgrades,
or supporting some internal business requirement. The rest are a
hodgepodge of audit and security work, data center upgrade work, and so
forth."
I look at the second list, scratching my head. Patty is right. How does
one objectively decide whether "consolidating and upgrading e-mail
server" is more or less important than "upgrading thirty-five instances
of [SQL]{.smallcaps} databases"?
I run my fingers down the page, trying to see if anything jumps out at
me. It's the same list I saw during my first week on the job, and they
still all look important.
Realizing that Wes and Patty have spent almost a week with this list, I
try to elevate my thinking. There's got to be some simple way to
prioritize this list that doesn't look like moving a bunch of boxes
around.
Suddenly, I remember how Erik described the importance of preventive
work, such as the monitoring project. I say, "I don't care how important
everyone *thinks* their project is. We need to know whether it increases
our capacity at our constraint, which is *still* Brent. Unless the
project reduces his workload or enables someone else to take it over,
maybe we shouldn't even be doing it. On the other hand, if a project
doesn't even require Brent, there's no reason we shouldn't just do it."
I say assertively, "Give me three lists. One that requires Brent work,
one that increases Brent's throughput, and the last one is everything
else. Identify the top projects on each list. Don't spend too much time
ordering them---I don't want us spending days arguing. The most
important list is the second one. We need to keep Brent's capacity up by
reducing the amount of unplanned work that hits him."
"That sounds familiar," Patty says. She digs up the list of fragile
services that we created for the change management process. "We should
make sure we have a project to replace or stabilize each one of these.
And maybe we suspend indefinitely any infrastructure refresh project for
anything that's not fragile."
"Now hang on a minute," Wes says. "Bill, you said it yourself.
Preventive work is important, but it always gets deferred. We've been
trying to do some of these projects for years! This is our chance to get
caught up."
Patty says quickly, "Didn't you hear what Erik told Bill? Improving
something anywhere not at the constraint is an illusion. You know, no
offense, but you sort of sound like John right now."
Despite my best attempts, I still laugh.
Wes turns red for a moment, and then laughs loudly. "Ouch. Okay, you got
me. But I'm just trying to do the right thing."
"Doh!" he says, interrupting himself. "I did it again."
We all laugh. It makes me wonder how John is doing. To the best of my
knowledge, no one has seen him all day.
While Wes and Patty are scribbling notes, I scan the list of internal
projects again. "Hey, why is there a project for upgrading the
[BART]{.smallcaps} database even though it's going to be decommissioned
next year?"
Patty peers down at her list and then looks embarrassed. "Oh, jeez. I
didn't see that because we never reconciled the business and
[IT]{.smallcaps} projects with each other. We're going to have to scrub
the lists one more time to find dependencies like this. I'm sure there
are others."
Patty thinks for a moment, "It's strange. Even though we have so much
data on projects, changes, and tickets, we've never organized and linked
them all together this way before.
"Here's another thing we can learn from manufacturing, I think," she
continues. "We're doing what Manufacturing Production Control
Departments do. They're the people that schedule and oversee all of
production to ensure they can meet customer demand. When they accept an
order, they confirm there's enough capacity and necessary inputs at each
required work center, expediting work when necessary. They work with the
sales manager and plant manager to build a production schedule so they
can deliver on all their commitments."
Again, Patty is way ahead of me. This answers one of the first questions
that Erik tasked me with before I quit. I make a note for us to visit
[MRP]{.smallcaps}-8 to see their production control processes.
I get a creeping suspicion that "managing the [IT]{.smallcaps}
Operations production schedule" should be somewhere in my job
description.
------------------------------------------------------------------------
*Two days later,* I'm surprised to see a new laptop in my office. My old
laptop has been disconnected and moved to the side.
I look at my clipboard, flipping back to the laptop/desktop replacement
schedule that Patty gave me earlier this week.
Holy crap.
Patty had promised laptop delivery for Friday, and I'm receiving it two
days early.
I log on to make sure it's been configured properly. All the
applications seem to be there, all my data have been transferred, e-mail
is working, the network drives show up like before, and I can install
new applications.
I feel tears of gratitude welling up when I see how fast my new laptop
is. Grabbing Patty's schedule, I go next door. "I love the new laptop.
Two days ahead of schedule, even. Everyone ahead of me got their
systems, too, right?"
Patty grins. "Yep. Every single one of them. A couple of the early ones
we delivered had a few configuration errors or were missing something.
We've corrected it in the work instructions, and we seem to be batting
one hundred percent delivering correct systems for the past two days."
"Great work, Patty!" I say, excitedly. "Go ahead and start publishing
the schedule. I want to start showing this off!"
[]{#26-ch23.xhtml}
# Chapter 23 {.ch-title}
## • Tuesday, October 7 {.dateline}
*As I drive into work the following Tuesday morning,* I get an urgent
phone call from Kirsten. Apparently, Brent is now almost a week late
delivering on another Phoenix task---allegedly something that Brent said
would only take an hour to do. Once again, the entire Phoenix testing
schedule is in jeopardy.
On top of that, several other of my group's critical tasks are late,
putting even more pressure on the deadline. This is genuinely
dispiriting to hear. I thought all our recent breakthroughs would solve
these due-date performance issues.
How can we unfreeze more work if we can't even keep up now?
I leave Patty a voicemail. To my surprise, it takes her three hours to
call me back. She tells me that something is going terribly wrong with
our scheduling estimates and that we need to meet right away.
Once again, I'm in a conference room, with Patty at the whiteboard, and
Wes scrutinizing the printouts she's taped up.
"Here's what I've learned so far," Patty says, pointing at one of the
sheets of paper. "The task that Kirsten called about is delivering a
test environment to [QA]{.smallcaps}. As she said, Brent estimated that
it would take only forty-five minutes."
"Sounds about right," Wes says. "You just need to create a new
virtualized server and then install the [OS]{.smallcaps} and a couple of
packages on it. He probably even doubled the time estimate to be safe."
"That's what I thought, too," Patty said, but she's shaking her head.
"Except it's not just one task. What Brent signed up for is more like a
small project---there's over twenty steps involving at least six
different teams! You need the [OS]{.smallcaps} and all the software
packages, license keys, dedicated [IP]{.smallcaps} address, special user
accounts set up, mount points configured, and then you need the
[IP]{.smallcaps} addresses to be added to an [ACL]{.smallcaps} list on
some file server. In this particular case, the requirements say that we
need a physical server, so we also need a router port, cabling, and a
server rack where we have enough space."
"Oh...," Wes says, sounding exasperated, reading what Patty is pointing
at. He mumbles, "Physical servers are such a pain in the ass."
"You're missing the point. This would still be happening, even if it
were virtualized," Patty says. "First, Brent's 'task' turns out to be
considerably more than just a task. Second, we're finding that it's
multiple tasks spanning multiple people, each of whom have their own
urgent work to do. We're losing days at each handoff. At this rate,
without some dramatic intervention, it'll be weeks before
[QA]{.smallcaps} gets what they need."
"At least we don't need a firewall change," Wes says, snidely. "Last
time we needed one of those, it took John's group almost a month. Four
weeks for a thirty-second change!"
I nod, knowing exactly what Wes is referring to. The lead time for
firewall changes has become legendary.
Wait. Didn't Erik mention something like this? For a firewall change,
even though the work only required thirty seconds of touch time, it
still took four weeks of clock time.
That's just a microcosm of what's happening with Brent. But what's
happening to us right now is much, much worse, because there are
handoffs.
With a groan, I put my head on the conference table.
"You okay?" Patty asks.
"Give me a second," I say. I walk up to the whiteboard and struggle to
draw a graph with one of the markers. After a couple of tries, I end up
with a graph that looks like this:
::: {#26-ch23.xhtml_image}
{#graph-img}
:::
I tell them what Erik told me at [MRP]{.smallcaps}-8, about how wait
times depend upon resource utilization. "The wait time is the
'percentage of time busy' divided by the 'percentage of time idle.' In
other words, if a resource is fifty percent busy, then it's fifty
percent idle. The wait time is fifty percent divided by fifty percent,
so one unit of time. Let's call it one hour. So, on average, our task
would wait in the queue for one hour before it gets worked.
"On the other hand, if a resource is ninety percent busy, the wait time
is 'ninety percent divided by ten percent', or nine hours. In other
words, our task would wait in queue nine times longer than if the
resource were fifty percent idle."
I conclude, "So, for the Phoenix task, assuming we have seven handoffs,
and that each of those resources is busy ninety percent of the time, the
tasks would spend in queue a total of nine hours times the seven
steps..."
"What? Sixty-three hours, just in queue time?" Wes says, incredulously.
"That's impossible!"
Patty says with a smirk, "Oh, of course. Because it's only thirty
seconds of typing, right?"
"Oh, shit," Wes says, staring at the graph.
Suddenly, I recall my conversation with Wes right before Sarah and Chris
decided to deploy Phoenix at Kirsten's meeting. Wes complained about
tickets related to Phoenix bouncing around for weeks, which delayed the
deployment.
It was happening then, too. That wasn't a handoff between
[IT]{.smallcaps} Operations people. That was a handoff between the
Development and [IT]{.smallcaps} Operations organization, which is far
more complex.
Creating and prioritizing work inside a department is hard. Managing
work among departments must be at least ten times more difficult.
Patty says, "What that graph says is that everyone needs idle time, or
slack time. If no one has slack time, [WIP]{.smallcaps} gets stuck in
the system. Or more specifically, stuck in queues, just waiting."
As we digest this, Patty continues. "Each of those sheets of paper on
the board is like this Phoenix 'task,' " she says, making air quotes
with her hands. "It looks like a single person task, but it's not. It's
actually multiple steps with multiple handoffs among multiple people. No
wonder Kirsten's project estimates are off.
"We need to correct this on Kirsten's schedule and her work breakdown
structure, or [WBS]{.smallcaps}. Based on what I've seen, fully
one-third of our commitments to Kirsten fall into this category."
"Just great," Wes says. "It's like *Gilligan's Island*. We keep sending
people off on three-hour tours, and months later, we wonder why none of
them come back."
Patty says, "I wonder if we could create a kanban lane for each of these
'tasks?' "
"Yes, that's it," I say. "Erik was right. You've just found a big pile
of recurring work! If we can document and standardize this recurring
work, and gain some mastery over it, just like you did with laptop
replacement, I'm sure we can improve flow!"
I add, "You know, if we can standardize all our recurring deployment
work, we'll finally be able to enforce uniformity of our production
configurations. That would be our infrastructure snowflake problem---you
know---no two alike. How Brent turned into Brent is that we allowed him
to build infrastructure only he can understand. We can't let that happen
again."
"Good point," Wes grunts. "You know, it's odd. So many of these problems
we've been facing are caused by decisions we made. We have met the
enemy. And he is us."
Patty says, "You know, deployments are like final assembly in a
manufacturing plant. Every flow of work goes through it, and you can't
ship the product without it. Suddenly, I know exactly what the kanban
should look like."
Over the next forty-five minutes, we create our plan. Patty is going to
work with Wes' team to assemble the top twenty most frequently recurring
tasks.
She will also figure out how to better manage and control tasks when
they are queued. Patty proposes a new role, a combination of a project
manager and expediter. Instead of day-by-day oversight, they would
provide minute-by-minute control. She says, "We need fast and effective
handoffs of any completed work to the next work center. If necessary,
this person will wait at the work center until the work is completed and
carry to the next work center. We'll never let critical work get lost in
a pile of tickets again."
"What? Someone assigned to carry around tasks from person to person,
like a waiter?" Wes asks in disbelief.
"At [MRP]{.smallcaps}-8, they have a 'water spider' role that does
exactly that," she counters. "Almost all of this latest Phoenix delay
was due to tasks waiting in queues or handoffs. This will make sure it
doesn't happen again.
"Eventually," she adds, "I'll want to move all the kanbans, so that we
don't need a person acting as the signaling mechanism for work handoffs.
Don't worry. I'll have it figured out in a couple of days."
Wes and I don't dare doubt her.
[]{#27-ch24.xhtml}
# Chapter 24 {.ch-title}
## • Saturday, October 11 {.dateline}
*The following Saturday was relatively peaceful.* In fact, it's the most
relaxing weekend my family has had since I took my new job. With
Halloween a few weeks away, Paige insisted that we take the whole family
out to the pumpkin patch.
It was a chilly Saturday morning, so we were exhausted just bundling up
the kids and getting them in the car. When we arrived at the nearby
farm, Paige and I laughed uncontrollably at Parker, who looked like a
giant, angry sausage stuffed into his blue parka. She couldn't resist
taking pictures while Grant orbited us in excitement, taking pictures
with his own camera.
Afterward, we went to a local microbrewery, enjoying lunch on the patio
in the warm afternoon sun.
"I'm so glad we could do this," Paige says. "It's really nice. You seem
less stressed lately. I can really tell things are getting better."
She's right. It felt like we had turned a corner at work somehow. Just
like how I wasn't wasting as much time fighting my ancient laptop, it
seemed like my team was spending more and more of our time doing
productive work and less and less firefighting.
Although I know getting a new laptop has absolutely nothing to do with
our organizational performance, getting rid of that old clunker was like
getting rid of a thousand-pound anchor that someone had tied around my
neck while I was swimming across the ocean.
We're still grappling with gradually melting the project freeze. I'm
guessing that we'll probably be able to unfreeze twenty-five percent of
all the projects, along with a bunch of other new projects designed to
further elevate Brent.
There were still so many uncertainties. But unlike before, our
challenges feel within our ability to understand and conquer. Our goals
finally seem achievable. I no longer feel like I am always on my heels,
with more and more people piling on, trying to push me over.
With the business agreeing, with the exception of Sarah, on what the
priorities are, my job actually seems fair. It feels like we have the
initiative and are attacking the problem, instead of the other way
around.
I like it.
I look up to see Paige smiling back at me and then yell out in panic as
I see Parker knocking over her glass of beer.
The rest of the afternoon passes too quickly, but it's one of the best
days I've had all year.
------------------------------------------------------------------------
*Later that evening,* Paige is curled up with me on the couch. We're
watching the Clint Eastwood movie *Pale Rider*. The kids have gone to
sleep, and this is the first time we've actually watched a movie
together in months.
I laugh uncontrollably watching the main character, "the Preacher"
played by Eastwood, methodically pick off the gang of nine evil
deputies. Paige looks at me with amused disapproval.
"What exactly is so funny about this?" she asks.
This makes me laugh harder. When another deputy gets shot in the
background, I say, "Look at that! You know what's going to happen, but
the marshal just stands there in the middle of the street, watching the
carnage! Look at the way the wind rustles through his coat! And his gun
isn't even drawn! I love it!"
"I'll never understand you," Paige says, shaking her head with a smile.
Just then, my cell phone rings. I instinctively reach for it.
Holy crap. It's John. No one has seen or heard from him since that audit
meeting, over two weeks ago. We're pretty sure he hasn't been fired, but
no one knows more than that. I've been meaning to check the local
hospitals to make sure he's not convalescing alone somewhere.
As much as I want to talk with him, I don't want to leave Paige and the
movie. I look at the clock, and see that there's probably only fifteen
more minutes until the end. Not wanting to miss the final gunfight, I
mute the phone. I'll call him back when the movie is over.
A couple of seconds later, my phone rings again, and I again hit the
mute button.
My phone rings again. For the third time, I mute the phone, but quickly
send him a text message: *Grt hearing from u. Can't talk right now. Will
call u in 20m*.
Unbelievably, my phone buzzes again, so I turn the ringer off, putting
my phone underneath some cushions on the couch.
Paige asks, "Who keeps calling?"
When I say, "John," she rolls her eyes, and we watch the remaining ten
minutes of the movie.
"I can't believe I haven't seen that movie until tonight!" I say, giving
Paige a squeeze. "That was such a great idea, darling!"
"It's been a great day. It's so nice having a normal life again," she
says, returning my hug, and then with a smile, she gets up, taking the
empty beer bottles with her.
I agree. I pick up my phone, my heart skipping a beat when I see "15
missed calls."
Suddenly afraid that I may have missed something truly disastrous, I
quickly look to see who called. Every call was from John. I call him
immediately.
"Billy, so good to hear your voice again---my friend---my dear, dear
old---dear ol' friend," he slurs. Good Lord. He's completely drunk.
"Sorry I couldn't return your calls right away. I was out with Paige," I
say, feeling guilty at my slight mistruth.
"No problem. Look, I just wanted to see you one---one lasht time before
I left---be leaving," he says.
"Leaving? What do you mean 'leaving'? Where are you going?" I say with
alarm, wondering how long he's been drinking. Maybe I should have called
back sooner. I suddenly visualize him on the other end of the phone with
an open bottle of sleeping pills in his hand, already half-empty.
I hear him laugh, maybe a bit hysterically. "Don't worry, Billy. I'm not
going to kill myself. Haven't had enough to drink---yet. Har-har! I just
wanted to see you before I left town tonight. Let me buy you one last
drink."
"Uh, can't this wait until tomorrow? It's almost midnight," I say,
slightly relieved.
He tells me that he'll be long gone by tomorrow and convinces me to join
him at the Hammerhead Saloon downtown.
When I pull into the parking lot, I immediately spot John's Volvo
station wagon. Hitched behind his car is a U-Haul trailer, and there's a
pile of empty beer cans right outside the driver's side door.
I find him in a booth at the back of the crowded bar, and it's obvious
he's been here all day. He doesn't seem to have bathed or changed his
clothes since I last saw him. His hair is greasy and wildly askew as if
he just woke up, his face is covered in stubble, and there are food
stains on his shirt. His keys and wallet have been tossed carelessly
next to the salt and pepper shakers.
John urgently waves over a waitress, taking a moment to rehearse his
words, but still slurring as he says, "I'd like two double scotches,
neat, for me and my friend here. And those yummy nachos... Please."
She looks over at me questioningly, obviously having already served him
plenty. I nod, but say quietly, "Let's start with two cups of coffee,
please. I'll take care of him." As I say it, I reach over and take his
keys off the table.
For a moment, she looks dubious but gives me a small smile and walks
away.
"Dude, you look like shit," I say candidly.
"Thanks, pal. So do you," he replies, before bursting out laughing.
"Nice. Where the hell have you been? Everyone has been looking for you,"
I say.
"I've been at home," he says, grabbing some popcorn from our table.
"I've been mostly reading and watching [TV]{.smallcaps}. Whoa, there is
some crazy shit on [TV]{.smallcaps} these days. Crazy! But then I
started thinking it's time for me to move on, so I spent most of today
packing. I just wanted to ask you one little question before I left."
"You mentioned that on the phone," I say, as the waitress arrives with
two cups of coffee and the nachos. John looks with confusion at the mugs
on the table, so I say, "Don't worry. Our drinks are on the way."
When I get him to take a sip of coffee, he asks, "Just tell me straight.
Is it really true that I haven't done anything of value for you? In all
the three years that we've worked together, I've never, ever been
helpful?"
I take a deep breath, trying to decide what to tell him. A friend told
me years ago, "To tell the truth is an act of love. To withhold the
truth is an act of hate. Or worse, apathy."
I had laughed at those words at the time, but over the years, I've
realized that having people give you honest feedback is a rare gift.
Looking across at John, even though he looks like a completely broken
man, I wonder whether the right thing to do is to just let him off easy
and tell him what he wants to hear.
Finally, I say, "Look, John. You're a good guy, and I know your heart is
in the right place, but up until you helped hide us from the
[PCI]{.smallcaps} auditors during the Phoenix meltdown, I would have
said no. I know that's not what you want to hear, but...I wanted to make
sure that I wasn't feeding you a line of bullshit."
Amazingly, John looks even more crestfallen than before. "Where's that
goddamned scotch?" he yells out. Turning back to look at me, he says,
"Are you serious? After three whole goddamned years of working together,
you're telling me that I haven't helped you, not even in the slightest
bit?"
"Well, for most of those years, I was in charge of the midrange group,
which you didn't get too involved with," I explain calmly. "We found our
own security guidance on the web. When we did interact, you just tried
to dump a bunch of work on me. Look, I care about security, and we
always look for risks to our systems and data, but we're always up to
our eyeballs in urgent work, trying to keep our heads above water. And
in my new role, I'm just trying to help the company survive."
John says, "But don't you see, that's what I'm trying to do, too! I'm
just trying to help you and the business survive!"
I reply, "I know. But, in my world, I'm responsible for keeping all our
services up and running, and deploying new services like Phoenix.
Security had to take a backseat. Trust me, I'm well aware of the risks
of bad security, and I know it would be a career-ending move to have a
large-scale security breach on my watch."
I shrug my shoulders. "I'm making the best possible decisions given my
knowledge of the risks. I just don't think that all the stuff you wanted
me to do would have helped the business as much as all the other things
on my plate.
"Come on," I continue, "Does it bother you deep down that the business
got through the [SOX]{.smallcaps}-404 audit without you? Does that make
you question the importance and validity of your recommendations?"
John just stares back at me.
As if on cue, our waitress arrives with the two scotches. John picks his
up, and finishes it in one gulp. "Another round, please."
When she looks at me, I shake my head and mouth the words, "Check,
please? And call a cab?"
She nods and disappears. I take a sip of my scotch and look back at
John. His head is now lolling backward and he's muttering something. By
now, he's completely unintelligible.
I feel sorry for him.
I take his wallet off the table.
"Hey!" he says.
"Our waitress is tipping out, and I've got to pay her, but, I forgot my
wallet at home," I say.
He laughs at me, looking at me blearily. "No problem, old pal. I'll get
this one. I always get them, don't I?"
"Thanks," I say, and grab his driver's license. I wave over the waitress
and point to his home address.
Returning John's wallet, I pull out my own and pay.
I help John up and pour him into the cab, making sure his wallet and
keys are back in his pocket. Not wanting John to deal with the cabbie, I
pay the cabbie, too.
Watching him leave, and then looking at his station wagon and U-Haul
full of only a fraction of his worldly belongings, I just shake my head.
I head back to my car, wondering when I'm going to see him next.
------------------------------------------------------------------------
*The next day,* I call John a couple of times on his cell phone, but he
never answers. I finally leave him a voicemail telling him that I hoped
he got home okay, where his car was, and to give me a ring if he needs
anything.
The rumor mill is abuzz. There's talk that he was hospitalized,
arrested, abducted by aliens, or locked up in a mental institution.
I'm not sure how these rumors were starting, as I didn't tell anyone
about my late-night meeting with him, nor was I ever going to.
I'm just finishing up putting Grant to bed on Monday night when I get a
text message from John. I quickly read it: *Thanks for the lift home the
other day. Been thinking. I told Dick that u'll be joining our
8*[am]{.smallcaps} *mtg tomorrow. Should be interesting.*
What meeting with Dick?
I stare at my phone. On the one hand, John is alive and seems able to
work. That's good.
On the other hand, John is now talking about meeting with Dick, the
second most powerful executive in the company, tomorrow morning,
potentially in some mentally unbalanced state and has already broadcast
that I'm his coconspirator.
That's not so good. I quickly tap out my reply to him: *Good hearing
from u. Hope you're doing ok? What is Dick meeting about? May not be
able to make it.*
He responds immediately: *I've been arrogant. Realized yest that I don't
actually know much about Dick. Must change that. Together.*
Worried that John may be completely off his rocker, I immediately call
him. He answers on the first ring, sounding oddly cheery. I hear him
say, "Good evening, Bill. Thanks again for Saturday night. What's up?"
"What exactly are you up to, John?" I say. "What's this meeting tomorrow
with Dick about, and why are you dragging me into it?"
He replies, "I spent most of yesterday in bed, since I could barely get
myself to the bathroom and back. My head felt like it was a lemon
smashed by a brick. What drinks were you buying me that night?"
He doesn't wait for me to answer before continuing, "I kept thinking
about our last conversation at the bar. I realized that if I haven't
done anything useful for *you*, who I should have the *most* in common
with, then it stands to reason that I haven't been useful to almost
everyone else, who I have *nothing* in common with.
"That's got to change," he says adamantly.
I bite my tongue, wanting to hear John out before I recommend that he
cancel tomorrow's meeting.
He continues, "I kept thinking about what Erik said, that he'd be ready
to talk to me when Dick says he wants me around."
"Uh, I don't think a quick thirty-minute 'getting to know you' meeting
is going to get you there," I say, seriously skeptical.
He responds with complete calm, "Wouldn't you agree, like so many things
in life, that we must always start by at least gaining an understanding
of the person we're dealing with? What could go wrong? I just want to
learn more about his job."
In my head, I immediately envision John asking or saying something
stupid, completely pissing Dick off, and Dick firing him on the spot,
and then firing me, too, just to eliminate the contagion.
Yet I find myself saying, "Okay, I'll be there."
[]{#28-ch25.xhtml}
# Chapter 25 {.ch-title}
## • Tuesday, October 14 {.dateline}
*The next morning at 7:50 a.m.,* I'm heading toward Dick's office. As I
round the corner, I see John already chatting amiably with Dick's
assistant. My jaw drops. John's physical appearance has completely
changed.
He's obviously showered and cleaned up. He's also shaved his head and
appears to have lost fifteen pounds. He's wearing what I can only
describe as a European styled shirt and a vest. Unlike the slightly
baggy shirts he usually wears, the pink shirt he's wearing fits tightly
on him. Combined with the vest, he looks like a...fashion model? London
clubber? Las Vegas card dealer?
With the shaved head, his calm friendly smile and perfect posture, he
looks like some sort of enlightened monk.
Most significantly, I notice that his three-ring binder is nowhere to be
seen. Instead, he's carrying only a pristine black and white lab
notebook and a pen.
"Good morning, Bill," John says with beatific calm.
"Hi," I finally say. "Uh, you're looking better than the last time I saw
you."
He just smiles, and then says something quietly to Dick's assistant that
makes her clap her hands over mouth and laugh loudly. She then gets up,
walks over to Dick's door and gestures both of us to follow her, saying,
"Let's see if we can start your meeting a little early. It'll give you
more time with him."
I'm walking into Dick's office, trailing behind John.
"Nice haircut," Dick says to John with a smile, pointing at his own bald
head. Then in a business-like tone, he says, "So what can I do for you?
I have a commitment at 8:30, so let's not waste time."
John opens his notebook to the first page, which is completely blank.
"Thanks for taking the time to meet with us on such short notice. I
promise you that we won't waste your time. And to make sure I don't have
any incorrect or preconceived notions, could you start by telling us
what exactly you do here at Parts Unlimited? What is your exact role?"
My eyes widen in horror at John's question. This is what gets asked on
Bring Your Kid To Work Day but not by company executives.
I quickly look over to gauge Dick's reaction. He looks surprised for a
moment, but then blandly replies, "Interesting question."
He pauses briefly and then seems to just play along. "I started here at
Parts Unlimited fifteen years ago as [CFO]{.smallcaps}, which, back
then, was defined in a pretty traditional way. I was primarily
responsible for managing the financial risks of the organization and
leading the financial planning and operations processes. Even back then,
we had a huge number of regulatory compliance issues, which I also
owned.
"Shortly after Steve became [CEO]{.smallcaps}, he told me that we needed
a senior executive to own planning and operations across the entire
organization and then gave those responsibilities to me. To help ensure
that the company achieves our goals, I set up the objectives and
measurements program for the entire management team. I wanted to keep
all our managers accountable, ensure that they have the skills necessary
to succeed, and help make sure that complex initiatives always have the
right stakeholders involved and so forth."
John looks up from furiously taking notes on the first page in his new
notebook. "I've heard many people call you the 'de facto
[COO]{.smallcaps}' around here, and that you're basically Steve's
right-hand man."
Dick considers his comments for a moment, before saying, "My official
title doesn't have 'operations' anywhere in it, but it's the part of my
job that I love most. When a company is as big as we are, with so many
business processes, so many managers and workers, almost everything is
complex. As smart as Steve is, even he needs help making sure the
company strategy and goals are realistic and making an objective
assessment of what we're actually capable of."
With a very small smile, he adds, "Want to hear something funny? People
say that I'm more approachable than Steve! Steve's incredibly
charismatic, and let's face it, I'm an asshole. But when people have
concerns, they don't want to have their minds changed. They want someone
to listen to them and help make sure Steve gets the message."
I find myself leaning forward. I'm surprised to hear Dick giving John,
and therefore me, such candid and informative answers.
"What differentiates a good day from a bad day for you?" John continues.
Momentarily taken aback, Dick laughs loudly. "I'll tell you what a good
day feels like. It feels like the end of the year when we're beating the
pants off the competition---when we haven't closed the books yet, but
everyone knows that it's going to be a monster quarter. All the sales
people would have hit quota, and the ones on top would have hit their
accelerators. A good day feels like my staff panicking about the size of
the commission checks we're going to be writing them.
"I'm not worried, because those big commission checks would mean the
company is making money," he says, smiling even more broadly. "Steve
would be excited to announce to Wall Street and the analysts how well
the company is performing---all made possible because we had a winning
strategy, and also because we had the right plan and the ability to
operate and execute. It means that we got all the parts of this
organization to click as a team and win.
"*That's* a fun day for me. We can plan and plan until the cows come
home, but until we execute and achieve the goals, it's academic," he
says. Then his smile disappears. "Of course, we haven't had a day like
that in over four years...
"A bad day is like the one we had two weeks ago," he says, now looking
frustrated and even angry. "We can't close the quarter because of some
[IT]{.smallcaps} failure, we can't seem to execute on our most critical
project to close the gap with the competition, we keep losing customers,
the auditors are making noises about some restatement project, and the
board of directors is debating whether to fire all of us because we're
such screwups."
Dick shakes his head, with a wan, tired smile, "In those moments, you
wonder whether the problem is the economy, our strategy, our management
team, you [IT]{.smallcaps} guys, or, quite frankly, maybe the entire
problem is me. Those are the days I just want to retire."
John looks down at his notes and then asks, "What are your goals,
objectives, and measurements for this year?"
Dick gets up from the sitting area to walk to his desk, saying, "Here,
I'll show you."
He picks up a thin, black three-ring binder that was open on his desk,
sits back down across from us, and shows us the open binder. "Here are
two slides I look at every day."
::: block
[CFO GOALS]{.smallcaps}
Health of company
Revenue
Market share
Average order size
Profitability
Return on assets
Health of Finance
Order to cash cycle
Accounts receivable
Accurate and timely financial reporting
Borrowing costs
:::
"These are the company goals and the objectives I've set for finance,"
he explains. "I've learned that while the finance goals are important,
they're not the most important. Finance can hit all our objectives, and
the company still can fail. After all, the best accounts receivables
team on the planet can't save us if we're in the wrong market with the
wrong product strategy with an [R&D]{.smallcaps} team that can't
deliver."
Startled, I realize he's talking about Erik's First Way. He's talking
about systems thinking, always confirming that the entire organization
achieves its goal, not just one part of it.
As I'm pondering this, Dick then points to the second slide, saying, "So
that's what's on the second slide, which shows what I believe are the
more important company goals. I look at this slide every day."
- Are we competitive?
- Understanding customer needs and wants: Do we know what to build?
- Product portfolio: Do we have the right products?
- [R&D]{.smallcaps} effectiveness: Can we build it effectively?
- Time to market: Can we ship it soon enough to matter?
- Sales pipeline: Can we convert products to interested prospects?
- Are we effective?
- Customer on-time delivery: Are customers getting what we promised
them?
- Customer retention: Are we gaining or losing customers?
- Sales forecast accuracy: Can we factor this into our sales planning
process?
John and I lean forward to study the slide. Usually company managers
like me only see our departmental objectives. This slide shows the
bigger picture.
As I'm thinking, John points at the slide and asks, "Which of these
measurements are most at risk?"
Dick laughs humorlessly. "All of them! From a product portfolio
perspective, the competition is killing us and taking market share away
from us each day. We're \$20 million and years into Project Phoenix, and
we're still not competitive in the market yet. On the retailing and
manufacturing side of the business, customer satisfaction is dropping,
and we're losing customers, despite Sales' promise that we can win them
back somehow."
John underlines some of his notes. "Can we have a copy of this? Bill and
I would like to study this further and make sure our teams understand
this, so we can ensure that everything we do helps advance these goals."
Dick thinks for a moment. "Sure. Can't hurt, I suppose. I'll have my
assistant give you both a copy on your way out."
"One more thing," John says. "For each of these initiatives and
measurements, who are the managers held responsible and accountable?"
Dick looks at John appraisingly, as do I. I've never seen this side of
John before, either.
Dick says, "My assistant will get you the spreadsheet with those names
on it, as well."
John thanks him and then looks at his watch. "We're almost out of time.
This has been really terrific. Thank you for taking the time to tell us
about your daily life. Is there anything that either of us can do for
you?"
"Sure," he replies. "Stay focused and get Phoenix working. Without it,
we are stuck in the mud."
I frown. I look at the second slide again. I feel like Phoenix is not
what Dick should be asking me to focus on.
Unable to articulate why, I merely say, "Yes, sir. We'll surely have
some good news to share by the end of the month." I'm not entirely sure
what that good news will be, but I've learned that when dealing with
senior officers, there's a time and a place for telling bad news. This
is neither of them.
"Good," he says, giving us a tight-lipped smile.
We exchange parting pleasantries and head out of his office.
As the elevator doors open, John says to me, "You know, I think there's
something very similar about us dodging the [SOX]{.smallcaps}-404 audit
bullet and what's on Dick's second slide," he says. "I can't quite put
my finger on it, but I think there's something here that we need to
understand better."
"You're right," I say. "I don't think Dick realizes how much his
measurements depend on [IT]{.smallcaps}. He asked me about Phoenix, but
he should have asked me about all the objectives."
We both step into the elevator. I continue, "Are you available later
today to meet? Let's see if we can connect all these dots. I suspect
that we're sitting on the missing link that might explain both why the
company keeps missing its goals as well as why [IT]{.smallcaps} keeps
being undervalued."
"Absolutely," he says excitedly.
------------------------------------------------------------------------
*I can barely contain my sense of excitement.* John's crazy meeting with
Dick seems to have revealed something genuinely important.
I believe with utter certainty that whatever we're trying to figure out
is critical to the First Way. He talked about the need to understand the
true business context that [IT]{.smallcaps} resides in.
I'm pretty sure no one has linked Dick's top measurements to the
prerequisite [IT]{.smallcaps} objectives.
No wonder Dick just has a vague sense that [IT]{.smallcaps} is screwing
up---it's a dull, throbbing ache that he can't localize. Our next step
is obvious: We must make those pains very specific and visible to
convince Dick that [IT]{.smallcaps} is capable of not just screwing up
less often but helping all of the business win.
This is too important and urgent to struggle blindly in the dark, and I
need to call Erik for advice. Standing in the lobby of Building 2, I
speed-dial him.
"Yeah?" I hear him answer.
I say, "Good morning, Erik. I've just had a remarkable meeting with
Dick. Do you have some time to help me think this through?"
When he grunts, "Yes," I describe to him the meeting and how it came
about and my certainty that it has uncovered something critical.
"Well, good for Jimmy. Or maybe I should call him 'John.' He finally got
his head far enough out of his ass to begin to see," I hear Erik say as
he laughs, not unkindly. "As part of the First Way, you must gain a true
understanding of the business system that [IT]{.smallcaps} operates in.
W. Edwards Deming called this 'appreciation for the system.' When it
comes to [IT]{.smallcaps}, you face two difficulties: On the one hand,
in Dick's second slide, you now see that there are organizational
commitments that [IT]{.smallcaps} is responsible for helping uphold and
protect that no one has verbalized precisely yet. On the other hand,
John has discovered that some [IT]{.smallcaps} controls he holds near
and dear aren't needed, because other parts of the organization are
adequately mitigating those risks.
"This is all about scoping what really matters inside of
[IT]{.smallcaps}. And like when Mr. Sphere told everyone in *Flatland*,
you must leave the realm of [IT]{.smallcaps} to discover where the
business relies on [IT]{.smallcaps} to achieve its goals." I hear him
continue, "Your mission is twofold: You must find where you've
under-scoped [IT]{.smallcaps}---where certain portions of the processes
and technology you manage actively jeopardizes the achievement of
business goals---as codified by Dick's measurements. And secondly, John
must find where he's over-scoped [IT]{.smallcaps}, such as all those
[SOX]{.smallcaps}-404 [IT]{.smallcaps} controls that weren't necessary
to detect material errors in the financial statements.
"You may think that we're mixing apples and oranges, but I assure you
that we are not," he continues. "Some of the wisest auditors say that
there are only three internal control objectives: to gain assurance for
reliability of financial reporting, compliance with laws and
regulations, and efficiency and effectiveness of operations. That's it.
What you and John are talking about are just different slides of what is
called the '[COSO]{.smallcaps} Cube.' "
I force myself to keep listening, furiously taking notes so I can Google
these terms later.
I hear him continue, "Here's what you and John need to do: Go talk to
the business process owners for the objectives on Dick's second slide.
Find out what their exact roles are, what business processes underpin
their goals, and then get from them the top list of things that
jeopardize those goals.
"You must understand the value chains required to achieve each of Dick's
goals, including the ones that aren't so visible, like those in
[IT]{.smallcaps}. For instance, if you were a cross-country freight
shipping company that delivers packages using a fleet of one hundred
trucks, one of your corporate goals would be customer satisfaction and
on-time delivery."
I hear him continue, "Everybody knows that one factor jeopardizing
on-time delivery is vehicle breakdowns. A key causal factor for vehicle
breakdowns is failure to change the oil. So, to mitigate that risk,
you'd create an [SLA]{.smallcaps} for vehicle operations to change the
oil every five thousand miles."
Obviously enjoying himself, he keeps explaining, "Our organizational key
performance indicator ([KPI]{.smallcaps}) is on-time delivery. So to
achieve it, you would create a new forward-looking [KPI]{.smallcaps} of,
say, the percentage of vehicles that have had their required oil changes
performed.
"After all, if only fifty percent of our vehicles are complying with the
required maintenance policies, it's a good bet that in the near future,
our on-time delivery [KPI]{.smallcaps}s are going to take a dive, when
trucks start getting stranded on the side of the road, along with all
the packages they're carrying.
"People think that just because [IT]{.smallcaps} doesn't use motor oil
and carry physical packages that it doesn't need preventive
maintenance," Erik says, chuckling to himself. "That somehow, because
the work and the cargo that [IT]{.smallcaps} carries are invisible, you
just need to sprinkle more magic dust on the computers to get them
running again.
"Metaphors like oil changes help people make that connection. Preventive
oil changes and vehicle maintenance policies are like preventive vendor
patches and change management policies. By showing how [IT]{.smallcaps}
risks jeopardize business performance measures, you can start making
better business decisions.
"Okay, one last thing before I go," he says. "Make sure John fulfills
his mission. He must talk with the finance side of the
[SOX]{.smallcaps}-404 audit team. He must learn exactly how the business
managed to dodge the last audit bullet and what the actual control
environment looks like and where reliance is really placed. And he must
then explain it to you.
"You'll be ready for your meeting with Dick when you've built out the
value chains, linking his objectives to how [IT]{.smallcaps} jeopardizes
it. Assembling concrete examples of how [IT]{.smallcaps} issues have
jeopardized those goals in the past. Make sure you're prepared."
And with that, he says, "In fact, feel free to invite me to that
meeting. I want to see Dick's face when you present what you learn," and
he hangs up the phone.
[]{#29-ch26.xhtml}
# Chapter 26 {.ch-title}
## • Friday, October 17 {.dateline}
*When Patty enters the conference room,* she gasps loudly when she sees
John's transformed appearance. "Oh my God, John. You look fantastic!"
Surprisingly, when Wes arrives, he doesn't seem to notice anything
different.
When everyone is here, I quickly share what I had learned from Erik. We
decide that Patty and I will start the business process-owner interviews
for "understanding customer needs and wants," "product portfolio," "time
to market," and "sales pipeline," while John will research the business
[SOX]{.smallcaps}-404 control environment, as directed by Erik.
It's Friday and we're scheduled to interview Ron Johnson, the
[VP]{.smallcaps} of Manufacturing Sales. I worked with him years ago as
part of the acquisition integration project and am surprised he's in
town. He's usually out and about, traveling the world, helping to
negotiate deals and save troubled accounts. He has a well-deserved
reputation as one of the most fun people in the company to travel with.
The size of his expense reports proves it.
Patty and I are sitting in front of his desk in Building 2. As we listen
to him bellow at his colleagues on a conference call, I look at the many
pictures of him on the wall: on golf courses, with his top sales people
in exotic locales from decades of President's Clubs, and shaking hands
with customers. In the corner is a fake potted tree, completely covered
with hundreds of conference badges and lanyards.
This is definitely the office of someone who loves being in front of
people. He's a large, gregarious guy with an even larger laugh.
Over many scotches with him one evening in Chicago, I was surprised to
learn that much of his demeanor is a carefully crafted persona. While
he's outwardly very loud and outspoken, he's actually an introvert by
nature, very analytic and passionate about sales discipline. Hearing him
chastise yet another person on the phone, I think about how odd it is
that even a discipline like sales, known for its chaotic and
unpredictable nature, is more predictable than [IT]{.smallcaps}.
There's at least a predictable funnel that comes from marketing
campaigns, generating prospects, leads, qualified leads, and sales
opportunities that leads to a sales pipeline. One sales person missing
their number rarely jeopardizes the entire department.
On the other hand, any of my engineers can get me fired by making a
seemingly small, harmless change that results in a crippling,
enterprise-wide outage.
Ron slams down the phone. "Sorry, guys. Despite all the training I do,
sometimes my team behaves like a bunch of wild animals," he says, still
exasperated. He rips the stapled document he's holding in two, and then
tosses it into his trash can.
"Oh man, Ron," I can't help but say. "Your recycling bin is right next
to you!"
"I'll be dead long before the landfills are full!" he says with a large
laugh.
He may be dead soon, but my kids won't be. As I explain to him why we're
here, I reach under the desk to grab the papers from the wastebasket,
putting them in the recycling bin. "You're listed as the owner of the
'sales pipeline' and 'sales forecast accuracy' measures on Dick's
spreadsheet. What can you tell me about the challenges of hitting those
numbers?"
"Look, I don't know much about [IT]{.smallcaps}. Someone on my staff
might be better for you to talk to," he responds.
"Don't worry, I'm not asking about anything [IT]{.smallcaps}-related.
Let's just talk about your measures," I assure him.
"Okay, it's your nickel..." he says. "If you want to talk about sales
forecast accuracy, you first need to know why it's so inaccurate. It
starts when Steve and Dick hand me a crazy revenue target, leaving me to
figure out how to deliver on it. For years, I've had to assign way too
much quota capacity to my team, so *of course* we keep missing our
numbers! I tell Steve and Dick this, year after year, but they don't
listen. Probably because they're having some arbitrary revenue target
jammed down their throats by the board.
"It's a crappy way to run a company. It demoralizes my team, and my top
performers are quitting in droves. Of course, we'll replace them, but it
takes at least a year for replacements to perform at full quota
capacity. Even in this lousy economy, it takes too long to find
qualified sales people.
"You know what chaps my hide?" he continues. "Sarah promised that
acquiring the retail stores would accelerate our sales. And has it
happened? Hell, no!
"We're completely screwing up the execution. This morning, a district
manager was screaming that they need truckloads of our new fuel injector
kits because all his stores are completely stocked out. We're losing the
easiest sales we can make! Our customers want to buy, but they're
walking out empty-handed, probably buying something crappier from one of
our competitors."
Ron says angrily, "We are clueless about what our customers want! We
have too much product that will never sell and never enough of the ones
that do."
His words sounding familiar, I look down at Dick's slide again. "You're
saying that 'sales forecast accuracy' is being jeopardized by our poor
grasp of 'understanding our customer needs and wants?' And that if we
know what products were out of stock in the stores, we could increase
sales?"
"You got it," he says. "With the traffic we get in the stores, that's
the fastest and easiest way to increase revenue. It's a lot easier than
dealing with the fickle whims of our large automotive buyers, that's for
sure."
I make a note to myself to find out how stockout data are generated, and
I see Patty furiously taking notes as well.
I ask Ron about the sales pipeline process and its challenges, and I get
an earful. He tells us at length how difficult it is for his managers to
get the reports they need out of our customer relationship management
system ([CRM]{.smallcaps}) and the endless battle to make sure his
entire sales force uses it in their daily work.
But the floodgates really open when I ask him what a bad day for him
looks like.
"A bad day?" he repeats, staring at me disapprovingly. "Why, Bill, it's
positively catastrophic when the [MRP]{.smallcaps} and phone systems
that you manage go down like they did a few weeks ago. For just the
[MRP]{.smallcaps} outage, we had customers screaming about delayed
orders, and two of them canceled a quarter-million dollars of orders
outright. We're scrambling to keep some of our best customers from
putting \$1.5 million of contracts up for rebid."
He leans across his desk. "And when the phones went down in the last few
days of the quarter, and customers couldn't give us orders or make
last-minute changes! That's delayed another \$1.5 million of orders, and
ten customers are reevaluating their contracts, putting another \$5
million of contracts at risk."
"You're making my job much, much harder, pal," he says. "A lot of my
sales people missed their quota by the tiniest fractions, due to things
totally outside of their control. To keep morale up, I'm demanding Steve
give quota credit for any order that was delayed because of our
screwups."
I grimace. Steve's going to love that idea as much as he loved Sarah
giving away vouchers to disgruntled Phoenix customers.
"I'm really sorry that happened on my watch. There's no excuse for it,"
I say sincerely. I tell him what happened with the vendor making the
unauthorized change to the phone switch, and the steps we're taking to
ensure that it doesn't happen again.
I explain, "We have change control policies, but as you know, training
and trust only go so far---at some point, we need monitoring to enforce
those policies. The trouble is, we need to expand the licensing beyond
what Information Security has deployed, and emergency capital is hard to
get these days. Especially for [IT]{.smallcaps} Operations."
Ron turns bright red. "Why? What are they saving it for? Probably
another harebrained acquisition that Sarah is dreaming up." He laughs
humorlessly. "How much money are we talking about?"
When I tell him, he looks disgusted. "We spend more money watering the
lawns at the manufacturing plants every week! Dick is going to hear from
me about this. If he's not willing to spend money, we may lose
orders---even if your project is just insurance so we can collect on all
the hard work my sales team does---it's a no-brainer!"
"We sure think so. Thanks for the support," I say. "We're about out of
time. Are there any other challenges or impediments that we can help
with?"
He looks at his watch for a moment. "No, just keep those vendors from
crashing our phone systems again, you hear?"
Patty looks invigorated as she flips through all her notes by the
elevator banks. She says, "Ron mentioned how critical the phones and the
[MRP]{.smallcaps} systems are, but I'm sure there's more, like the
inventory management systems. I'll work on creating the complete list of
applications and infrastructure that support Ron. If any of them are
fragile, we need to get them added to our replacement list. This is a
great opportunity to be proactive."
"You read my mind," I say, smiling. "That preventive work supports the
most important objectives of the company. How do we know? We started
from the measures that Dick cares about most."
I'm pleased. Now I'm really looking forward to our next interview, which
is with Maggie Lee, who sponsored Phoenix.
Patty and I meet with Maggie on the following Monday. Over the weekend,
Sarah e-mailed me, demanding to know the agenda for the meeting,
threatening to cancel it. When I start copying Dick and Steve on my
replies, she relents, but warns me not to meddle with her department.
I'm not worried. Both Patty and I work with Maggie regularly. She's the
business sponsor of over half the [IT]{.smallcaps} projects. Among other
things, Maggie is responsible for making sure that the company has the
best possible assortment of merchandise in each of our stores, and she
owns the category and pricing roadmaps.
In describing her responsibilities, she summarizes, "Ultimately, the way
I measure our understanding of customer needs and wants is whether
customers would recommend us to their friends. Any way you cut it, our
metrics aren't very good."
When I ask why, she sighs. "Most of the time, we're flying blind.
Ideally, our sales data would tell us what customers want. You'd think
that with all the data in our order entry and inventory management
systems, we could do this. But we can't, because the data are almost
always wrong."
Patty glances my way meaningfully as Maggie continues, "Our data quality
is so bad that we can't rely on it to do any sort of forecasting. The
best data that we have right now comes from interviewing our store
managers every two months and the customer focus groups we do twice a
year. You can't run a billion-dollar business this way and expect to
succeed!
"At my last job, we received sales and stockout reports every day," she
continues. "Here, we get them once a month from Finance, but they're
full of errors. What do you expect? They're done by a bunch of college
interns, copying and pasting numbers between a million spreadsheets."
"If you could wave a magic wand, what would you do instead?" I ask.
"How big of a magic wand?" she asks.
"It can do anything you want," I reply, smiling.
"That's a big magic wand," she says, laughing. "I want accurate and
timely order information from our stores and online channels. I want to
press a button and get it, instead of running it through the circus
we've created. I'd use that data to create marketing campaigns that
continually do [A/B]{.smallcaps} testing of offers, finding the ones
that our customers jump at. When we find out what works, we' d replicate
it across our entire customer list. By doing this, we' d be creating a
huge and predictable sales funnel for Ron.
"I'd use that information to drive our production schedule, so we can
manage our supply and demand curves. We' d keep the right products on
the right store shelves and keep them stocked. Our revenue per customer
would go through the roof. Our average order sizes would go up. We' d
finally increase our market share and start beating the competition
again."
As she's telling us this, she looks animated and excited. Then her
exuberance disappears. Sounding defeated, she says, "But we're stuck
with the systems we have, unfortunately."
"Wait a second. I thought Phoenix was supposed to fix all this?" I ask.
She snorts in disgust. "All we've gotten from Phoenix is a bunch of
promises. It was supposed to do a lot of this reporting, but there's so
much political pressure to ship something, they keep dropping features.
And guess which feature they're delaying until sometime next year?" She
rolls her eyes in disbelief.
"Reporting?" I guess, fearing the worst.
When Maggie nods, I try to stay upbeat. "For now, let's assume that the
magic wand worked. We now have great data coming out of the stores.
You're keeping the right products in the stores, and the campaigns
you're dreaming up are succeeding beyond your wildest dreams. What
then?"
"Life gets exciting, that's what!" she says, her eyes lighting up. "Last
year, we shipped a custom fuel injection system for a new upcoming
sports car. We had just six months to get this to market, from the
drawing board to the shelves. We nailed it! The designers,
[R&D]{.smallcaps} folks, and Marketing all kicked ass. We had the right
product, right place, right brand, right price, and right quality. It
was one of the best-selling products of the year.
"We took a risk and won big," she says. "If we had better visibility
into our retail operations, with our amazing [R&D]{.smallcaps} and
manufacturing capabilities, we could make fifty of those bets per year.
I'd bet four of those would be runaway hits! We' d not only be
profitable, we' d be insanely profitable."
Patty interjects, "What's an acceptable time to market for your
products?"
She responds quickly, "These days? Products need to ship in six months.
Nine months, tops. Otherwise, some Chinese company will steal our idea,
have them on our competitors store shelves, and take the majority of the
market.
"In these competitive times, the name of the game is quick time to
market and to fail fast. We just can't have multiyear product
development timelines, waiting until the end to figure out whether we
have a winner or loser on our hands. We need short and quick cycle times
to continually integrate feedback from the marketplace.
"But that's just half the picture," she continues. "The longer the
product development cycle, the longer the company capital is locked up
and not giving us a return. Dick expects that on average, our
[R&D]{.smallcaps} investments return more than ten percent. That's the
internal hurdle rate. If we don't beat the hurdle rate, the company
capital would have been better spent being invested in the stock market
or gambled on racehorses.
"When [R&D]{.smallcaps} capital is locked up as [WIP]{.smallcaps} for
more than a year, not returning cash back to the business, it becomes
almost impossible to pay back the business," she continues.
Holy crap. Maggie is starting to sound eerily like Erik, too. The need
to continually reduce cycle times is part of the First Way. The need for
amplification of feedback loops, ideally from the customer, is part of
the Second Way.
But nine months to return cash back to the company, tops? We've been at
Phoenix for nearly three years and it still hasn't created the desired
business value.
I have a terrible feeling that we may be going about Phoenix entirely
the wrong way...
Looking at my watch, I see that we're almost out of time. Putting the
thoughts of Phoenix aside, I ask Maggie about other ways that
[IT]{.smallcaps} is impeding the achievement of her goals.
Her expression darkens. "Well, there is one more thing..."
Maggie then describes the intense competition for [IT]{.smallcaps}
project resources. "Our planning horizon is six to twelve months. How
does anyone know what projects they should be working on three years
from now?" she says angrily, suddenly reminding me of Ron.
Nothing unifies people better than complaining about [IT]{.smallcaps}.
"I completely understand your frustration," I say stoically. "You have
any ideas on how to fix it?"
She shares a bunch of ideas about hiring more [IT]{.smallcaps} people,
dedicating [IT]{.smallcaps} people to her group, putting more scrutiny
on the projects that are clogging the [IT]{.smallcaps} project queue,
and so forth.
Most of the ideas aren't new, and I merely raise my eyebrows at the
notion of a larger [IT]{.smallcaps} budget. Steve and Dick will never go
for that.
------------------------------------------------------------------------
*"Incredible!" Patty exclaims,* as we leave Maggie's office. "I can't
believe how frustrated Maggie and Ron are. Can you believe that
unreliable data in the order entry and inventory management systems came
up again? And I can't believe that Phoenix, as it's currently designed,
won't actually fix the data quality problems!"
I nod and say decisively, "Get a meeting together with John and Wes.
We'll show them what we've learned so far. Invite Chris, as well. This
goes beyond just [IT]{.smallcaps} Operations. This may change how we
prioritize and develop our applications, too."
As she leaves, I look at my Phoenix calculations again.
We've spent over \$20 million on Phoenix over three years. With all that
[WIP]{.smallcaps} and capital locked inside the project, it will likely
never clear the ten percent internal hurdle rate. In other words,
Phoenix should not have been approved.
[]{#30-ch27.xhtml}
# Chapter 27 {.ch-title}
## • Tuesday, October 21 {.dateline}
*I'm in a conference room* with Patty, Wes, Chris, and John to share the
progress Patty and I have made.
I begin by stating, "We interviewed Ron and Maggie, the business process
owners on Dick's company measurements slide. I've spent some time
thinking about what we've learned."
I dig out my notes and walk to the whiteboard, writing out, "Parts
Unlimited desired business outcomes: increase revenue, increase market
share, increase average order size, restore profitability, increase
return on assets."
Then I draw the following table:
::: image

:::
Pointing at the whiteboard, I say, "The first column names the business
capabilities and processes needed to achieve Dick's desired outcomes;
the second column lists the [IT]{.smallcaps} systems that those business
processes rely upon; the third column lists what can go wrong with
either the [IT]{.smallcaps} systems or data; and in the fourth column,
we'll write down the countermeasures to prevent those bad things from
happening, or at a minimum, detect and respond."
For the next half hour, I walk them through the table and all the
grievances. "Apparently, for the things that Dick cares about most,
[IT]{.smallcaps} matters." I say, deadpan. Wes says, "Come on. I'm not
the smartest guy in the room by any stretch. But, if we're so important,
why are they trying to outsource all of us? Face it, we've been moved
from one foster home to another for decades."
None of us have a good answer.
"You know, I really like Bill's third column: 'business risk due to
[IT]{.smallcaps},' " John says. "By describing what could go wrong in
[IT]{.smallcaps} that prevents the business outcome from being achieved,
we're helping the business process owners get their bonuses. This should
be *very* persuasive. We may even be thanked by the business for doing
all this work, which would be a refreshing change."
"I agree. Nice job, Bill," Chris says, finally. "But what's the
solution?"
I say, "Anyone have any ideas?"
Surprisingly, John speaks up first. "Seems pretty obvious to me. We need
to come with the controls to mitigate the risks in your third column. We
then show this table to Ron and Maggie, and make sure they believe that
our countermeasures help them achieve their objectives. If they buy it,
we work with them to integrate [IT]{.smallcaps} into their performance
measures...
"That example Erik gave you is perfect. They integrated 'compliance with
vehicle maintenance procedures' as a leading indicator for 'on-time
delivery' and 'customer retention.' We need to do the same."
We roll up our sleeves and get to work.
For the phone and [MRP]{.smallcaps} systems, we quickly establish that
the predictive measures include compliance with the change management
process, supervision and review of production changes, completion of
scheduled maintenance, and elimination of all known single points of
failure.
When we tackle 'customer needs and wants," we get stuck.
It's John who gets us rolling again. "Here, the objective isn't system
availability, it's the integrity of data, which, incidentally, form two
of the three legs of the 'confidentiality, integrity, and availability
triangle' or [CIA]{.smallcaps}." He asks Chris, "So, what's causing the
data integrity issues?"
Chris snorts in disgust. "Phoenix fixes a bunch of them, but we still
have issues. Most of them are caused upstream, because the Marketing
people keep putting in malformed inventory [SKU]{.smallcaps}s. Marketing
needs to get their crap together, too."
So for 'marketing needs and wants,' our proposed measurements include
ability for Phoenix to support weekly and eventually daily reporting,
percentage of valid [SKU]{.smallcaps}s created by Marketing, and so
forth.
By the end of the day, we've generated a slide deck that Patty and I
will take back to Ron and Maggie, which we'll then present to Dick.
"Now that, my friends, is a solid proposal," Wes says, proudly. With a
loud laugh, he says, "Even a monkey could follow the dots we just
connected!"
Over the next day, Patty and I get great feedback from Ron and Maggie,
and they commit to supporting our proposal with Dick. When Ron learns
that we still haven't been granted budget for our monitoring project, he
calls up Dick right in front of us, leaving him a heated voicemail,
demanding to know why he's dragging his feet.
With all this enthusiastic support, I figure our Thursday meeting with
Dick will be a slam dunk.
------------------------------------------------------------------------
*"All you've told me* is that you're completely asleep at the wheel!"
Dick says sternly, obviously unimpressed by what I've presented.
Suddenly, I'm reminded of how Steve didn't even look at the spreadsheets
I had prepared for him when I asked him to prioritize Phoenix and the
audit finding work.
But Dick isn't being dismissive. He's actually angry. "You're telling me
something a nutless monkey could have figured out. You didn't know these
measurements were important? At every town hall meeting, Steve repeats
them over and over. It's in our company newsletters, it's what Sarah
talks about in every one of her strategy briefings. How could you all
miss something so important?"
I see Chris and Patty fidget on either side of me as we sit across the
table from Dick. Erik is standing by the window, leaning against the
wall.
I have a flashback to when I was Marine sergeant, holding the flag on
parade. Out of nowhere, a colonel appeared, growling at me in front of
my entire unit, "That's an out of regulation watch band, Sergeant
Palmer!" I could have died on the spot from embarrassment, because I
knew I had screwed up.
But today, I'm certain I understand the mission, and for the company to
succeed I need Dick to understand what I've just learned. But how?
Erik clears his throat, and says to Dick, "I agree a nutless monkey
should have figured this out. So, Dick, explain why on that little
measurement spreadsheet of yours, you list four levels of management for
each of your measurements but nowhere are there any [IT]{.smallcaps}
managers listed. Why?"
Not waiting for Dick to respond, he continues, "Every week,
[IT]{.smallcaps} people get dragged into fire drills at the last minute
by managers trying to achieve those measurements---just like Brent was
pulled in to help launch Sarah's latest sales promotion." Erik pauses
and says, "Quite frankly, I think you're just as much of a nutless
monkey as Bill."
Dick grunts but doesn't seem perturbed. He finally says, "Maybe so,
Erik. You know, five years ago, we used to have our [CIO]{.smallcaps}
attend our quarterly business reviews, but he never opened his mouth
except to tell us that everything we proposed was impossible. After a
year of that, Steve stopped inviting him."
Dick turns back to me. "Bill, you're telling me that everyone could do
everything right in the business, but because of these [IT]{.smallcaps}
issues, we would all still miss these objectives?"
"Yes, sir," I say. "The operational risks posed by [IT]{.smallcaps} need
to be managed just like any other business risk. In other words, they're
not [IT]{.smallcaps} risks. They're business risks."
Again, Dick grunts. He slumps in his chair, rubbing his eyes. "Shit. How
the hell are we supposed to write an [IT]{.smallcaps} outsourcing
contract if we don't even know what the business needs?" he says,
slamming his hand on the table.
He then asks, "Well, what's your proposal? You've got one, I presume?"
I sit upright and begin the pitch that I've rehearsed so many times with
the team. "I'd like three weeks with each of the business process owners
on that spreadsheet. We need to get the business risks posed by
[IT]{.smallcaps} better defined and agreed upon and then propose to you
a way to integrate those risks into leading indicators of performance.
Our goal is not just to improve business performance but to get earlier
indicators of whether we're going to achieve them or not, so we can take
appropriate action.
"Furthermore," I continue. "I'd like to schedule a single topic meeting
with you and Chris about Phoenix," then explaining my concerns how
Phoenix as defined should not even have been approved.
I continue, "We're going way too slowly, with too much [WIP]{.smallcaps}
and too many features in flight. We need to make our releases smaller
and shorter and deliver cash back faster, so we can beat the internal
hurdle rate. Chris and I have some ideas, but it will look very
different than our current plan of record."
He remains silent. Then decisively, he declares, "Yes on both of your
proposals. I'll assign Ann to help. You need the best talent in the
company."
Out of the corner of my eye, I see Chris and Patty smile.
"Thank you, sir. We'll make it so," I say, standing up and pushing
everyone out of the room, before Dick changes his mind.
As we walk out of his office, Erik claps his hand on my shoulder. "Not
bad, kid. Congratulations on being well on your way to mastering the
First Way. Now help John get there, because you're going to have your
hands full tackling the Second Way."
Confused, I ask, "Why? What's going to happen?"
"You'll find out soon enough," Erik says with a chuckle.
------------------------------------------------------------------------
*On Friday, John convenes a meeting* with Wes, Patty, and me, promising
some fantastic news. He says effusively, "You guys did fantastic work
linking [IT]{.smallcaps} to Dick's operational objectives. I've finally
learned how we dodged the audit bullet, and I'm pretty sure we can do
something equally fantastic to reduce our audit and compliance
workload."
"Doing less audit work?" Wes says, looking up, putting his phone down.
"I'm all ears!"
He has my attention, too. If there were some way to get audit off our
backs without another Bataan Death March, it would be nothing short of a
miracle.
He turns toward Wes and Patty. "I needed to figure out how we escaped
all the findings from the internal and external auditors. At first, I
thought it was just the audit partner bending over backward to retain us
as a client. But that wasn't it at all...
"I got in front of everyone from the Parts Unlimited team who was at
that meeting, trying to figure out who had the magic bullet. To my
surprise, it wasn't Dick or our corporate counsel. Ten meetings later, I
finally found Faye, a Financial Analyst who works for Ann in Finance.
"Faye has a technical background. She spent four years in
[IT]{.smallcaps}," he says, as he hands out papers to each of us. "She
created these [SOX]{.smallcaps}-404 control documents for the finance
team. It shows the end-to-end information flow for the main business
processes in each financially significant account. She documented where
money or assets entered the system and traced it all the way to the
general ledger.
"This is pretty standard, but she took it one step further: She didn't
look at any of the [IT]{.smallcaps} systems until she understood exactly
where in the process material errors could occur *and* where they would
be detected. She found that most of the time, we would detect it in a
manual reconciliation step where account balances and values from one
source were compared to another, usually on a weekly basis.
"When this happens," he says, with awe and wonder in his voice, "she
knew the upstream [IT]{.smallcaps} systems should be out of scope of the
audit."
"Here's what she showed the auditors," John says, excitedly flipping to
the second page. "Quote: 'The control being relied upon to detect
material errors is the manual reconciliation step, not in the upstream
[IT]{.smallcaps} systems.' I went through all of Faye's papers, and in
every case, the auditors agreed, withdrawing their [IT]{.smallcaps}
finding.
"That's why Erik called the pile of audit findings a 'scoping error.'
He's right. If the audit test plan was scoped correctly in the
beginning, there wouldn't have been any [IT]{.smallcaps} findings!" he
concludes.
John looks around as Patty, Wes, and I stare blankly at him.
I say, "I'm not following. How does this relate to reducing the audit
workload?"
"I'm rebuilding our compliance program from scratch, based upon our new
understanding of precisely where we're relying our controls," John says.
"That dictates what matters. It's like having a magic set of glasses
that can differentiate what controls are earth-shatteringly important
versus those that have no value at all."
"Yes!" I say. "Those 'magic glasses' helped us finally see what matters
to Dick for company operations. It was right in front of us for years,
but we never saw it."
John nods and smiles broadly. He flips to the last page of the handout.
"I'm proposing five things that could reduce our security-related
workload by seventy-five percent."
What he presents is breathtaking. His first proposal drastically reduces
the scope of the [SOX]{.smallcaps}-404 compliance program. When he
verbalizes so precisely why it's safe to do, I realize that John too is
also mastering the First Way, having truly achieved a "profound
appreciation of the system."
His second proposal requires that we find out how production
vulnerabilities got there in the first place and that we ensure that
they don't happen again by modifying our deployment processes.
His third proposal requires that we flag all the systems in the scope
for compliance audits in Patty's change management process---so we can
avoid changes that could jeopardize our audits---and that we create the
on-going documentation that the auditors will ask for.
John looks around, seeing all of us staring at him in shocked silence.
"Did I say something wrong?"
"No offense, John..." Wes says slowly. "But...uh... You feeling okay?"
I say, "John, I don't think you'll get any objections from my team on
your proposals. I think they're great ideas." Wes and Patty vehemently
nod in agreement.
Looking pleased, he continues, "My fourth proposal is to reduce the size
of our [PCI]{.smallcaps} compliance program by getting rid of anything
that stores or processes cardholder data, which is like toxic waste.
Losing or mishandling it can be lethal, and it costs too much to
protect.
"Let's start with the asinine cafeteria point of sale system. I never
want to do another security review of that piece of crap. Frankly, I
don't care who takes it, even if it's Sarah's cousin Vinnie. It's gotta
go."
Patty has one hand covering her mouth, and even Wes' jaw is on the
table. Has John completely lost his mind? This proposal
seems...potentially reckless.
Wes thinks for a moment, and changes his mind. "I love it! I wish we
could have gotten rid of it years ago. We've spent months securing that
system for those audits. It even went into scope for the
[SOX]{.smallcaps}-404 audits because it talked to the payroll systems!"
Patty eventually nods. "I suppose no one would argue that the cafeteria
[POS]{.smallcaps} is a core competency. It doesn't help our business but
can definitely hurt it. And it pulls scarce resources from Phoenix and
our in-store [POS]{.smallcaps} systems, which are definitely part of our
core competencies."
"Okay, John, let's do it. You're batting four out of four," I say,
decisively. "But do you really think we can get rid of it in time to
make a difference?"
"Yep," John says, smiling confidently. "I've already talked with Dick
and the legal team. We just need to find a suitable outsourcer and
convince ourselves that they can be trusted to maintain and secure the
systems and data. We can outsource the work but not the responsibility."
Wes interjects hopefully, "Can you do something about getting Phoenix
out of scope of the audits, too?"
"Over my dead body," John says flatly, crossing his arms. "My fifth and
last proposal is that we pay down all the technical debt in Phoenix,
using all the time we've saved from my previous proposals. We know
there's a huge amount of risk in Phoenix: strategic risk, operational
risk, huge security and compliance risk. Almost all of Dick's key
measures hinge on it.
"As Patty said, our order entry and inventory management systems *are* a
core competency. We're relying on it to give us a competitive edge, but
with all the shortcuts we've taken with it, it's like a powder keg
waiting to blow up."
Wes sighs, looking annoyed. *Bad old John is back*, his expression says.
I disagree. This John is far more complex and nuanced than the old John.
In the span of a couple of minutes, he's been willing to take bigger,
almost reckless, risks from outsourcing our cafeteria [POS]{.smallcaps}
systems to his unyielding and categorical insistence that we secure and
harden Phoenix.
I like this new John.
"You're absolutely right, John. We've got to pay down technical debt," I
say firmly. "How do you propose we do it?"
We quickly agree to pair up people in Wes' and Chris' group with John's
team, so that we can increase the bench of security expertise. By doing
this, we will start integrating security into all of our daily work, no
longer securing things after they're deployed.
John thanks everyone, indicating that we've covered everything on his
agenda. I look at my watch. We're done thirty minutes early. This must
be a new world record for the shortest time required to agree on
anything security-related.
[]{#31-ch28.xhtml}
# Chapter 28 {.ch-title}
## • Monday, October 27 {.dateline}
*On my drive into work,* I have to turn on my seat heaters months
earlier than usual.
I hope this winter won't be as awful as last year. Paige's relatives,
the most skeptical people I've ever met, have started wondering whether
there actually might be something to this global climate change thing,
after all.
When I get to my office, I take my laptop out of my bag, smiling at how
quickly it powers on. As I write up a report for Steve on how far we've
come in the last six weeks, I don't put in anything about my new laptop,
but I want to.
To me, the laptop represents everything my team has achieved together.
I'm incredibly proud of them. Life feels different now. The number of
Sev 1 outages this month is down by more than two-thirds. Incident
recovery time is down, too, probably by more than half.
The insight we've gained from that first strange meeting with Dick and
John tells me that we're hot on the trail of understanding how we can
really help the business win.
Opening up my e-mail, I see a note from Kirsten. All her project
managers are gushing about how projects are flowing so much faster. The
number of tasks waiting for Brent and the rest of [IT]{.smallcaps}
Operations is way down. In fact, if I'm reading the report correctly,
Brent is almost caught up.
On the project front, we're in fantastic shape---especially with
Phoenix.
There's another Phoenix deployment scheduled for Friday. It's only a
bunch of defect fixes, with no major functionality added or changed, so
it should be much better than last time. We've completed all of our
deliverables on time, but as usual, there are still a million details
that still need to be worked out.
I'm grateful that my team can stay so focused on Phoenix, because we've
stabilized our infrastructure. When the inevitable outages and incidents
do occur, we're operating like a well-oiled machine. We're building a
body of tribal knowledge that's helping us fix things faster than ever,
and, when we do need to escalate, it's controlled and orderly.
Because of our ever-improving production monitoring of the
infrastructure and applications, more often than not, we know about the
incidents before the business does.
Our project backlog has been cut way down, partially from eradicating
dumb projects from our queue. And John has delivered. We've cut a bunch
of unneeded security projects from our audit preparation and remediation
work, replacing them with preventive security projects that my entire
team is helping with. By modifying our development and deployment
processes, we're hardening and securing both the applications and
production infrastructure in a meaningful and systematic way. And we're
gaining confidence that those defects will never happen again in the
future.
Our change management meetings are going more smoothly and regularly
than ever. We not only have visibility into what our teams are doing,
but work is really flowing.
More than ever, people know exactly what they should be working on.
People are getting satisfaction out of fixing things. I'm hearing that
people are feeling happier and more upbeat, because they can actually do
their jobs.
It's strange how much more clearly I see the [IT]{.smallcaps} world now
and how differently it looks to me than even a couple of months ago.
Patty's experiments with establishing kanbans around Brent are a
success. We're also finding instances of work going backward to Brent,
because we didn't understand or didn't sufficiently specify some task or
outcome, requiring Brent to translate or fix it.
When this happens now, we quickly jump on it to make sure that it
doesn't happen again.
And it's not just Brent's work that we're improving. By reducing the
number of projects in flight, we're keeping clear lanes of work, so work
can go from one work center to the other quickly, getting completed in
record time.
We've all but emptied our ticketing system of outdated work. In one
case, we even found a ticket that Wes put in over ten years ago as a
junior engineer, referring to some task for a machine that has been long
since decommissioned. Now we have confidence that all work in the system
is important and actually has a prayer of being completed.
We are no longer the Bates Motel of work.
Against my staff's expectations, we keep bumping up the number of
projects we think we can handle concurrently. Because we have a better
idea of what our flows of work are, and managing carefully which ones
are allowed to go to Brent, we're finding that we can keep releasing
more projects without impacting our existing commitments.
I no longer think of Erik as a raving madman, but he's eccentric, for
sure. Now that I've seen the results with my own eyes in my own
organization, I know that [IT]{.smallcaps} Operations work is very
similar to plant work. Erik has stated repeatedly that our improvements
to date are only the tip of the iceberg.
Erik says that we are starting to master the First Way: We're curbing
the handoffs of defects to downstream work centers, managing the flow of
work, setting the tempo by our constraints, and, based on our results
from audit and from Dick, we're understanding better than we ever have
what is important versus what is not.
At the end, I led the retrospective portion, where we self-assessed how
we did and the areas that we should improve. When someone mentioned that
we should start inviting people from Development when we do our outage
postmortem root cause analysis meetings, I realized that we are now also
well on our way to understanding Erik's Third Way, as well.
As Erik keeps reminding me, a great team performs best when they
practice. Practice creates habits, and habits create mastery of any
process or skill. Whether it's calisthenics, sports training, playing a
musical instrument, or in my experience, the endless drilling we did in
the Marines. Repetition, especially for things that require teamwork,
creates trust and transparency.
Last week, as I sat through our latest biweekly outage drill, I was very
impressed. We were getting very good at this.
I feel certain that if the payroll failure that happened on my first day
of the job happened now, we could complete the entire payroll run---not
just the salaried staff, but the hourly staff, as well.
John quickly got the approval from Dick and Steve to have an outsourcer
to take over the cafeteria [POS]{.smallcaps} systems and replace it with
something commercially supported.
It was a fascinating exercise for Wes, Patty, and me to work with John
to put together the outsourcing requirements for the cafeteria
[POS]{.smallcaps} systems. As part of the due diligence process, we were
going to hear from all the prospective outsourcers all the dogmas we
used to believe before all our interactions with Erik. It will be
interesting to see if we can retrain them.
It seems to me that if anyone is managing [IT]{.smallcaps} without
talking about the Three Ways, they are managing [IT]{.smallcaps} on
dangerously faulty assumptions.
As I'm pondering this, my phone rings. It's John.
When I answer, he says, "My team discovered something troubling today.
To prevent unauthorized black market [IT]{.smallcaps} activities from
cropping up, we've started routinely reviewing all the proposed projects
coming into Kirsten's Project Management Office. We also search all the
corporate credit cards for recurring charges that might be for online or
cloud services---which is just another form of unauthorized
[IT]{.smallcaps}. Some people are going around the project freeze. You
have time to talk?"
"Let's meet in ten minutes," I say. "Don't leave me hanging. Who's
trying to backdoor the system?"
I hear John laugh on the other end of the line. "Sarah. Who else?"
------------------------------------------------------------------------
*I invite Wes and Patty* to the impromptu meeting but only Patty can
make it.
John starts presenting what he found. Sarah's group has four instances
of using outside vendors and online services. Two are relatively
innocuous but the others are more serious: she has contracted a vendor
for a \$200,000 project to do customer data mining and another vendor to
plug into all our [POS]{.smallcaps} systems to get sales data for
customer analytics.
"The first problem is that both projects violate the data privacy policy
that we've given our customers," John says. "We repeatedly promise that
we will not share data with partners. Whether we change that policy or
not is, of course, a business decision. But make no mistake, if we go
ahead with the customer data mining initiative, we're out of compliance
with our own privacy policy. We may even be breaking several state
privacy regulations that expose us to some liability."
This doesn't sound good, but John's tone of voice suggests there's worse
to come. "The second problem is that Sarah's vendor uses the same
database technology that we used for our cafeteria [POS]{.smallcaps}
system, which we know is virtually impossible to secure and maintain
support for in production, if and when it becomes a part of daily
operations."
I feel my face get red hot. It's not just about another cafeteria
[POS]{.smallcaps} system that we'll need to retrofit for production.
It's because applications like this contribute to our inaccurate sales
order entry and inventory management data. We have too many cooks in the
kitchen and no one accountable for maintaining the integrity of the
data.
"Look, I don't care about Sarah's project management and invoicing
tools---if it makes them more productive, let them use it," I say. "It's
probably safe as long as it doesn't interface with an existing business
system, store confidential data, affect financial reporting, or
whatever. But if it does, then we need to be involved and at least
confirm that it doesn't impact any of our existing commitments."
"I agree," John says, "Want me to take the first stab at that outsourced
[IT]{.smallcaps} service policy document?"
"Perfect," I say. But with less certainty, I continue, "Although, what's
the right way to handle Sarah? I feel completely out of my league. Steve
constantly protects her. How do we convey to him the potential mayhem
she's causing with her unauthorized projects?"
Making sure John's office door is closed, I say to John and Patty "Guys,
help me out. What does Steve see in her? How does she get away with so
much crap? Over the past couple of weeks, I see how hard-nosed Steve can
be, but Sarah routinely gets away with murder. Why?"
Patty snorts. "If Steve were a woman, I'd say that he's attracted to
dangerous men. A bunch of us have speculated about this for years. I've
had a theory, which I must say, was pretty much validated in our last
off-site."
When she sees John and me both conspiratorially leaning forward, she
smiles. "Steve prides himself on being an operations guy, and he's
admitted several times in company meetings that he doesn't have a flair
for strategy. I think that's why he loved working with his old boss and
our new chairman Bob so much. For a decade, Bob was the strategy guy,
and all Steve had to do was execute the vision.
"For years, Steve searched for a strategy person to be his right-hand
man. He went through quite a few people, even setting a couple
executives against each other in this awful, drawn out competition.
Pretty Machiavellian," she continues. "And Sarah won. The word on the
street was that there was a lot of backstabbing and underhanded tactics,
but I suppose that's what it takes to come out on top. Evidently, she
has mastered how to whisper the right things in his ear, reinforcing his
paranoia and aspirations."
Patty's explanation is so much more sophisticated than anything I've
come up with. In fact, it sounds strikingly similar to what Paige would
speculate when I got that distant, angry look at dinnertime.
John says awkwardly, "Umm, you don't think there's anything between
them, do you? Like, anything...untoward?"
I raise my eyebrows. I wondered about that, too.
Patty just bursts out laughing. "I'm a pretty good judge of people. Both
my parents were psychologists. I'd eat both of their diplomas if that
were true."
Seeing the expression on my face, she laughs even harder. "Look, not
even Wes believes that, and there's no one better at manufacturing drama
than him. Sarah's *scared to death* of Steve! You ever notice that when
someone is talking, Sarah is always still looking at Steve, trying to
gauge his reaction? It's freakish, actually."
She continues, "Steve has a blind spot for Sarah's shortcomings, because
she has something he needs and admires, which is the ability to come up
with creative strategies, regardless of whether the strategy is good or
bad. On the other hand, because Sarah is so insecure, she'll do whatever
it takes to not look bad.
"She simply doesn't care about the body count she leaves in her wake,
because she wants to be the next [CEO]{.smallcaps} of Parts Unlimited."
Patty says. "And apparently, Steve does too. He's been grooming her as
his successor for years."
"What? She could be our next [CEO]{.smallcaps}?" I exclaim in shock,
quickly wiping up the coffee I spit out onto John's conference table.
"Wow, boss. You don't hang out at the water cooler much, do you?" Patty
says.
------------------------------------------------------------------------
*It's Phoenix deployment day,* and I've missed Halloween with my kids.
It's already 11:40 p.m. As we're standing once again around the
[NOC]{.smallcaps} conference table, I have an unsettling feeling of déjà
vu. I count fifteen people here, including Chris and William.
Most people are tensely huddled around the table with laptops open,
pizza boxes and candy wrappers piled behind them. Several other people
are at the whiteboard, pointing at checklists or diagrams.
It took three hours longer than scheduled to migrate Phoenix into the
[QA]{.smallcaps} test environment and get all the tests to pass.
Although this is much better than the previous deployment, I thought we'
d have fewer problems, given how hard we worked on improving the
deployment process,
By 9:30 p.m., we were finally ready to do the migration into production.
All the tests had finally passed, and Chris and William gave the
thumbs-up to deploy. Wes, Patty, and I looked at the test reports, and
gave the green light to start the deployment work.
Then all hell broke loose.
One of the critical database migration steps failed. We had only
completed thirty percent of the deployment steps, and once again, we
were dead in the water. Due to the database changes and the scripts
already run, it wasn't possible to roll back in the time remaining
before the stores opened tomorrow morning.
Once again, we had to fight our way forward, trying to get to the next
step so the deployment could resume.
Leaning against the wall, I watch everyone work, arms crossed, trying
not to pace. It's frustrating that once again we are grappling with
another Phoenix deployment going bad, with potentially disastrous
outcomes.
On the other hand, compared to last time, things are much calmer. While
there is tension, and a lot of heated arguments, everyone is intensely
focused on problem solving. We've already notified all the store
managers about our progress, and they all have manual fallback
procedures ready, just in case the [POS]{.smallcaps} systems are down
when the stores open.
I see Wes say something to Brent, stand up to rub his forehead wearily,
and then walk toward me. Chris and William also get up and follow him.
I meet them halfway. "Well?" I ask.
"Well," Wes replies when he's close enough to speak softly and be heard.
"We've found our smoking gun. We just discovered that Brent made a
change to the production database a couple of weeks ago to support a
Phoenix business intelligence module. No one knew about it, let alone
documented it. It conflicts with some of the Phoenix database changes,
so Chris' guys are going to need to do some recoding."
"Shit," I say. "Wait. Which Phoenix module?"
"It's one of Sarah's projects that we released after the project freeze
was lifted," he replies. "It was before we put the kanban around Brent.
It was a database schema change that slipped through the cracks."
I swear under my breath. Sarah *again*?
Chris has a pinched expression on his face. "This is going to be tricky.
We're going to have to rename a bunch of database columns, which will
affect, who knows, maybe hundreds of files. And all the support scripts.
This is going to be manual work and very error-prone."
He turns to William. "What can we do to at least get some basic testing
performed before we continue the deployment?"
William looks vaguely ill, wiping sweat from his face with his hands.
"This is very, very...dicey... We can test, but we still may not find
the errors until we hit those lines of code. That means we're going to
have failures in production, where the application just blows up. It may
even take down the in-store [POS]{.smallcaps} systems, and that would be
bad."
He looks at his watch. "We've only got six hours to complete the work.
Because we don't have enough time to rerun all the tests, we're going to
have to take some shortcuts."
We spend the next ten minutes sketching out a revised schedule that
still completes by 6 a.m., enabling the stores to open normally with an
hour to spare. As Chris and William head off to notify their teams, I
indicate to Wes to remain behind.
"When we're out of the woods," I say, "we've got to figure out how to
prevent this from happening again. There should be absolutely no way
that the Dev and [QA]{.smallcaps} environments don't match the
production environment."
"You're right," Wes says, shaking his head in disbelief. "I don't know
how we're going to do it. But you've got no argument from me."
He looks behind him at Brent, incredulous. "Can you believe that Brent
is at the center of all of this again?"
------------------------------------------------------------------------
*Much later,* when the deployment is declared to be complete, everyone
applauds. I look at my watch. It's 5:42 a.m. on Saturday morning. The
team spent the entire night working, completing the deployment twenty
minutes early. That is, twenty minutes early according to the emergency
schedule we hammered out. According to the original schedule, we
finished almost six hours late.
William has confirmed that the test [POS]{.smallcaps} systems are
working, as well as the e-commerce website and all the associated
Phoenix modules.
Patty has started sending out notifications to all the store managers
that the deployment was "successful." She is attaching a list of known
errors to look out for, an internal web page to get the latest Phoenix
status, and instructions on how they can report any new problems. We're
keeping all the service desk people on standby, and both Chris and my
teams are on-call to provide early life support. Basically, we're all on
standby to support the business.
With Wes and Patty handling the on-call schedule, I say "good job" to
everyone and pack up my things. On my drive home, I wrack my brain,
trying to think of how we can keep each Phoenix deployment from causing
an emergency.
[]{#32-ch29.xhtml}
# Chapter 29 {.ch-title}
## • Monday, November 3 {.dateline}
*At 7:10 a.m. the following Monday,* Chris, Wes, Patty, and John are
again all seated with me in the boardroom. While we're waiting for
Steve, we talk about the aftermath of the second Phoenix deployment.
Erik is in the back of the room. In front of him is a bowl, an emptied
instant oatmeal packet, and a French press full of greenish water, with
leaves floating in it.
Seeing my puzzled expression, he says, "Yerba maté. My favorite drink
from South America. I never travel without it."
Steve walks through the door, still talking on his cell phone. "Look,
Ron, for the last time, no! No more discounts---even if they were our
last remaining customer. We've got to hold the line somewhere. Got it?"
He hangs up, exasperated, and finally sits down at the head of the
table, muttering, "Sorry I'm late." He opens up his folder, taking a
moment to study something inside it.
"Despite how the Phoenix deployment went over the weekend, I'm extremely
proud of everything you've have done over the last couple of weeks. Many
people have told me about how pleased they are with [IT]{.smallcaps}.
Even Dick," he says incredulously. "He's told me about how you're
helping to improve our key company performance measures, and he thinks
it will be a game changer."
He smiles. "I am very proud to be a part of this team that is obviously
working together better than ever, trusting one another, and getting
incredible results."
He turns to John. "By the way, Dick has also told me that with your
help, they've established that the financial restatement won't be
material." Breaking into a smile, he says, "Thank God. I won't be on the
cover of *Fortune* magazine wearing handcuffs, after all."
Just then, Sarah knocks on the door and enters the room.
"Good morning, Steve," she says, as she walks in primly, sitting down
besides Erik. "I take it you wanted to see me about my new marketing
initiatives?"
"You mean, the unauthorized shifts of work you're running inside the
[IT]{.smallcaps} factory, like some unscrupulous Chinese plant manager?"
Erik asks.
Sarah looks Erik up and down, obviously sizing him up.
Steve indicates to John to present his findings. When he concludes,
Steve says sternly, "Sarah, I issued a clear statement. No one is
allowed to start any new [IT]{.smallcaps} initiatives, internal or
external, without my explicit approval. Please explain your actions."
Sarah picks up her iPhone and angrily taps away for a couple of moments.
Putting it down, she says, "Our competitors are kicking our ass. We need
every advantage we can get. To achieve the stated objectives that you've
laid out, I can't wait for [IT]{.smallcaps}. I'm *sure* they're working
very hard, doing their best with what they have and what they know---but
it's not enough. We need to be nimble, and sometimes we need to buy
instead of build."
Wes rolls his eyes.
I respond, "I know that [IT]{.smallcaps} hasn't always been able to
deliver what you've needed in the past, and I know Marketing and Sales
have gotten burned. We want the business to win as much as you do. The
problem is that some of your creative initiatives are jeopardizing other
important company commitments, such as complying with state laws and
regulations on data privacy, as well as our need to stay focused on
Phoenix.
"What you're proposing could lead to more data integrity problems in our
order entry and inventory management system. Dick, Ron, and Maggie have
made it clear that we must get this data cleaned up and keep it clean.
Nothing is more important to understand customer needs and wants, have
the right product portfolio, retain our customers, and ultimately
increase our revenue and market share."
I add, "Supporting those projects also requires an incredible amount of
work. We' d need to give your vendors access to our production
databases, explain how we've set them up, do a bunch of firewall
changes, and probably over a hundred other steps. It's not just as easy
as signing an invoice."
She looks back at me scathingly. This is the most livid I've seen her.
Clearly, she doesn't like me quoting Dick's company objectives to her,
using it to deny her what she wants.
It occurs to me that I might have just made a dangerous enemy.
She addresses the room, "Since Bill seems to understand the business so
much better than I do, why doesn't he tell all of us what he proposes?"
"Sarah, no one understands better what your area of the business needs
than you. You're absolutely entitled to go outside of the company to
fulfill those needs if we can't deliver, as long as we make the decision
understanding how it might jeopardize another part of the enterprise," I
say as reasonably as I can. "How about you, Chris, and I meet regularly
to see how we can help with your upcoming initiatives?"
"I'm very busy," she says. "I can't spend a whole day meeting with you
and Chris. I've got an entire department to run, you know."
To my relief, Steve interjects. "Sarah, you will make the time. I look
forward to hearing how those meetings go and how you resolve your two
unauthorized [IT]{.smallcaps} initiatives. Are we clear?"
She says in a huff, "Yes. I'm just trying to do what's right for Parts
Unlimited. I'll do the best with what I have, but I'm not optimistic
about the outcome. You're really tying my hands here."
Sarah stands up. "By the way, I had a conversation with Bob Strauss
yesterday. I don't think your leash is as long as you think it is. Bob
says we need to be looking at strategic options, like splitting up the
company. I think he's right."
As she leaves, slamming the door behind her, Erik says wryly, "Well, I'm
sure we've seen the last of *her*..."
------------------------------------------------------------------------
*Steve looks at the door* for a moment and then turns to me. "Let's go
to the last item on today's agenda. Bill, you're concerned that we're
going the wrong way with Phoenix---that not only are things going to get
worse, but we may never achieve the desired business outcomes. That is
extremely troubling."
I shrug my shoulders. "Now you know everything I know. I was actually
hoping that Erik could give us some insights."
Erik looks up, wiping his mustache with a napkin. "Insights? To me, the
answer to your problem is obvious. The First Way is all about
controlling the flow of work from Development to [IT]{.smallcaps}
Operations. You've improved flow by freezing and throttling the project
releases, but your batch sizes are still way too large. The deployment
failure on Friday is proof. You also have way too much [WIP]{.smallcaps}
still trapped inside the plant, and the worst kind, too. Your
deployments are causing unplanned recovery work downstream."
He continues, "Now you must prove that you can master the Second Way,
creating constant feedback loops from [IT]{.smallcaps} Operations back
into Development, designing quality into the product at the earliest
stages. To do that, you can't have nine-month-long releases. You need
much faster feedback.
"You'll never hit the target you're aiming at if you can fire the cannon
only once every nine months. Stop thinking about Civil War era cannons.
Think antiaircraft guns."
He stands up to throw his bowl of oatmeal in the wastebasket. Then he
peers in the wastebasket and fishes his spoon back out.
Turning around, he says, "In any system of work, the theoretical ideal
is single-piece flow, which maximizes throughput and minimizes variance.
You get there by continually reducing batch sizes.
"You're doing the exact opposite by lengthening the Phoenix release
intervals and increasing the number of features in each release. You've
even lost the ability to control variance from one release to the next."
He pauses. "That's ridiculous, given all the investments you've made
virtualizing your production systems. You still do deployments like
they're physical servers. As Goldratt would say, you've deployed an
amazing technology, but because you haven't changed the way you work,
you haven't actually diminished a limitation."
I look around at everyone, confirming that no one understands what Erik
is talking about, either. I say, "The last Phoenix release was caused by
a production change to the database server that didn't get replicated in
the upstream environments. I was about to agree with Chris. We should
pause deployments until we can figure out how to keep all the
environments synchronized. That means slowing down the releases, right?"
Remaining standing, Erik snorts. "Bill, that is simultaneously one of
the smartest things I've heard all month---and one of the dumbest."
I don't react as Erik looks at one of the drawings on the boardroom
wall. Pointing at it, he says, "Wilbur, what kind of engine is this?"
Wes grimaces and says, "That's a 1,300 [cc]{.smallcaps} engine for a
2007 Suzuki Hayabusa dragster motorcycle. And by the way, it's 'Wes.'
Not 'Wilbur.' My name hasn't changed since last time."
"Yes, of course," Erik responds. "Dragster motorcycles are great fun to
watch. This one probably goes over 230 miles per hour. How many gears
does this racer have?"
Without pausing, Wes responds, "Six. Constant mesh, with a #532 chain
drive."
"Does that include the reverse gear?" Erik asks.
"That model doesn't have a reverse gear," Wes replies quickly.
Erik nods as he looks more closely at the drawing on the wall, saying,
"Interesting, isn't it? No reverse gear. So why should your flow of work
have a reverse gear?"
The silence lengthens when Steve finally says, "Look, Erik. Can you just
say what you're thinking? To you, this may be a fun game to play, but
we've got a business to save."
Erik looks at Steve closely, studying him. "Think like a plant manager.
When you see work going upstream, what does it mean to you?"
He quickly responds, "The flow of work should ideally go in one
direction only: forward. When I see work going backward, I think
'waste.' It might be because of defects, lack of specification, or
rework... Regardless, it's something we should fix."
Erik nods. "Excellent. I believe that, too."
He picks up his empty French press and spoon from the table, puts them
into his suitcase and starts zipping it up. "The flow of work goes in
one direction only: forward. Create a system of work in [IT]{.smallcaps}
that does that. Remember, the goal is single-piece flow."
He turns to me. "Incidentally, this will also solve the problem that
you've been fretting about with Dick. An inevitable consequence of long
release cycles is that you'll never hit the internal rate of return
targets, once you factor in the cost of labor. You must have faster
cycle times. If Phoenix is preventing you from doing that, then figure
out how to deliver the features some other way.
"Without being like Sarah, of course," he says with a small smile.
Picking up his suitcase, he adds, "To do this, you'll need to put Brent
at the very front of the line, just like Herbie in *The Goal*. Brent
needs to be working at the earliest stages of the development process.
Bill, you of all people should be able to figure this out.
"Good luck, guys," he says, and we all watch as he closes the door
behind him.
Steve finally says, "Anyone have any suggestions or proposals?"
Chris replies first. "As I shared earlier, even minor Phoenix bug fix
releases are so problematic that we can't afford to be doing them
monthly. Despite what Erik said, I think we need to slow down our
release schedule. I propose moving to one release every other month."
"Unacceptable," Steve says, shaking his head. "Last quarter, we missed
almost every target we set by a mile. This will be our fifth consecutive
quarterly miss---and that was after we lowered our expectations with
Wall Street. All our hopes depend on completing Phoenix. You're telling
me that we're going to have to wait even longer to get the features we
need, while our competitors continue to pull away from us? Impossible."
"It may be 'impossible' to you, but look at it from my perspective,"
Chris says levelly. "I need my developers building new features. They
can't be constantly tied up with Bill's team, dealing with deployment
issues."
Steve replies, "This quarter is make or break. We promised the world
that we' d get Phoenix out last month, but because of all the features
we delayed, we're not getting the sales benefits that we hoped for. Now
we're over a month through the quarter, with the holiday buying season
in fewer than thirty days. We are out of time."
Thinking this through, I force myself to accept that Chris is stating
the reality he sees, and that it is based on facts. And the same goes
for Steve.
I say to Chris, "If you say that the Phoenix team needs to slow down,
you won't get any argument from me. In the Marines, when you have a
company of a hundred men with a man wounded, the first thing you lose is
mobility.
"But we still need to figure out how to achieve what Steve needs," I
continue. "As Erik suggested, if we can't do that inside the Phoenix
framework, maybe we can do it outside of Phoenix. I propose we form a
[SWAT]{.smallcaps} team by detaching a small squad from the main Phoenix
team, telling them to figure out what features can help us hit our
revenue goals as soon as possible. There's not a lot of time, so we'll
need to select the features carefully. We'll tell them that they're
allowed to break whatever rules required to get the job done."
Chris considers this for a moment and finally nods. "Phoenix is all
about helping customers buy things from us, faster and in larger
quantities. The last two releases have all been putting down the
groundwork to make that happen, but the features to really increase
sales are still bogged down. We need to focus on generating good
customer recommendations and enable Marketing to create promotions to
sell profitable products that we have in inventory."
"We have years of customer purchasing data and because of our branded
credit cards, we know our customer demographics and preferences," Steve
interjects, leaning forward. "Marketing assures me that we can create
some really compelling offers to our customers, if we could only get
those features shipped."
Chris, Wes, and Patty dive in to discuss this further, while John looks
dubious. Eventually Wes says, "You know, this just may work." When
everyone nods, including John, I feel there's a sense of excitement and
possibility that was missing just minutes ago.
[]{#33-ch30.xhtml}
# Chapter 30 {.ch-title}
## • Monday, November 3 {.dateline}
*An hour after the meeting with Steve adjourned,* I'm still mulling over
Erik's cryptic comments. I feel like we're on the verge of something
big, but I have too many questions. I finally decide to call him.
"Yeah?" he answers.
"Bill here," I say. "I need some more clues about what the hell we're
supposed to be doing..."
"Meet me outside the building," he says, hanging up.
When I get outside, the wind is gusty and fierce. I look around for a
couple of moments, when I hear a horn honk. Erik is in an
expensive-looking red [BMW]{.smallcaps} convertible, with the top down.
"Come on in. Hurry!"
"Nice ride," I say, climbing into the passenger seat.
"Thanks," he says. "My friend insisted that I borrow this while I'm in
town."
As he floors the accelerator, I grab the armrest and hurriedly buckle my
seatbelt. I see a purse on the floor, and immediately wonder who this
"friend" is.
"We're heading back to [MRP]{.smallcaps}-8," he says.
When I ask him to raise the convertible top, he looks over at me and
says, "I thought there was no such thing as an 'ex-Marine.' Maybe they
made you guys softer than in my day."
"You were in the service?" I ask, trying to hide my chattering teeth.
He laughs. "Over twenty years."
"You retired as an officer, I suppose?" I asked.
"Major, Special Forces, US Army," he replies, looking at me. I keep
hoping he'll keep his eyes on the road, given how fast we're going.
Instead, he continues, "Same branch as Steve, but he joined as an
officer. I joined as an enlisted grunt, just like you."
He doesn't reveal any more, but he has already told me enough to
understand his military career. He was obviously a senior
[NCO]{.smallcaps}, like many I had to deal with on a daily basis, now
recognizing his all-too-familiar demeanor and physical bearing. He must
have been identified as one of those rare high-potential people by the
higher-ups, who decided to invest in his future, sending him to college
and Officer Candidate School, then rejoining the ranks as the oldest
second lieutenant around, probably ten years older than everybody else.
It takes a special person to go through that.
We make it to the plant in record time and are now standing on the
catwalk. He begins the speech that I've been expecting. "A manufacturing
plant is a system. The raw materials start on one side, and a million
things need to go just right in order for it to leave as finished goods
as scheduled out the other side. Everything works together. If any work
center is warring with the other work centers, especially if
Manufacturing is at war with Engineering, every inch of progress will be
a struggle."
Erik turns to me, pointing, "You've got to stop thinking like a work
center supervisor. You need to think bigger, like a plant manager. Or
better yet, think like the person who designed this manufacturing plant
and all of the processes it relies upon. They look at the entire flow of
work, identify where the constraints are, and use every possible
technology and bit of process knowledge they have to ensure work is
performed effectively and efficiently. They harness their
'inner-Allspaw.' "
I'm about to ask what he means by an "Allspaw," when he just waves my
question away. "In manufacturing, we have a measure called *takt* time,
which is the cycle time needed in order to keep up with customer demand.
If any operation in the flow of work takes longer than the takt time,
you will not be able to keep up with customer demand."
"So when you run around screaming, 'Oh no! We don't have environments
for Phoenix ready! Help, help! Oh, no! We can't deploy, because someone
broke the Phoenix environments again!' " he says in a high, girlish
voice, "That means the cycle time of some critical operation in your
area of responsibility is greater than the takt time. That is the reason
you can't keep up with customer demand.
"As part of the Second Way, you need to create a feedback loop that goes
all the way back to the earliest parts of product definition, design,
and development," he says. "Given the conversations you're having with
Dick, you may even be able to go earlier in the process."
Pointing at the floor, he says, "Look down at the long lane of equipment
between the orange tape on the floor. That lane makes some of the
highest profit items we have. But as fate would have it, that particular
flow of work involves two operations that have the longest setup and
process times: application of a paint powder coating and baking it in
the heat treat oven."
He looks up, arms spread outward. "Back in the day, the cycle time for
those two operations was so much larger than takt time, we were never
able to keep up with customer demand. How can life be so unfair? The
most profitable items used *both* of our constraints: the heat treat
oven *and* the paint booths! What do we do?
"Customers were even offering to throw money at us, begging us for more
of these widgets, but we had to turn them away. The setup time for each
job took hours or even days. We had to use enormous batch sizes to meet
demand. We had these huge trays to paint and would bake as many units at
a time as possible. We knew we had to reduce batch sizes to improve
throughput, but everyone said that it couldn't be done."
"How Toyota solved this problem is legendary," he says. "During the
1950s, they had a hood stamping process that had a change-over time of
almost three days. It required moving huge, heavy dies that weighed many
tons. Like us, the setup times were so long that they needed to use
large batch sizes, which prevented them from using one stamping machine
to manufacture multiple different car models simultaneously. You can't
make one hood for a Prius and then one hood for a Camry if it takes you
three days to do the changeovers, right?
"What did they do?" he asks rhetorically. "They closely observed all the
steps required to do the changeover, and then put in a series of
preparations and improvements that brought the changeover time down to
under ten minutes. And that, of course, is where the legendary
'single-minute exchange of die' term comes from.
"We studied all the works of Ohno, Spear, and Rother. We knew that we
had to decrease our batch size, but we weren't dealing with hood
stamping dies. We were dealing with painting and curing," he continues.
"After weeks of brainstorming, investigation, and experimentation with
Engineering, we had a crazy idea: Maybe we could do the painting and
curing in a single machine. We cobbled together an oven that also
applied the paint powder onto the parts, which were pulled through on a
chain and gear that we took from a bicycle.
"We combined four work centers into one, eliminating over thirty manual,
error-prone steps, completely automating the work cycle, achieving
single-piece flow, and eliminating all that setup time. Throughput went
through the roof.
"The benefits were enormous," he says with pride. "First, when defects
were found, we fixed them immediately and we didn't have to scrap all
the other parts in that batch. Second, [WIP]{.smallcaps} was brought
down because each work center never overproduced product, only to sit in
the queue of the next work center. But the most important benefit was
that order lead times were cut from one month to less than a week. We
could build and deliver whatever and however many the customer wanted
and never had a warehouse full of crap that we' d need to liquidate at
fire-sale prices.
"So, now it's your turn," he says sternly, poking a finger into my
chest. "You've got to figure out how to decrease your changeover time
and enable faster deployment cycle time.
"I think your target should be..." he says, pausing for a moment. "Ten
deploys a day. Why not?"
My jaw drops. "That's impossible."
"Oh, really?" he says, deadpan. "Let me tell you a story. Back in 2009,
I was a board director at a technology company, where one of our
engineers went to the Velocity Conference and came back raving like a
madman, full of dangerous, impossible ideas. He saw a presentation given
by John Allspaw and his colleague Paul Hammond that flipped the world on
its head. Allspaw and Hammond ran the [IT]{.smallcaps} Operations and
Engineering groups at Flickr. Instead of fighting like cats and dogs,
they talked about how they were working together to routinely do ten
deploys a day! This is in a world when most [IT]{.smallcaps}
organizations were mostly doing quarterly or annual deployments. Imagine
that. He was doing deploys at a rate one thousand times faster than the
previous state of the art.
"Let me tell you," he continues, "we all thought that this engineer had
lost his marbles. But I learned that the practices that Allspaw and
Hammond espoused are the inevitable outcome of applying the Three Ways
to the [IT]{.smallcaps} value stream. It totally changed how we managed
[IT]{.smallcaps} and it saved our company.
"How did they do it?" I ask, dumbfounded.
"Good question," he replies. "Allspaw taught us that Dev and Ops working
together, along with [QA]{.smallcaps} and the business, are a
super-tribe that can achieve amazing things. They also knew that until
code is in production, no value is actually being generated, because
it's merely [WIP]{.smallcaps} stuck in the system. He kept reducing the
batch size, enabling fast feature flow. In part, he did this by ensuring
environments were always available when they were needed. He automated
the build and deployment process, recognizing that infrastructure could
be treated as code, just like the application that Development ships.
That enabled him to create a one-step environment creation and deploy
procedure, just like we figured out a way to do one-step painting and
curing.
"So, we now know that Allspaw and Hammond weren't so crazy after all.
Jez Humble and Dave Farley independently came to the same conclusions,
and then codified the practices and principles that enable multiple
deployments per day in their seminal book *Continuous Delivery*. Eric
Ries then showed us how this capability can help the business learn and
win in his Lean Startup work."
As Erik talks, he is as animated as I've ever seen him. Shaking his
head, he looks sternly at me.
"Your next step should be obvious by now, grasshopper. In order for you
to keep up with customer demand, which includes your upstream comrades
in Development," he says, "you need to create what Humble and Farley
called a *deployment pipeline*. That's your entire value stream from
code check-in to production. That's not an art. That's production. You
need to get everything in version control. Everything. Not just the
code, but everything required to build the environment. Then you need to
automate the entire environment creation process. You need a deployment
pipeline where you can create test and production environments, and then
deploy code into them, entirely on-demand. That's how you reduce your
setup times and eliminate errors, so you can finally match whatever rate
of change Development sets the tempo at."
"Hold on," I say. "What is it exactly that I'm supposed to automate?"
Erik looks at me sternly. "Go ask Brent. Get him assigned to that new
team, and make sure that he doesn't get distracted. Now more than ever,
until you get your build process automated, he is your bottleneck. Get
the things that are in his head encoded into the build procedures. Get
humans out of the deployment business. Figure out how to get to ten
deploys a day."
I can't get over my skepticism. "Ten deploys a day? I'm pretty sure that
no one is asking for that. Aren't you setting a target that's higher
than what the business needs?"
Erik sighs, rolling his eyes. "Stop focusing on the deployment target
rate. Business agility is not just about raw speed. It's about how good
you are at detecting and responding to changes in the market and being
able to take larger and more calculated risks. It's about continual
experimentation, like Scott Cook did at Intuit, where they did over
forty experiments during the peak tax filing season to figure out how to
maximize customer conversion rates. During the peak tax filing season!
"If you can't out-experiment and beat your competitors in time to market
and agility, you are sunk. Features are always a gamble. If you're
lucky, ten percent will get the desired benefits. So the faster you can
get those features to market and test them, the better off you'll be.
Incidentally, you also pay back the business faster for the use of
capital, which means the business starts making money faster, too.
"Steve is betting his entire survival on your ability to execute and
deploy capabilities faster. So, get to work with Chris to figure out how
at every stage of the agile development process, you not only have
shippable code, but a working environment it can deploy into!"
"Okay, okay," I say. "But why did you drag me all the way over here in
the freezing cold? Wouldn't explaining it on a whiteboard have been
enough?"
"You think [IT]{.smallcaps} Operations is rocket-science compared to
manufacturing. What absolute baloney," he says dismissively. "From where
I'm sitting, the people in *this* building have been far more creative
and courageous than anything I've seen come from you [IT]{.smallcaps}
guys so far."
[]{#34-ch31.xhtml}
# Chapter 31 {.ch-title}
## • Monday, November 3 {.dateline}
*It's 12:13 p.m. when I walk* into the [SWAT]{.smallcaps} team kick-off
meeting. My hair is dripping wet and my shirt is soaked from my ride
back in Erik's convertible. Chris is talking. "---and so Steve has
authorized this small team to deliver the promotion functionality and do
whatever it takes to make a positive impact on the holiday shopping
season."
Chris turns to me and points to the back of the room. "I went ahead and
ordered lunch for everyone to kick this off. Go ahead and---what
happened to you?"
I wave away his question. Looking at where he's pointing, I'm pleasantly
surprised to see a turkey sandwich lunch box still at the back. Grabbing
it, I take a seat and try to gauge the temperature of everyone in the
room, especially Brent.
Brent responds, "Explain again why I'm here?"
"That's what we're here to figure out," Wes says earnestly. "You know as
much as we do. One of the potential board members insisted that you be a
part of this team. Quite frankly, he's been right enough times that I
trust him, even if I have no freaking idea why."
Patty chimes in. "Well, he gave us a couple of clues. He said that the
problems we need to focus on are the deployment process and the way
we're building the environments. He seems to think we must be doing
something fundamentally wrong because of all the chaos resulting from
each Phoenix deployment."
As I unwrap my sandwich I say, "I just came back from a meeting with
him. He showed me a bunch of stuff and explained how they do
single-minute exchanges of die at Toyota. He thinks we need to build the
capability to do ten deploys per day. He not only insists this is
possible but also that it supports the feature deployment cycles the
business needs, not just to survive, but to win in the marketplace."
Surprisingly, Chris speaks out the most fiercely. "*What*? Why in the
world would we need to do ten deploys a day? Our sprint intervals are
three weeks long. We don't have anything to deploy ten times a day!"
Patty shakes her head. "Are you sure? What about bug fixes? What about
performance enhancements when the site grinds to a halt, like what's
happened during the last two major launches? Wouldn't you love to do
these types of changes in production routinely, without having to break
all the rules to do some sort of emergency change?"
Chris thinks for a couple of moments before responding. "Interesting. I
would normally call those types of fixes a patch or a minor release. But
you're right---those are deployments, too. It would be great if we could
roll out fixes more quickly, but come on, *ten deploys a day?*"
Thinking about what Erik said, I add, "How about enabling Marketing to
make their own changes to content or business rules or enabling faster
experimentation and [A/B]{.smallcaps} split testing, to see what offers
work best?"
Wes puts both of his hands on the table. "Mark my words, folks. It can't
be done. We're dealing with the laws of physics here. Forget about how
long it currently takes, which requires over one week of preparation and
over eight hours to do the actual deployment! You can only put bits down
on the disk so fast."
That's exactly what I would have said before the plant tour with Erik. I
say earnestly, "Look, maybe you're right, but humor me for a second:
Just how many steps are there in the entire end-to-end deployment
process? Are we talking about twenty steps, two hundred, or two
thousand?"
Wes scratches his head for a moment before he says, "What do you think,
Brent? I would have thought about a hundred steps..."
"Really?" Brent responds. "I would have thought it was more like twenty
steps."
William interjects, "I'm not sure where you're starting to count, but if
we begin at the point where Development commits code and we label it as
a 'release candidate,' I can probably come up with a hundred steps, even
before we hand it to [IT]{.smallcaps} Operations."
Uh-oh.
Wes interrupts, "No, no, no. Bill said 'deployment steps.' Let's not
open up a can of---"
As Wes talks, I think about Erik challenging me to think like a plant
manager as opposed to a work center supervisor. I suddenly realize that
he probably meant that I needed to span the departmental boundaries of
Development and [IT]{.smallcaps} Operations.
"You guys are both correct," I say, interrupting Wes and William.
"William, would you mind writing down all the steps on the whiteboard?
I'd suggest starting at 'code committed,' and keep going until the
handoff to our group."
He nods and walks to the whiteboard and starts drawing boxes, discussing
the steps as he goes. Over the next ten minutes, he proves that there
are likely over one hundred steps, including the automated tests run in
the Dev environment, creating a [QA]{.smallcaps} environment that
matches Dev, deploying code into it, running all the tests, deploying
and migrating into a fresh staging environment that matches
[QA]{.smallcaps}, load testing, and finally the baton being passed to
[IT]{.smallcaps} Operations.
When William is finished, there are thirty boxes on the board.
Looking over at Wes, I see that rather than looking irritated, he
actually appears deep in thought, rubbing his chin while looking at the
diagram.
I indicate to Brent and Wes that one of them should continue where
William left off.
Brent gets up and starts drawing boxes to indicate the packaging of the
code for deployment; preparing new server instances; loading and
configuring the operating system, databases, and applications; making
all the changes to the networks, firewalls, and load balancers; and then
testing to make sure the deployment completed successfully.
I contemplate the entirety of the diagram, which surprisingly reminds me
of the plant floor. Each of these steps is like a work center, each with
different machines, men, methods, and measures. [IT]{.smallcaps} work is
probably *much more complex* than manufacturing work. Not only is the
work invisible, making it more difficult to track, but there are far
more things that could go wrong.
Countless configurations need to be set correctly, systems need enough
memory, all the files need to be put in the right place, and all code
and the entire environment need to be operating correctly.
Even one small mistake could take everything down. Surely this meant
that we needed even *more* rigor and discipline and planning than in
manufacturing.
I can't wait to tell Erik this.
Realizing the importance and enormity of the challenge in front of us, I
walk to the whiteboard, and pick up the red marker. I say, "I'm going to
put a big red star on each step where we had problems during previous
launches."
Starting to make marks on the whiteboard, I explain, "Because a fresh
[QA]{.smallcaps} environment wasn't available, we used an old version;
because of all the test failures, we made code and environment changes
to the [QA]{.smallcaps} environment, which never made it back into the
Dev or Production environments; and because we never synchronized all
the environments, we had the same problems the next time around, too."
Leaving a trail of red stars, I start marching into Brent's boxes.
"Because we didn't have correct deployment instructions, it took us five
turns to get the packaging and deployment scripts right. This blew up in
production because the environment was incorrectly built, which I've
already brought up."
Even though I didn't do it on purpose, by the time I'm done, almost all
of William and Brent's boxes had red stars next to them.
Turning around, I see everyone's dispirited faces as they take in what
I've done. Realizing my potential mistake, I hurriedly add, "Look, my
goal isn't to blame anyone or say that we're doing a crappy job. I'm
merely trying to get down on paper exactly what we're doing and get some
objective measures of each step. Let's fight the problem that's on the
whiteboard as a team and not blame one another, okay?"
Patty says, "You know, this reminds me of something that I've seen the
plant floor guys use all the time. If one of them walked in, I'm
guessing that they'd think we're building a 'value stream map.' Mind if
I add a couple of elements?"
I pass the whiteboard marker to her and sit down.
For each of the boxes, she asks how long each of these operations
typically takes then jots the number on top of the box. Next, she asks
whether this step is typically where work has to wait then draws a
triangle before the box, indicating work in process.
Holy crap. To Patty, the similarity between our deployments and a plant
line isn't some academic question. She's treating our deployment as if
it actually was a plant line!
She's using Lean tools and techniques that the manufacturing folks use
to document and improve their processes.
Suddenly, I understand what Erik meant when he talked about the
"deployment pipeline." Even though you can't see our work like in a
manufacturing plant, it's still a value stream.
I correct myself. It's our value stream, and I'm confident that we're on
the brink of figuring out how to dramatically increase the flow of work
through it.
After Patty finishes recording the durations of the steps, she redraws
the boxes, using short labels to describe the process steps. On a
separate whiteboard, she writes down two bullet points: "environments"
and "deployment."
Pointing to what she just wrote, she says, "With the current process,
two issues keep coming up: At every stage of the deployment process,
environments are never available when we need them, and even when they
are, there's considerable rework required to get them all synchronized
with one another. Yes?"
Wes snorts, saying, "No reward for stating something *that* obvious, but
you're right."
She continues, "The other obvious source of rework and long setup time
is in the code packaging process, where [IT]{.smallcaps} Operations
takes what Development checks into version control and then generates
the deployment packages. Although Chris and his team do their best to
document the code and configurations, something always falls through the
cracks, which are only exposed when the code fails to run in the
environment after deployment. Correct?"
This time, Wes doesn't respond right away. Brent beats him, saying,
"You've nailed it. William can probably relate to these problems: the
release instructions are never up-to-date, so we're always scrambling,
trying to futz with it, having to rewrite the installer scripts and
install it over and over again..."
"Yep," William says, nodding adamantly.
"I'd suggest we focus on those two areas, then," she says, looking at
the board and then grabbing her seat again. "Any ideas?"
Brent says, "Maybe William and I can work together to build a deployment
run book, to capture all the lessons learned from our mistakes?"
I nod, listening to everyone's ideas, but none of them seem like the
massive breakthrough we need. Erik had described the reduction of setup
time for the door stamping process. He seemed to indicate that it was
important. But why?
"Having each group cobble an environment together obviously isn't
working. Whatever we do must take us a big step toward this 'ten deploys
a day' target," I say. "This implies that we need a significant amount
of automation. Brent, what would it take for us to be able to create a
common environment creation process, so we can simultaneously build the
Dev, [QA]{.smallcaps}, and Production environments at the same time, and
keep them synchronized?"
"Interesting idea," Brent says, looking at the board. He stands up and
draws three boxes labeled "Dev," "[QA]{.smallcaps}," and "Production."
And then underneath them, he draws another box labeled "Build Procedure"
with arrows into each of the boxes above.
"That's actually pretty brilliant, Bill," he says. "If we had a common
build procedure, and everyone used these tools to create their
environments, the developers would actually be writing code in an
environment that at least resembles the Production environment. That
alone would be a huge improvement."
He takes the marker cap out of his mouth. "To build the Phoenix
environment, we use a bunch of scripts that we've written. With a bit of
documentation and cleanup, I bet we could cobble together something
usable in a couple of days."
Turning to Chris, I say, "This seems promising. If we could standardize
the environments and get these in daily use by Development,
[QA]{.smallcaps}, and [IT]{.smallcaps} Operations, we could eliminate
the majority of variance that's causing so much grief in the deployment
process."
Chris seems excited. "Brent, if it's okay with you and everyone else,
I'd like to invite you to our team sprints, so that we can get
environment creation integrated into the development process as early as
possible. Right now, we focus mostly on having deployable code at the
end of the project. I propose we change that requirement. At each
three-week sprint interval, we not only need to have deployable code but
also the exact environment that the code deploys into, and have that
checked into version control, too."
Brent smiles widely at the suggestion. Before Wes can respond, I say, "I
completely agree. But before we go further, can we investigate the other
issue that Patty highlighted? Even if we adopted Chris' suggestions,
there's still the issue of the deployment scripts. If we had a magic
wand, whenever we have a fresh [QA]{.smallcaps} environment, how should
we deploy the code? Every time we deploy, we constantly ping-pong code,
scripts, and God knows what else among groups."
Patty chimes in. "On the manufacturing floor, whenever we see work go
backward, that's rework. When that happens, you can bet that the amount
of documentation and information flow is going to be pretty poor, which
means nothing is reproducible and that it's going to get worse over time
as we try to go faster. They call this 'non-value-add' activity or
'waste.' "
Looking at the first whiteboard with all the boxes, she says, "If we
redesign the process, we need to have the right people involved upfront.
This is like the manufacturing engineering group ensuring that all parts
are designed so that they are optimized for manufacturing and that the
manufacturing lines are optimized for the parts, ideally in single-piece
flow."
I nod, smiling at the similarities between what Patty is recommending
and what Erik suggested earlier today.
Turning to William and Brent, I say, "Okay, guys, you have the magic
wand. You're at the front of the line. Tell me how you'd design the
manufacturing line so that work never goes backward, and the flow is
moving forward quickly and efficiently."
When they both give me a blank look, I say with some exasperation, "You
have a *magic wand*. Use it!"
"How big is the magic wand?" William asks.
I repeat what I said to Maggie. "It's a *very* powerful magic wand. It
can do anything."
William walks to the whiteboard and points at a box called "code
commit." "If I could wave this magic wand, I would change this step.
Instead of getting source code or compiled code from Dev through source
control, I want packaged code that's ready to be deployed."
"And you know," he continues, "I want this so much, I'd happily
volunteer to take over responsibility for package creation. I know
exactly the person I'd assign, too. She would be responsible for the Dev
handoff. When code is labeled 'ready to test,' we would then generate
and commit the packaged code, which would trigger an automated
deployment into the [QA]{.smallcaps} environment. And later, maybe even
the Production environment, too."
"Wow. You'd really do that?" Wes asks. "That would be really great.
Let's do it---unless Brent really wants to keep doing the packaging?"
"Are you kidding?" Brent asks, bursting out laughing. "I'll buy whoever
this person is drinks for the rest of the year! I love this idea. And I
want to help build the new deployment tools. Like I said, I've got a
bunch of tools that I've written that we can use as a starting point."
I can feel the energy and excitement in the room. I'm amazed at how
quickly we went from believing the 'ten deploys a day' target was a
delusional fantasy, to wondering how close we can get.
Suddenly, Patty looks up and says, "Wait a second. This entire Phoenix
module deals with customer purchase data, which has to be protected.
Shouldn't someone from John's team be a part of this effort, as well?"
We all look at one another, agreeing that he needs to be involved. And
once again, I marvel at how much we've changed as an organization.
[]{#35-ch32.xhtml}
# Chapter 32 {.ch-title}
## • Monday, November 10 {.dateline}
*The next two weeks fly by* with the [SWAT]{.smallcaps} team activities
taking up much of my time, as well as Wes' and Patty's.
It's been over a decade since I've had daily interactions with
developers. I had forgotten how quirky they can be. To me, they seem
more like indie musicians than engineers.
In my day, developers wore pocket protectors---not vintage T-shirts and
sandals---and carried slide rules, not skateboards.
In many ways, most of these guys are my temperamental opposites. I like
people who create and follow processes, people who value rigor and
discipline. These guys shun process in favor of whim and whimsy.
But thank goodness they're here.
I know that stereotyping an entire profession isn't fair. I know that
all these diverse skills are vital if we want to succeed. The challenge
is how to pull all of us together, so that we're working toward the same
goal.
The first challenge: to name the [SWAT]{.smallcaps} team project. We
couldn't keep calling it "mini-Phoenix," so we eventually had to spend
an hour debating names.
My guys wanted to call it "Cujo" or "Stiletto." But the developers
wanted to call it "Unicorn."
Unicorn? Like rainbows and Care Bears?
And against all my expectations, "Unicorn" wins the vote.
Developers. I'll never understand them.
Regardless of my distaste for the name, Project Unicorn was shaping up
amazingly well. With the objective of doing whatever it takes to deliver
effective customer recommendations and promotions, we started with a
clean code base that was completely decoupled from the Phoenix behemoth.
It was amazing to see how this team tackled obstacles. One of the first
challenges was to start analyzing the customer purchase data, which was
the first brick wall. Even touching the production databases meant
linking to their libraries, and any changes to them would require
convincing the architecture team to approve it.
Since the entire company could be out of business by that time, the
developers and Brent decided to create a completely new database, using
open source tools, with data copied from not only Phoenix but also the
order entry and inventory management systems.
By doing this, we could develop, test, and even run in operations
without impacting Phoenix or other business critical applications. And
by decoupling ourselves from the other projects, we could make all the
changes we needed to without putting other projects at risk. At the same
time, we wouldn't get bogged down in the processes that we didn't need
to be a part of.
I wholeheartedly approved and applauded this approach. However, a small
part of me wondered how we're going to manage the inevitable sprawl, if
every project could spawn a new database on a whim. I remind myself to
ensure that we standardize what types of databases we can put into
production to ensure that we have the right skills to support these
long-term.
In the meantime, Brent worked with William's team to create the build
procedures and automated mechanisms that could simultaneously create the
Dev, [QA]{.smallcaps}, and Production environments. We were all
astonished that within the three-week sprint, perhaps for the first time
in memory, all the developers were using exactly the same operating
system, library versions, databases, database settings, and so forth.
"This is unbelievable," one of the developers said at the sprint
retrospective, held at the end of each sprint. "For Phoenix, it takes us
three or four weeks for new developers to get builds running on their
machine, because we've never assembled the complete list of the
gazillion things you need installed in order for it to compile and run.
But now all we have to do is check out the virtual machine that Brent
and team built, and they're all ready to go."
Similarly, we were all amazed that we had a [QA]{.smallcaps} environment
available that matched Dev so early in the project. That, too, was
unprecedented. We needed to make a bunch of adjustments to reflect that
the Dev systems had considerably less memory and storage than
[QA]{.smallcaps}, and [QA]{.smallcaps} had less than those in
Production. But the vast majority of the environments were identical and
could be modified and spun up in minutes.
Automated code deployments weren't quite working yet, nor was the
migration of code among the environments, but William's team had demoed
enough of those capabilities that we all had confidence that they'd have
it nailed down soon.
On top of that, the developers had hit their feature sprint goals ahead
of schedule. They generated reports showing "customers who bought this
product bought these other products." The reports were taking hundreds
of times longer than expected, but they promised that they could improve
performance.
Because of our rapid progress, we decided to shrink the sprint interval
to two weeks. By doing this, we could reduce our planning horizon, to
make and execute decisions more frequently, as opposed to sticking to a
plan made almost a month ago.
Phoenix continues to operate on a plan written over three years ago. I
try not to think about that too much.
Our progress seemed to be improving exponentially. We're planning and
executing faster than ever, and the velocity gap between Unicorn and
Phoenix keeps getting larger. The Phoenix teams are taking notice and
starting to borrow practices left and right and getting results that we
hadn't thought possible.
Unicorn momentum seems unstoppable and now has a life of its own. I
doubt we could have made them stop and go back to the old way, even if
we wanted to.
------------------------------------------------------------------------
*While I'm in the middle* of a budgeting meeting, Wes calls. "We've got
a big problem."
Stepping out of the room, I say, "What's up?"
"No one has been able to find Brent for the last two days. You have any
idea where he is?" he asks.
"No," I reply. "Wait, what do you mean you can't find him? Is he okay?
You've tried his cell phone, right?"
Wes doesn't bother hiding his exasperation. "Of course I called his cell
phone! I've been leaving voicemails for him hourly. Everyone is trying
to find him. We've got work up the wazoo, and his team mates are
starting to freak out that---holy crap, it's Brent calling... Hang
on..."
I hear him pick up his desk phone, saying, "Where the hell have you
been? Everyone is looking for you! No... No... Des Moines? What are you
doing there? Nobody told me... A secret mission for Dick and Sarah? What
the fuck---"
I listen to him for a couple of moments with some amusement as Wes
attempts to get to the bottom of the situation with Brent. Finally I
hear him say, "Hang on a second. Let me find out what Bill wants to
do..." as he picks up his cell phone again.
"Okay, you must have heard some of that, right?" he says to me.
"Tell him I'm calling him right now."
After I hang up, I dial up Brent, wondering what Sarah has done now.
"Hi, Bill," I hear him say.
"Mind telling me what's going on and why you're in Des Moines?" I ask
politely.
"Nobody from Dick's office told you?" he asks. When I don't say
anything, he continues, "Dick and the finance team rushed me out the
door yesterday morning to be a part of a task force to create a plan to
split up the company. Apparently, this is a top priority project, and
they need to figure out what the implications to all the
[IT]{.smallcaps} systems are."
"And why did Dick put you on the team?" I ask.
"I don't know," he replies. "Trust me, I don't want to be here. I hate
airplanes. They should have one of their business analysts doing this,
but maybe it's because I know the most about how the major systems
connect to one another, where they all reside, all the services they
depend on... By the way, I can tell you right now that splitting up the
company will be a complete nightmare."
I remember when I led the acquisition integration team when we acquired
the large retailer. That was a huge project. Splitting the company up
may be even more difficult.
If this is going to impact every one of the hundreds of applications we
support, Brent is probably right. It will take years.
[IT]{.smallcaps} is everywhere, so it's not like cutting off a limb.
It's more like splitting up the nervous system of the company.
Remembering that Dick and Sarah yanked one of my key resources away from
me without even asking, I say slowly and deliberately, "Brent, listen
carefully: Your most important priority is to find out what your Unicorn
teammates need and get it to them. Miss your flight if you have to. I'll
make some phone calls, but there's a good chance that my assistant Ellen
will book you a return flight home tonight. Do you understand?"
"You want me to deliberately miss my flight," he says.
"Yes."
"What will I tell Dick and Sarah?" he asks, uncertainly.
I think for a moment. "Tell them I need you on an emergency call, and
that you'll catch up with them."
"Okay..." he says. "What's going on here?"
"It's simple, Brent," I explain. "Unicorn is the one last hope we have
of hitting our quarterly number. One more blown quarter, and the board
will surely split the company apart, and you'll be able to help the task
force then. But if we hit our numbers, we have a shot at keeping the
company together. That's why Unicorn is our absolute highest priority.
Steve was very clear on this."
Brent says dubiously, "Okay. Just tell me where to go, and I'll be
there. I'll leave you to argue with the mucky-mucks." He is clearly
annoyed by the mixed signals being sent to him.
But not nearly as annoyed as I am.
I call Steve's assistant Stacy and tell her I'm on my way.
------------------------------------------------------------------------
*As I make my trek* to Building 2 to find Steve, I call Wes.
"You did what?" he chortles. "Just great. You're now in the middle of a
political battle with Steve on one side and Dick and Sarah on the other.
And, quite frankly, I'm not sure you chose the winning side."
After a moment, he says, "You really think Steve is going to back us up
on this one?"
I suppress a sigh. "I sure hope so. If we don't get Brent back
full-time, Unicorn is sunk. And that probably means that we'll get a new
[CEO]{.smallcaps}, get outsourced, and also figure out how to split up
the company. That sound like a fun job to you?"
I hang up and walk into Steve's office. He smiles wanly and says, "Good
morning. Stacy says you have some bad news for me."
As I tell him what I learned during my phone call with Brent, I'm
surprised to see his face turn scarlet. I would have thought he knew
about all of this, given that he's the [CEO]{.smallcaps}.
Obviously not.
After a moment, he finally says, "The board assured me that they
wouldn't go further down the company breakup path until we see how this
quarter turns out. I suppose they ran out of patience."
He continues, "So tell me what the impact is to Unicorn if Brent gets
reassigned."
"I've talked with Chris, Wes, and Patty," I reply. "Project Unicorn
would be completely sunk. I'm a skeptical guy by nature, but I really
think Unicorn is going to work. With Thanksgiving only two weeks away,
Brent owns a significant portion of getting the capabilities we need
built. And by the way, many of the breakthroughs we're making are
starting to be copied by the Phoenix team, which is fantastic."
To underscore my point, I say with finality, "Without Brent, we will not
be able to hit any of the sales and profit goals that we've tied to
Unicorn. No chance."
Pursing his lips, Steve asks, "And what happens if you backfill Brent
with your next best guy?"
I relay to Steve what Wes told me, which mirrored my own thinking.
"Brent is very unique. Unicorn needs someone who has the respect of the
developers, has enough deep experience with almost every sort of
[IT]{.smallcaps} infrastructure we have, and can describe what the
developers need to build so that we can actually manage and operate in
production. Those skills are rare, and we don't have anyone else that
can rotate into this special role right now."
"And what if you assign your next best person to Dick's task force?" he
asks.
"I'd guess that the breakup planning won't be as accurate but could
still get completed just fine," I reply.
Steve leans back in his chair, saying nothing.
Finally he says, "Get Brent back here. I'll handle the rest."
[]{#36-ch33.xhtml}
# Chapter 33 {.ch-title}
## • Tuesday , November 11 {.dateline}
*By the next day, Brent is back on Unicorn,* and one of the level 3
engineers has joined Dick's team somewhere in the snowy Midwest. Within
hours, I get copied on an e-mail from Sarah:
::: block
From: Sarah Moulton
To: Bob Strauss
Cc: Dick Landry, Steve Masters, Bill Palmer
Date: November 11, 7:24 [AM]{.smallcaps}
Subject: Someone is undermining Project Talon
Bob, I've discovered that Bill Palmer, the acting [VP]{.smallcaps} of
[IT]{.smallcaps} Operations, stole the critical resource for Project
Talon.
Bill, I'm deeply concerned with your recent actions. Please explain to
us why you ordered Brent to return home? This is absolutely intolerable.
The board has instructed us to explore strategic options.
I demand that Brent rejoin the Talon team as soon as possible. Please
confirm you understand this message.
Sarah
:::
Genuinely alarmed that I'm being called out on an e-mail to the company
chairman, I call Steve, who is obviously furious at Sarah's apparent
change in loyalties. After swearing under his breath, he assures me that
he'll handle this and that I am to continue as planned.
At the daily Unicorn stand-up meeting, William doesn't look happy. "The
good news is that as of last night, we've generated our first customer
promotion report and it appears to be working correctly. But the code is
running fifty times slower than we expected. One of the clustering
algorithms isn't parallelizing like we thought it would, so the
prediction runs are already taking more than twenty-four hours, even for
our small customer data set test."
Grumbles and groans go around the room.
One of the developers says, "Can't we just use brute force? Just throw
more hardware at the problem. With enough compute servers, we can bring
the run times down."
"Are you kidding me?" Wes says, with exasperation. "We only budgeted for
twenty of the fastest servers we could find. You'd need over a thousand
servers to get the run times down to where we need. That's over \$1
million in unbudgeted capital!"
I purse my lips. Wes is right. Phoenix is way over budget as it is, and
we're talking about a large enough amount of money that it'll be
impossible to get this approved, especially given our financial
condition.
"We don't need any new hardware," the developer replies. "We've invested
all this effort to create compute images that we can deploy. Why not
send them out to the cloud? We could spin up hundreds or thousands of
compute instances as we need them, tear them down when we're done, and
just pay for the compute time we use."
Wes looks at Brent, who says, "It's possible. We're already using
virtualization for most of our environments. It shouldn't be very
difficult to convert them so that they run on a cloud computing
provider."
After a moment, he adds, "You know, that would be fun. I've always
wanted to try something like this."
Brent's excitement is contagious.
We start assigning tasks to investigate its feasibility. Brent teams up
with the developer who had suggested the idea to do a quick prototype,
to see whether it is even possible.
Maggie, who has taken such an interest in Unicorn that she's routinely
attending the daily stand-ups, volunteers to look into pricing and will
call her peers in the industry to see if any of them have done this
before and to get any recommended vendors.
One of John's security engineers interrupts, "Sending our customer data
to the cloud may have some risks like accidental disclosure of private
data or someone unauthorized hacking into those compute servers."
"Good thinking," I say. "Can you list your top risks we should be
thinking about, and prepare a list of potential countermeasures and
controls?"
He smiles in response, happy to be asked. One of the developers
volunteers to work with him.
By the end of the meeting, I'm surprised at the unanticipated payoffs of
automating our deployment process. The developers can more quickly scale
the application, and potentially few changes would be required from us.
Despite this, I'm extremely dubious of all this cloud computing
hullabaloo. People treat it as if it's some sort of magical elixir that
instantaneously reduces costs. In my mind, it's just another form of
outsourcing.
But if it solves a problem we're having, I'm willing to give it a try. I
remind Wes to keep an open mind, as well.
------------------------------------------------------------------------
*A week later, once again,* it's demo time. We're all standing in the
Unicorn team area. It's the end of the sprint, and the Development lead
is eager to show off what the team has accomplished.
"I can hardly believe how much we got done," he starts off. "Because of
all the deployment automation, getting compute instances running in the
cloud wasn't as hard as we thought. In fact, it's working so well that
we're considering turning all the in-house Unicorn production systems
into test systems and using the cloud for all our production systems.
"We start the recommendations reporting run every evening and spin up
hundreds of compute instances until we're done, and then we turn them
off. We've been doing this for the past four days, and it's working
well---really well."
Brent has a wide smile on this face, as does the rest of the team.
Next up is usually the product manager, but this time Maggie is
presenting instead. She's obviously taking more than just casual
interest in this project.
She pulls up a PowerPoint slide on the projector. "These are the Unicorn
promotions generated for my customer account. As you can see, it's
looked at my buying history and is letting me know that snow tires and
batteries are fifteen percent off. I actually went to our website and
purchased both, because I need them. The company just made money,
because those are all items that we have excess inventory and high
profit margins."
I smile. Now that's brilliant.
"And, here are the Unicorn promotions for Wes," she continues, going to
the next slide, with a smile. "Looks like you got a discount on racing
brake pads and fuel additives. That of any interest to you?"
Wes smiles. "Not bad!"
Maggie explains that all these offers are already in the Phoenix system,
and it was just waiting for the promotion functionality to finally get
them to the customers.
She continues, "Here's my proposal: I'd like to do an e-mail campaign to
one percent of our customers, to see what happens. Thanksgiving is in
one week. If we could do a couple of trials and everything goes well,
we' d go full blast on Black Friday, which is the busiest shopping day
of the year."
"Sounds like a good plan," I say. "Wes, is there any reason why we
shouldn't do this?"
Wes shakes his head. "From an Ops perspective, I can't think of any. All
the hard work has already been done. If Chris, William, and Marketing
have confidence that the code is working, I say go for it."
Everyone agrees. There are some issues that come up, but Maggie says her
team is willing to work all night to make it happen.
I smile inwardly. For once, it won't be just us staying up all night
because something went really wrong. In fact, it's the exact opposite.
People are staying up all night because everything was going right.
------------------------------------------------------------------------
*The following Monday,* it's barely above freezing as I'm driving to
work, but the sun is shining brightly. It looks like it's going to be a
great week for the upcoming Thanksgiving holiday. Throughout the
weekend, I'm a bit startled to see commercials with Santa Claus in them.
When I get to my office, I throw my heavy coat over my chair. I turn
when I hear Patty walk into my office and see that she has a broad smile
on her face. "Did you hear the amazing news from Marketing?"
When I shake my head, she merely says, "Read the e-mail that Maggie just
sent out."
I flip open my laptop and read:
::: block
From: Maggie Lee
To: Chris Allers, Bill Palmer
Cc: Steve Masters, Wes Davis, Sarah Moulton
Date: November 24, 7:47 [AM]{.smallcaps}
Subject: First Unicorn promotion campaign: [UNBELIEVABLE]{.smallcaps}!
The Marketing team burned the midnight oil over the weekend and we were
able to do a test campaign to one percent of our customers.
The results were [STELLAR]{.smallcaps}! Over twenty percent of the
respondents went to our website, and over six percent purchased. These
are incredibly high conversion rates---probably over 5× higher than any
campaign we've done before.
We recommend doing a Unicorn promotion to all our customers on
Thanksgiving Day. I'm working to get a dashboard up so everyone can see
real-time results of the Unicorn campaigns.
Also, remember that all the items being promoted are high margin items,
so the effects on our bottom line will be excellent.
[PS]{.smallcaps}: Bill, based on the results, we expect a huge surge in
web traffic. Can we make sure the website won't fall over?
Great work, all!
Maggie
:::
"I love it," I say to Patty. "Work with Wes to figure out what we need
to do to handle the surge in traffic. We've only got three days to get
this done, so we don't have much time. We don't want to screw this up
and turn prospective customers into haters."
She nods and is about to respond when her phone vibrates. An instant
later, my phone vibrates, too. She quickly looks down and says, "The
dragon lady strikes again."
"I wish I had an 'unsubscribe' button for her e-mails," Patty says as
she walks out.
A half hour later, Steve sent out a congratulatory note to the entire
Unicorn team, which everyone loved reading. More surprisingly, he also
sent out a public reply to Sarah, demanding that she stop "stirring the
pot and making trouble" and to "see me at your earliest convenience."
That still didn't stop all the public e-mails going back and forth among
Sarah, Steve, and Bob. Seeing Sarah toadying up to our new chairman,
Bob, was awkward and uncomfortable. It's like Sarah didn't even care how
obvious she was being and all the bridges she was burning.
I walk into a meeting room to meet John about the resolution of all the
[SOX]{.smallcaps}-404 and Unicorn security issues. He's wearing a
pin-striped Oxford shirt and a vest, complete with cufflinks. He looks
like he just came out of a *Vanity Fair* photo shoot, and I guess he's
continuing to shave his head daily.
"I'm amazed at how quickly the Unicorn security fixes are being
integrated," he says. "Compared to the rest of Phoenix, fixing Unicorn
security issues is a breeze. The cycle time is so short, we once put in
a fix within an hour. More typically, we can get fixes in within a day
or two. Compared to this, remediating Phoenix issues is like pulling our
own teeth out, without any anesthesia. Normally, we' d have to wait for
a quarter for any meaningful changes to be made, and jumping through all
the hoops required to get an emergency change order through was almost
not worth the trouble.
"Really," he continues, "patching is so easy, because we can rebuild
anything in production with a touch of a button. If it breaks, we can
build it again from scratch."
I nod. "I'm amazed at the what we can do with the fast Unicorn cycle
times, too. With Phoenix, we only rehearsed and practiced doing the
deployments once per quarter. Just in the last five weeks, we've done
over twenty Unicorn code and environment deployments. It almost feels
routine. As you said, it's the opposite of Phoenix."
John says, "Most of the reservations I had about Unicorn don't seem
valid anymore. We've put in regular checks to make sure that the
developers who have daily access to production only have read-only
access, and we're making good progress on integrating our security tests
into the build procedures. I'm pretty confident that any changes that
could affect data security or the authentication modules will get caught
quickly."
He leans back, crossing his arms behind his head. "I was scared shitless
of how we' d gain any sort of assurance about securing Unicorn. It's
partly because we're so used to taking a month to turn around
application security review. In an emergency, like in response to a
high-priority audit, we could sometimes turn things around in a week.
"But the notion of having to keep up with ten deploys a day?" he
continues. "Complete lunacy! But after being forced to automate our
security testing, and integrating it into the same process that William
uses for his automated [QA]{.smallcaps} testing, we're testing every
time a developer commits code. In many ways, we now have better
visibility and code coverage than any of the other applications in the
company!"
He adds, "You should know that we just closed out the last of the
[SOX]{.smallcaps}-404 issues. We were able to prove to the auditors,
thanks in large part to the new change control processes you put in,
that all the current controls are sufficient, closing out the three-year
repeat audit finding."
With a smile, he adds, "Congratulations, Bill. You've done what none of
your predecessors have been able to do, which is to finally get the
auditors off our back!"
Much to my surprise, the short week goes smoothly. Before everyone
leaves on Wednesday for the Thanksgiving holiday, the big Unicorn
campaign is ready. Code performance is still ten times slower than we
need, but we're okay for now because we can just spin up hundreds of
compute instances in the cloud.
We had a genuine showstopper when [QA]{.smallcaps} discovered that we
were recommending items that were out of stock. That would have been
disastrous, as customers would excitedly click on the promotion, only to
find them listed as "backordered." Incredibly, Development developed a
fix within a day, and it was deployed within an hour.
It's 6 p.m. and I pack up my stuff, looking forward to the long weekend.
We've all earned it.
[]{#37-ch34.xhtml}
# Chapter 34 {.ch-title}
## • Friday, November 28 {.dateline}
*By midday Thursday,* right in the middle of Thanksgiving, we knew we
were in trouble. The overnight Unicorn e-mail promotion was an
incredible success. The response rate was unprecedentedly high, with
traffic to our website surging to record levels, which kept bringing
down our e-commerce systems.
We initiated an emergency Sev 1 call, putting in all sorts of emergency
measures to maintain our ability to take orders, including putting more
servers into rotation and turning off computationally-intensive
features.
Ironically, one of the developers suggested turning off all the
real-time recommendations, which we had worked so hard to build. Why
recommend more products to buy, he argued, if customers can't even
complete a transaction?
Maggie quickly agreed, but it still took the developers two hours to
change and deploy. Now, this feature can be disabled with a
configuration setting, so we can do it in minutes next time around,
instead of requiring a full code rollout.
Now that's what I call designing for [IT]{.smallcaps} Operations! It's
getting easier and easier to manage the code in production.
We also kept optimizing database queries and moving the largest site
graphics to a third-party content distribution network, offloading more
traffic from our servers. By late Thanksgiving afternoon, the customer
experience had improved to something tolerable.
The real trouble began the following morning. Although it is an official
company holiday, I've called everyone one of my staff back into the
office.
Wes, Patty, Brent, and Maggie are here for the noon meeting. Chris is
here, but has apparently decided that being called in today demanded a
different dress code. He's wearing a garish Hawaiian shirt and jeans and
has brought in coffee and doughnuts for everyone.
Maggie convened the meeting a couple of minutes ago. "This morning, our
store managers opened up their locations for Black Friday. From the
moment they opened the doors, people poured in, waving around printouts
of their Unicorn promotion e-mails. In-store traffic today is at record
levels. The problem is that the promoted items are now almost completely
gone. Our store managers started panicking because customers were
leaving angry and empty-handed.
"When store managers try to issue rain checks or get an item shipped to
the customer, they're having to manually key in the order from our
warehouse. It's taking them at least fifteen minutes per order, which is
resulting in long lines at the stores and more frustrated customers."
Just then, the speakerphone on the table beeps. "Sarah dialing in. Who's
on the line?"
Maggie rolls her eyes, and several other people mutter to one another.
Sarah's attempts to undermine Unicorn are well known now. Maggie has to
take two minutes to announce everyone on the call and catch her up.
"Thank you," Sarah says. "I'll remain on the call. Please continue."
Maggie thanks her politely and begins brainstorming on how to solve the
problems.
An hour later, we generated twenty actions we'll be tackling all weekend
long. We'll be putting up a web page for store personnel where they can
type in the coupon promotion code, which will automate the
cross-shipment from our warehouses. In addition, we'll create a new form
on the customer account web page where they can get items delivered
directly to them.
It's a long list.
By Monday morning, the situation has stabilized. Which is good, because
we have our weekly Unicorn meeting with Steve.
Chris, Wes, Patty, and John are here. Unlike our previous meetings,
Sarah is here, too. She sits with her arms crossed, occasionally
uncrossing them to tap out messages to someone on her iPhone.
Steve says to all of us with a wide smile, "I want to congratulate you
for all your hard work. It has paid off beyond my wildest expectations.
Thanks to Unicorn, both in-store and web sales are breaking records,
resulting in record weekly revenue. At the current run rate, Marketing
estimates that we'll hit profitability this quarter. It will be our
first profitable quarter since the middle of last year.
"My heartiest congratulations to you all," he says.
Everyone except Sarah smiles at the news.
"That's only half the story, Steve," Chris says. "The Unicorn team is
kicking butt. They've moved from doing deployments every two weeks to
every week, and we're now experimenting with doing daily deployments.
Because the batch size is so much smaller, we can make small changes
very quickly. We're now doing [A/B]{.smallcaps} testing all the time. In
short, we've never been able to respond to the market this quickly, and
I'm sure there are more rabbits we can pull out of this hat."
I nod emphatically. "I suspect we'll want to follow the Unicorn model
for any new applications we develop internally. It's easier to scale, as
well as easier to manage, than any application we've supported in the
past. We're setting up the processes and procedures so that we can
deploy at whatever rate it takes to quickly respond to customers. In
some cases, we're even enabling developers to deploy the code. The
developer will be able to push a button and within several minutes, the
code will be in the testing environment or in production."
"I can't believe how far we've come in such a short time. I'm proud of
all of you," Steve says. "I want to commend you for truly working
together and being worthy of one another's trust."
"Better late than never, I suppose," Sarah says. "If we're done
congratulating ourselves, I've got a business wake-up call for you.
Earlier this month, our largest retail competitor started partnering
with their manufacturers to allow custom build-to-order kits. Sales of
some our top selling items are already down twenty percent since they
launched this offering."
Angrily, she adds, "For years, I've been trying to get [IT]{.smallcaps}
to build out the infrastructure to enable this capability, but all we
heard was, 'no, it can't be done.' Meanwhile, our competition has been
able to work with any manufacturer who says yes."
She adds, "That's why Bob's idea of splitting up the company has so much
merit. We're being shackled by the legacy manufacturing side of this
business."
What? Buying the retail firm was her idea! Maybe life would have been
easier for everyone if she had just gone to work for a retailer.
Steve frowns. "This is the next agenda item. As [SVP]{.smallcaps} of
Retail Operations, it's Sarah's prerogative to bring business needs and
risks to this team."
Wes snorts. To Sarah, he says, "You're kidding, right? Do you understand
what we just achieved with Unicorn, and how fast we did it? What you're
describing isn't that difficult, compared to what we just pulled off."
------------------------------------------------------------------------
*The next day,* Wes walks in wearing an uncharacteristically glum face.
"Uh, boss. I hate to say it, but I don't think it can be done."
When I ask him to explain, he says, "To do what our competitor is doing,
we' d have to completely rewrite our manufacturing resource planning
system that supports all the plants. It's an old mainframe application
that we've used for decades. We outsourced it three years ago. Mostly
because old people like you were going to retire soon.
"No offense," he adds. "We laid off many of our mainframe people years
ago---they were making salaries way above the norm. Some outsourcer
convinced our [CIO]{.smallcaps} at the time that they had the
gray-haired workforce that could keep our application on life-support
until we retired it. Our plan was that we would replace with a newer
[ERP]{.smallcaps} system, but obviously, we never got around to it."
"Dammit, we're the customer and they're our supplier," I say. "Tell them
that we're paying them not just to maintain the application but also to
make any needed business changes. According to Sarah, we need this
change. So find out how much they want to charge us and how long we'll
have to wait."
"I did that," Wes says, pulling out a ream of paper from under his arm.
"Here's the proposal they finally sent after I managed to get the stupid
account manager out of the way so I could actually talk to one of the
technical analysts.
"They want six months to gather the requirements, another nine months to
develop and test, and if we're lucky, we might be able to put it into
production one year from now," he continues. "The problem is, the
resources we need aren't available until June. So, we're talking about
eighteen months. Minimum. To even start the process, they would need
\$50[K]{.smallcaps} for the feasibility study and to secure a slot in
their development schedule."
Wes is bright red now, shaking his head. "That worthless account manager
keeps insisting that the contract just won't allow him to help us.
Bastard. Obviously, his job is to make sure that everything that can be
billed for is, and to dissuade us from doing anything not on the
contract, like development."
I exhale loudly, thinking through the implications. The constraint
preventing us from going where we need to go is now outside our
organization. But if it's outside the organization, what can we possibly
do? We can't convince an outsourcer to change their priorities or their
management practices as we've done.
Suddenly, a glimmer of an idea hits me.
"How many people do they have allocated to our account?" I ask.
"I don't know," Wes says. "I think there are six people assigned at
thirty percent allocation. It probably depends on their role."
"Get Patty in here, along with a copy of the contract, and let's work
through the math. And see if you can grab someone from Purchasing, too.
I have an audacious proposal that I'd like to explore."
------------------------------------------------------------------------
*"Who outsourced the* *[MRP]{.smallcaps}* *application?"* Steve asks
from behind his desk.
I'm sitting in Steve's office with Chris, Wes, and Patty, with Sarah
standing off to the side, whom I try to ignore.
I explain our idea to Steve again. "Many years ago, we decided that this
application wasn't a critical part of the business, so we outsourced it
to cut costs. Obviously, they didn't view it as a core competency."
"Well, it's obviously a core competency now!" replies Steve. "Right now,
that outsourcer is holding us hostage, preventing us from doing
something that needs to be done. They're more than just a roadblock.
They're now jeopardizing our future."
I nod. "In short, we' d like to break the outsourcing contract early,
bringing those resources back into the company. We're talking about
approximately six people, some of whom are still onsite. To buy out the
remainder of the contract two years early would be almost one million
dollars, and we would regain complete control of the [MRP]{.smallcaps}
application and underlying infrastructure. Everyone on this team
believes this is the right thing to do, and we've even got the initial
blessing from Dick's team."
I hold my breath. I just threw out a very a big number. It's
considerably bigger than the budget increase I asked for two months ago
when I got thrown out of this office.
I quickly continue, "Chris believes that once this [MRP]{.smallcaps}
application is back in-house, we could build an interface to Unicorn. We
would then start building the manufacturing capability to move us from
'build to inventory' to 'build to order,' which would enable us to
provide the custom kits as Sarah requested. If we execute everything
flawlessly, and the integration with the order entry and inventory
management systems goes as planned, we could match what our competitors
are doing in about ninety days."
Out of the corner of my eye, I can see the wheels turning furiously in
Sarah's head.
Steve doesn't shoot down the idea down right away. "Okay, you have my
attention. What are the top risks?"
Chris takes this one. "The outsourcer may have made big changes to the
code base that we don't know about, which would slow down the
development schedule. But my personal belief is that this risk is
minimal. Based on their behavior, I don't think they made any
significant changes to functionality.
"I'm not worried about the technical challenges," he continues. "The
[MRP]{.smallcaps} was not designed for large batch sizes and certainly
not batch sizes of one that we're talking about here. But I'm sure we
can make something work short-term and figure out a long-term strategy
as we go."
When Chris finishes, Patty adds, "The outsourcer could also decide to
make the transition back to us difficult, and there could be animosity
from the affected engineers. There were a lot of hard feelings when we
announced the contract---among other things, their pay was cut the
instant they switched from being Parts Unlimited employees to being a
vendor."
She continues. "We should get John involved right away, because we'll
need to take away access from all the outsourcer staff that we're not
bringing back in."
Wes laughs, saying, "I'd like to personally delete the login credentials
of that jackass account manager. He's a jerk."
Steve is listening attentively. He then turns to Sarah and asks, "Your
thoughts on the team's proposal?"
She says nothing for several moments but eventually says imperiously, "I
think we need to check with Bob Strauss and get full board approval
before we undertake a project this big and risky. Given the previous
performance of [IT]{.smallcaps}, this could jeopardize all of our
manufacturing operations, which is more risk than I think we should take
on. In short, I personally do not support this proposal."
Steve studies Sarah, saying with a thin-lipped smile, "Remember that you
work for me, not Bob. If you can't work within that arrangement, I will
need your immediate resignation."
Sarah turns white, her jaw dropping, obviously realizing she's badly
misplayed her hand.
Struggling to regain her composure, she laughs nervously at Steve's
comment, but no one else joins in. I furtively look at my colleagues,
and see that, like me, their eyes are wide, watching this drama unfold.
Steve continues, "On the contrary, thanks to [IT]{.smallcaps}, we may no
longer need to consider all the onerous strategic options that you and
Bob are preparing, but your point is well taken."
To the rest of us, Steve says, "I'm assigning you one of Dick's best
people and our corporate counsel. They'll help you flawlessly execute
this project and make sure we use every trick in the book to get what we
need from the outsourcer. I'll make sure Dick gives this project his
personal attention."
Sarah's eyes widen even further. "That's an excellent idea, Steve. That
would significantly reduce our risk here. I think Bob will really like
it."
The expression on Steve's face suggests that his patience for her
theatrics is nearly at an end.
He asks us if there's anything else we need. When there isn't, he
excuses everyone but asks Sarah to remain behind.
As we leave, I sneak a peek behind us. Sarah is sitting down where I
previously sat, nervously watching everyone file out. Catching her eye,
I smile at her and close the door.
[]{#38-ch35.xhtml}
# Chapter 35 {.ch-title}
## • Friday, January 9 {.dateline}
*I grip the steering wheel nervously* as I drive to Steve's house. He's
throwing a party for everyone who has worked so hard on Phoenix and
Unicorn, inviting people from both the business and [IT]{.smallcaps}.
The roads are uncharacteristically icy, with no melting even after weeks
of sunshine. It was treacherous enough that Paige and I decided to stay
at home for New Year's Eve instead of celebrating with her family as we
usually do.
It's been over a month since that last meeting with Steve and Sarah. We
haven't seen much of Sarah since then.
As I'm driving, I contemplate how quiet it's been. I keep expecting
someone to call in another Sev 1 incident. Instead, my phone just sits
in the cup holder, completely silent---like yesterday---and the day
before that.
I can't say that I miss all of the excitement, but there are times now
when I literally have nothing to do.
Thankfully, I'm now coaching all my managers through our two-week
improvement cycles, according to the Improvement Kata, which keeps me
from feeling totally useless. I'm especially proud that for an entire
month, my group hit our target of spending fifteen percent of our time
on preventive infrastructure projects. And it shows.
We're using the entire budget we've been allocated. We're closing our
monitoring gaps, we've refactored or replaced our top ten fragile
artifacts so that they're more stable, and the flow of planned work is
faster than ever. Against my expectations, everyone jumped
enthusiastically on Project Narwhal otherwise known as the "Simian Army
Chaos Monkey" project. Like the legendary stories of the original Apple
Mac [OS]{.smallcaps} and Netflix cloud delivery infrastructure, we
deployed code that routinely created large-scale faults, thus randomly
killing processes or entire servers.
Of course, the result was all hell breaking loose for an entire week as
our test, and occasionally, production infrastructure crashed like a
house of cards. But, over the following weeks, as Development and
[IT]{.smallcaps} Operations worked together to make our code and
infrastructure more resilient to failures, we truly had [IT]{.smallcaps}
services that were resilient, rugged, and durable.
John loved this, and started a new project called "Evil Chaos Monkey."
Instead of generating operational faults in production, it would
constantly try to exploit security holes, fuzz our applications with
storms of malformed packets, try to install backdoors, gain access to
confidential data, and all sorts of other nefarious attacks.
Of course, Wes tried to stop this. He insisted that we schedule
penetration tests into predefined time frames. However, I convinced him
this is the fastest means to institutionalize Erik's Third Way. We need
to create a culture that reinforces the value of taking risks and
learning from failure and the need for repetition and practice to create
mastery.
I don't want posters about quality and security. I want improvement of
our daily work showing up where it needs to be: in our daily work.
John's team developed tools that stress-tested every test and production
environment with a continual barrage of attacks. And like when we first
released the chaos monkey, immediately over half their time was spent
fixing security holes and hardening the code. After several weeks, the
developers were deservedly proud of their work, successfully fending off
everything that John's team was able to throw at them.
These are the thoughts going through my head as I wind my way toward
Steve's house. The sprawling grounds are all covered by snow, hiding the
immaculately manicured lawns.
When I ring the doorbell an hour early, as Steve requested, I hear loud
barking and then the sounds of a very large dog slipping on a hardwood
floor, crashing into the door.
"Come on in, Bill. It's great seeing you again," Steve says, holding the
dog's collar and gesturing toward the kitchen with a skewer of
vegetables in the other hand. When we get to the kitchen, he points to
the counter in front of him, where a large metal bucket of ice sits,
full of bottles. "You want anything to drink? Beer? Soda? Scotch?"
Looking around, he adds, "Margarita?"
I grab a beer out of the bucket, thank him, and then give him a quick
summary of my somewhat boring day as he moves me to the living room.
Steve smiles. "Thanks for coming over early. We're going to have a
record-breaking quarter. We couldn't have done it without you and Chris.
For the first time in years, our market share is up! You know, I wish I
could see the looks on our competitors' faces. They're probably
scrambling, trying to figure out how we did it."
Steve is smiling broadly. "I actually saw Dick crack a smile the other
day. Well, he showed his teeth, at least. Project Unicorn and that new
project, Narwhal, are helping us understand what are customers actually
want. Our average order size just hit a record last week, and Dick said
that Unicorn had the fastest payback of any project we've done in recent
memory."
He continues, "The analysts are starting to love us again. One told me
last week that if we execute well, it'll be very difficult for our
nonintegrated competitors to follow us. No doubt, they'll be raising our
stock price targets, and Bob is finally withdrawing his support to split
up the company."
"Really?" I say, raising my eyebrows in surprise. "I thought that Sarah
was convinced that splitting up the company was the only way for us to
survive."
"Ah, yes..." he says. "She's decided to look for other options elsewhere
and is on a leave of absence."
My jaw drops. If I'm hearing this correctly, Sarah is being eased out of
the company. I smile.
"By the way," Steve says. "Project Narwhal? Project Unicorn? Can't you
guys come up with better names than that?"
I laugh. "No one is more upset about it than Maggie. She's convinced
that all her product managers are laughing at her. She's told her
husband that if the next project is called 'Hello Kitty,' she'll quit."
He laughs. "As you can guess, though, I didn't ask you to come early to
critique your project names. Have a seat."
As I settle into a cushy armchair, he starts to explain. "We've had an
open position for the [CIO]{.smallcaps} for months. You've been a part
of that interview process. What have you thought of the candidates?"
"Honestly? I was disappointed," I say slowly. "They were all senior
people with a lot more experience than me. They kept talking about tiny
parts of the problem. They proposed only a fraction of what we've done
in the past couple of months here at Parts Unlimited. I feel that if
they signed on, we' d be at considerable risk of going back to all the
bad old ways."
"I agree with you, Bill. Which is why I've decided that we should fill
this position internally. You have any suggestions on who we should
promote?"
I go through the possible candidates in my mind. It's not a long list.
"I think Chris is the obvious choice. He was the driving force behind
Unicorn, as well as Narwhal. If it weren't for his leadership, I'm
pretty sure we' d still be stuck dead in the water."
He smiles. "You know, it's funny. Everyone thought you'd say that.
However, I won't be following your recommendations."
He continues, "This is going to take a while to explain. You were
everyone's unanimous choice to become [CIO]{.smallcaps}. But to be
brutally candid, I don't want you there."
Reacting to my obvious distress, he says, "Hey, relax. Let me explain.
My board holds me responsible for making the best use of company
resources to achieve the goals that maximize shareholder value. My
primary job is to lead my management team to make that happen."
He stands up, walking over to the window, looking out at the
snow-covered yard. "You've helped me see that [IT]{.smallcaps} is not
merely a department. Instead, it's pervasive, like electricity. It's a
skill, like being able to read or do math. Here at Parts Unlimited, we
don't have a centralized reading or math department---we expect everyone
we hire to have some mastery of it. Understanding what technology can
and can't do has become a core competency that every part of this
business must have. If any of my business managers are leading a team or
a project without that skill, they will fail."
He continues, "I need each and every one of my business managers to take
calculated risks, without jeopardizing the entire enterprise. People
everywhere in the business are using technology, so it's like the Wild
West again---for better or for worse. Businesses that can't learn to
compete in this new world will perish."
Turning back to me, he says, "In order for Parts Unlimited to survive,
the business and [IT]{.smallcaps} can't make decisions exclusive of each
other. I don't know where this is all going, but I know the way we're
organized now, we're not firing on all cylinders.
"I've been discussing this with my board for the last couple of months,"
he says, sitting down, staring right at me. I know this expression. It's
like my first meeting with him last year. This is what he looks like
when he's trying to seduce someone. "I'm impressed with your performance
and what you've done with [IT]{.smallcaps}. You used the same skills
that I would expect anyone leading one of our large manufacturing
divisions to use.
"Now I want to see you grow and learn, and build new skills to best help
all of Parts Unlimited. If you're up to it, I am prepared to invest in
you. I want to put you on a fast track, two-year plan. You'll do
rotations in sales and marketing, manage a plant, get international
experience, manage the relationships of our most critical suppliers, and
manage our supply chain. Trust me, this will not be a vacation. You're
going to need help---a lot of it. Erik has kindly agreed to mentor you,
because we both believe this will be the most difficult thing you've
ever done.
"But," he continues, "if you achieve each of fifteen specific
performance targets we've laid out for you, we'll move you into a
provisional Chief Operating Officer role in two years, where you'll work
closely with Dick while he gets ready to retire. If you work hard, get
results and play your cards right, you'll be the next [COO]{.smallcaps}
of the company in three years."
I feel my jaw hanging open, my beer bottle dripping water onto my leg.
"You don't have to answer now," he says, obviously satisfied that his
pitch is having the desired effect. "Half my board thinks I'm crazy.
Maybe they're right, but I trust my instincts. I don't know how this is
going to shape up, but I have confidence that this is what's best for
the company. My gut tells me that in ten years, when we're mopping the
last pieces of our competition off the floor, this is the gamble that
will have made that possible.
"While we're dreaming big dreams here, let me say this," he continues.
"In ten years, I'm certain every [COO]{.smallcaps} worth their salt will
have come from [IT]{.smallcaps}. Any [COO]{.smallcaps} who doesn't
intimately understand the [IT]{.smallcaps} systems that actually run the
business is just an empty suit, relying on someone else to do their
job."
Steve's vision takes my breath away. He's right. Everything my team has
learned, as well as what Chris and John have learned, shows that when
[IT]{.smallcaps} fails, the business fails. It stands to reason that if
[IT]{.smallcaps} is organized so that it can win, the business wins,
too.
And Steve wants to put me on the vanguard of this movement.
Me. A technology operations guy.
Suddenly, I think of how one of Erik's higher ups decided to mustang him
from a senior [NCO]{.smallcaps} to a lowly lieutenant, forcing him to
climb the ladder again from the very bottom of the officer ranks.
Obviously, Erik had the courage to do it, and the rewards for him (and
his family, if he has one) seem pretty evident. He's living a life that
seems to have transcended our mortal plane of existence.
As if Steve knows what I'm thinking, he says, "You know, when Erik and I
first met, many months ago, he said that the relationship between
[IT]{.smallcaps} and the business is like a dysfunctional
marriage---both feel powerless and held hostage by the other. I've
thought about this for months, and I finally figured something out.
"A dysfunctional marriage assumes that the business and [IT]{.smallcaps}
are two separate entities. [IT]{.smallcaps} should either be embedded
into business operations or into the business. Voilà! There you go. No
tension. No marriage, and maybe no [IT]{.smallcaps} Department, either."
I just stare at Steve. In some Erik-like way, something about what he
says seems inescapably true.
In that moment, I decide. I'll still have to talk with Paige, but I know
with certainty that the journey Steve wants to send me on is
important---both for me and my family and for my entire profession.
"I'll think about it," I say, solemnly.
Steve smiles broadly and stands up. When I grasp his outstretched hand,
he clasps my shoulder firmly. "Good. This is going to be fun."
Just then, the doorbell rings, and within a few minutes, the whole gang
is here---Wes, Patty, John, and Chris---so are Maggie, Brent, Ann,
[]{#38-ch35.xhtml__idTextAnchor000}and, holy crap, even Dick and Ron.
As the party starts to get louder and louder, each of them congratulate
me, drinks in hand. It's obvious that they knew everything already,
including Steve's startling offer to go on a three-year training plan to
become the next [COO]{.smallcaps}.
Dick approaches me, holding a glass of scotch. "Congratulations, Bill.
I'm looking forward to working closely with you in the years to come."
Shortly, I find myself laughing with a bunch of other people, accepting
their congratulations, and trading stories about the amazing journey
we've been on.
Wes claps me on the shoulder. "Now that you're being promoted," he says,
even more loudly and brashly than normal, "We all thought we should give
you something that celebrates what we've accomplished. Something that
you can take with you that will remind you not to forget about us, you
know, little people."
As he reaches into the box at his feet, he says, "We argued for a long
time about what it should be. But in the end, it was obvious..."
When I see what he pulls out from the box, I burst out laughing.
"Your old craptop!" he exclaims, holding it high in the air. "It was a
shame to make it unusable by bronzing it, but you've got to admit, it's
beautiful, isn't it?"
In disbelief, I gape at it as everyone laughs, clapping and cheering. It
really is my old laptop. Taking it from Wes, I see the broken hinge and
the duct tape I put on to hold the battery in. And now the entire laptop
is covered in what looks like a thick layer of gold-colored paint, and
it's mounted on a Mahogany pedestal.
At the bottom of the pedestal is a bronze label. I read aloud, "In fond
memory of dearly departed Bill Palmer, [VP]{.smallcaps} of
[IT]{.smallcaps} Operations," with the last year in parentheses.
"Holy crap, guys," I say, genuinely touched at their gesture. "You make
it sound like I died!"
Everyone laughs, including Steve. The evening goes by quickly, and I
find myself surprised that I'm having such a good time. I'm not usually
a social person, but tonight, I feel like I'm in the company of friends
and colleagues who I respect, trust, and genuinely like.
Sometime later, Erik arrives. He walks over to me, pausing to scrutinize
the bronzed laptop. "You know, even though I give you a fifty-fifty
chance of washing out, I still believe in you," he says, standing in
front of me, taking a swig of beer. "Congratulations, kid. You deserve
it."
"Thanks," I say, smiling broadly, genuinely touched at his faint praise.
"Yeah, well, don't let me down," he says gruffly. "I've never liked this
town, and you'll be making me fly into that godforsaken airport for
years to come. If you screw this up, it will all be for nothing."
"I'll do my best," I say with a surprising amount of confidence. "Wait a
second. I thought you'd be coming into town anyway for our board
meetings?"
"After what I've seen, I don't want any part of it!" Erik says, laughing
loudly. "I think Parts Unlimited is going to make a lot of money. We'll
see how good your competition really is, but my suspicion is that
they'll have no idea what hit them. For me, this isn't just idle theory.
If all goes according to plan, within a couple of weeks, I'll likely be
one of the largest investors in this company. The last thing I want is a
bunch of insider information that restricts my ability to buy and sell!"
I stare at Erik. He has enough money to become one of our largest
investors but still dresses like a manufacturing line worker? I never
would have guessed that he cared so much about money.
Eventually I ask dumbly, "What do you mean by 'insider information?' "
"I've long believed that to effectively manage [IT]{.smallcaps} is not
only a critical competency but a significant predictor of company
performance," he explains. "One of these days, I'd like to create a
hedge fund that invests in companies, taking long positions on companies
with great [IT]{.smallcaps} organizations that help the business win,
and short the companies where [IT]{.smallcaps} lets everyone down. I
think we' d make a killing. What better way is there to force the next
generation of [CEO]{.smallcaps}s to give a shit about [IT]{.smallcaps}?"
He continues. "I can't do that if I'm tied up as a board director in all
these companies. Bad optics. Too much potential jeopardy with the
[SEC]{.smallcaps}, auditors, and all that."
"Ah," I say.
"Hey, sorry to interrupt," John interjects, "but I wanted to
congratulate you and pay my respects." He then reaches out to shake
Erik's hand, saying, "And to you, as well, sir."
Erik ignores his hand, staring at him up and down for a couple of
moments. Then he laughs and shakes his extended hand. "You've come a
long way, John. Well done. And by the way, I like the new look. Very
Euro discotheque."
"Thanks, Erkel," he says, deadpan. "I couldn't have done it without you.
I'm grateful."
"My pleasure," Erik says jovially. "Just don't hang out with auditors
too much. It's not good for anyone."
John shakes his head agreeably, returning to the party. Erik turns to me
and says conspiratorially, "Now *that* is a rather remarkable
transformation, wouldn't you agree?"
I turn around to look at John. He's laughing and trading insults with
Wes.
"So," Erik says, interrupting my train of thought. "What are your plans
for the rest of the [IT]{.smallcaps} organization? Given this promotion,
you've got some positions to fill."
I turn back to Erik. "You know, I could never have predicted this." Erik
snorts dismissively, which I ignore. "Wes, Patty, and I have talked
about this a lot. I'm sure I'm going to promote Patty to be
[VP]{.smallcaps} of [IT]{.smallcaps} Operations. She's the closest we
have to a plant manager for [IT]{.smallcaps} Operations, and she'll kick
ass," I say with a smile.
"Good choice," he responds. "She certainly doesn't look like your
typical [IT]{.smallcaps} Operations manager, though... And Wes?"
"Believe it or not, Wes made it very clear he doesn't want to be
[VP]{.smallcaps} of [IT]{.smallcaps} Operations," I respond. With less
certainty, I say, "If I'm supposed to vacate my role as
[CIO]{.smallcaps} in two years, I think Wes will have a big decision to
make. If I could wave a magic wand, he'd take over for Patty as head of
[IT]{.smallcaps} Operations, and Patty will be become the next
[CIO]{.smallcaps}. But how am I ever going to get everyone ready if
Steve keeps heaping more responsibilities on me?"
Erik rolls his eyes. "Give me a break. You're bored in your current
role. You're going to become a lot less bored. Fast. And remember that
there are a lot of experienced people around you who've been on similar
journeys, so don't be the idiot that fails because he didn't ask for
help."
He turns to leave but then looks at me with a glint in his eye.
"Speaking of helping other people, I think *you* owe *me* something."
"Of course," I respond sincerely, suddenly wondering if I've been set up
from the very beginning. "Whatever you want, just say the word."
"I need you to help me elevate the state of the practice of how
organizations manage technology. Let's face it. Life in [IT]{.smallcaps}
is pretty shitty when it's so misunderstood and mismanaged. It becomes
thankless and frustrating as people realize that they are powerless to
change the outcome, like an endlessly repeating horror movie. If that's
not damaging to our self-worth as human beings, I don't know what is.
That's got to change," he says passionately. "I want to improve the
lives of one million [IT]{.smallcaps} workers in the next five years. As
someone wise once told me, 'Messiahs are good, but scripture is better.'
"
He says, "I want you to write a book, describing the Three Ways and how
other people can replicate the transformation you've made here at Parts
Unlimited. Call it *The DevOps Cookbook* and show how [IT]{.smallcaps}
can regain the trust of the business and end decades of intertribal
warfare. Can you do that for me?"
Write a book? He can't be serious.
I reply, "I'm not a writer. I've never written a book before. In fact, I
haven't written anything longer than an e-mail in a decade."
Unamused, he says sternly, "Learn."
Shaking my head for a moment, I finally say, "Of course. It would be an
honor and a privilege to write *The DevOps Cookbook* for you while I
embark on what will probably be the most challenging three years of my
entire career."
"Very good. It'll be a great book," he says, smiling. Then he claps me
again on the shoulder. "Go enjoy the evening. You deserve it."
Everywhere I look, I see people who are genuinely having fun and
enjoying each other's company. With my drink in hand, I ponder how far
we've come. During the Phoenix launch, I doubt anyone in this group
could have imagined being part of a super-tribe that was bigger than
just Dev or Ops or Security. There's a term that we're hearing more
lately: something called "DevOps." Maybe everyone attending this party
is a form of DevOps, but I suspect it's something much more than that.
It's Product Management, Development, [IT]{.smallcaps} Operations, and
even Information Security all working together and supporting one
another. Even Steve is a part of this super-tribe.
In that moment, I let myself feel how incredibly proud I am of everyone
in this room. What we've pulled off is remarkable, and even though my
future is probably less certain than anytime in my career, I feel
incredible excitement at the challenges the coming years are going to
bring.
As I take another sip of beer, something catches my eye. A bunch of my
people start to look at their phones. Moments later, on the other side
of the room, one of the developers next to Brent is peering into his
phone, too, with everyone huddled around him.
Old instincts kicking in, I urgently look around the room for Patty who
is making a beeline toward me, her phone already in her hand.
"First off, congratulations, boss," she says, with a half smile on her
face. "You want the bad news or the good news first?"
Turning to her, I say with a sense of calm and inner peace, "What have
we got, Patty?"
[]{#39-acknowledgments.xhtml}
# Acknowledgements {.ch-title}
*First and foremost,* I want to acknowledge all the support from my
loving wife, who put up with far more than I promised, Margueritte, and
my sons, Reid, Parker, and Grant.
I want to thank Todd Sattersten, Tim Grahl, Merridawn Duckler, and Kate
Sage for their incredible help and support throughout the development
process of this book. Also, my profound thanks to the tireless
contributions and scrutiny from Paul Muller from [HP]{.smallcaps}, Paul
Proctor from Gartner, Branden Williams from [RSA]{.smallcaps}, Dr. Tom
Longstaff at Johns Hopkins University, Julia Allen from
[SEI/CMU]{.smallcaps}, Adrian Cockcroft from Netflix, Christopher Little
from [BMC]{.smallcaps}, Bob McCarthy, Lisa Schwartz from
[ITSM]{.smallcaps} Academy, Jennifer Bayuk, Ben Rockwood from Joyent,
Josh Corman from Akamai, James Turnbull from Puppet Labs, Charlie Betz
from Enterprise Management Associates, Dr. Gene Spafford from
[CERIAS]{.smallcaps} at Purdue University, Dwayne Melancon from
Tripwire, and Michael Krigsman from Asuret.
I also want to attribute the contributions of my fellow coauthors of
*The DevOps Cookbook*, Patrick DeBois, John Wills, and Mike Orzen. Among
others, they helped crystallize the practices that became *The Three
Ways* that Erik talked about.
I want to acknowledge John Allspaw, Paul Hammond, and Jez Humble for
their groundbreaking and seminal contributions of showing how fast flow
in the [IT]{.smallcaps} value stream is really done.
And thank you to all the other reviewers who helped shape the
manuscript: David Allen, David Bills, Kip Boyle, Shane Carlson, Carlos
Casanova, Scott Crawford, Iris Culpepper, Mike Dahn, Chris Eng, Paul
Farrall, Daniel Francisco, Kevin Hood, Matt Hooper, Tom Howarth, Kevin
Kenan, Paul Love, Norman Marks, Tom McAndrew, Ally Miller, David
Mortman, Wendy Nather, Michael Nygard, John Pierce, Dennis Ravenelle,
Sasha Romanosky, Susan Ryan, Fred Scholl, Lawrence "Butch" Sheets, Bill
Shinn, Adam Shostack, Ariel Silverstone, Dan Swanson, Joe "Feech"
Telafici, Jan Vromant, and Lenny Zeltser.
The methodology used to create, link, and compute Dick's organizational
[KPI]{.smallcaps}s to [IT]{.smallcaps} activities is based on the
Risk-Adjusted Value Management[TM]{.smallcaps} methodology, developed by
Paul Proctor and Michael Smith at Gartner, Inc.
The tool used to scope the specific audit internal control objectives to
specific [IT]{.smallcaps} controls is called [GAIT]{.smallcaps},
developed by the Institute of Internal Auditors.
And my heartiest thank you to my assistant, Hannah Concannon, who made
it possible for me to focus on writing and finishing the book, as well
as helping me do all the final edits.
I want to also acknowledge Tim Ferriss and the help of the other alumni
of the Kimono group, who helped me understand the theory and practice of
book launches.
Gene Kim
Portland, [OR]{.smallcaps}, June 10, 2012
------------------------------------------------------------------------
*I would like to thank my wife, Erica,* and my daughters, Emily and
Rachel, for their patience and understanding with my chosen profession,
which requires so much travel. Special thanks to my joyfully subversive
serial coconspirators, Gene Kim and George Spafford, for being highly
adaptable and tolerating my loquacious rants.
I have been ridiculously fortunate to work with some of the most
creative and brilliant [CXO]{.smallcaps}s in my practice over the years,
such as Will "Prefontaine" Weider, [CIO]{.smallcaps} of Ministry
Healthcare; Robert Slepin, [CIO]{.smallcaps} of John C. Lincoln Health
Network; Oliver Eckel, [CEO]{.smallcaps} of Cognosec; Rob Leahy,
[CFO]{.smallcaps} of Transdermal Corporation; Jeff Hughes,
[VP]{.smallcaps} of Radiant Systems; Paul O'Neil, [CEO]{.smallcaps} of
Kerzner International; and Nana Palmer, [COO]{.smallcaps} of Kerzner
International---you all have taught me so much about courage in
experimentation and radically improving [IT]{.smallcaps} throughput.
Lastly, I would like to thank my friend and partner in crime for many of
these improvement learnings, John Dennin, Senior Engagement Manager at
Assemblage Pointe, Inc.
Kevin Behr
Lancaster, [PA]{.smallcaps}, June 1, 2012
------------------------------------------------------------------------
*The journey from* *Visible Ops* to *When* [IT]{.smallcaps_italic}
*Fails* further cemented my utmost respect and appreciation for Gene and
Kevin. The challenges and exchanges we've had in the course of writing
this book tested our collective abilities to put in writing what we have
encountered in reality in the [IT]{.smallcaps} industry.
Gentlemen, thank you very much!
Most importantly, thank you for the unwavering love, motivation,
support, and patience of my better half, Rowena. Thank you to my
children, Paolo, Alyssa, and Erika, who all unselfishly put up with my
chaotic and time-consuming schedule, even when on vacation. To my
parents, Carroll and Alpha, thank you for instilling in me a love of
learning. You have been an instrumental part in my continued quest to
keep improving in all aspects of my life.
George Spafford
Saint Joseph, [MI]{.smallcaps}, June 1, 2012
[]{#40-resourceTOC.xhtml}
# *The Phoenix Project* Resource Guide {.ch-title}
[]{#41-resourceIntro.xhtml}
# []{#41-resourceIntro.xhtml__idTextAnchor001}Introduction {.ch-title}
On behalf of my fellow coauthors, thank you so much for reading this
book.
*The Phoenix Project* frames how a core, chronic conflict between
Development and [IT]{.smallcaps} Operations preordains failure for the
entire [IT]{.smallcaps} organization, as well as the organization it
serves. Left unchecked, the conflict increases time to market for
Development, creates longer and more problematic deployments during
feature releases, increases the number of Sev 1 outages, and
[IT]{.smallcaps} Operations becomes increasingly buried with unplanned
work, making it difficult to retire technical debt.
We now know that it is possible to break this conflict between
Development and [IT]{.smallcaps} Operations. The proof is that
high-performing organizations such as Amazon, Google, Twitter, Etsy, and
Netflix are adopting a set of techniques that we now call DevOps, and
they are routinely deploying hundreds or even thousands of production
changes per day, while preserving world-class reliability, stability,
and security. By instituting a set of cultural norms, processes, and
practices, these high performers are achieving breathtaking performance.
They are able to quickly deploy changes into production, with a code
deployment lead time^[1](#48-resourceNotes.xhtml_note-1)^ measured in
minutes or hours, enabling them to innovate and out-experiment their
competition in the marketplace, with higher quality and better customer
outcomes.
[]{#42-resourceWhy.xhtml}
:::: {}
# []{#42-resourceWhy.xhtml__idTextAnchor002}Why Do DevOps? {.ch-title}
The competitive advantage this capability creates is enormous, enabling
faster feature time to market, increased customer satisfaction, market
share, employee productivity, and happiness, as well as allowing
organizations to win in the marketplace. Why? Because technology has
become the dominant value creation process and an increasingly important
(and often the primary) means of customer acquisition within most
organizations.
In contrast, organizations that require weeks or months to deploy
software are at a significant disadvantage in the marketplace.
::: image
[](#48-resourceNotes.xhtml_note-2){#42-resourceWhy.xhtml_note-2}
:::
One of the hallmarks of high-performers in any field is that they always
"accelerate from the rest of the herd." In other words, the best always
get better.
This constant and relentless improvement in performance is happening in
the DevOps space, too. In 2009, ten deploys per day was considered fast.
Now that is considered merely average. In 2012, Amazon went on record
stating that they were doing, on average, 23,000 deploys per day.
## []{#42-resourceWhy.xhtml__idTextAnchor003}Business Value of Adopting DevOps Principles {.resource}
In the 2012 Puppet Labs "State of DevOps
Report",^[3](#48-resourceNotes.xhtml_note-3)^ we were able to benchmark
4,039 [IT]{.smallcaps} organizations, with the goal of better
understanding the health and habits of organizations at all stages of
DevOps adoption.
The first surprise was how much the high-performing organizations using
DevOps practices were outperforming their non-high-performing peers in
agility metrics:
- 30× more frequent code deployments
- 8,000× faster code deployment lead time
And reliability metrics:
- 2× the change success rate
- 12× faster [MTTR]{.smallcaps}
In other words, they were more agile. They were deploying code thirty
times more frequently, and the time required to go from "code committed"
to "successfully running in production" was eight thousand times faster.
High performers had lead times measured in minutes or hours, while lower
performers had lead times measured in weeks, months, or even quarters.
Not only were the organizations doing more work, but they had far better
outcomes: when the high performers deployed changes and code, they were
twice as likely to be completed successfully (i.e., without causing a
production outage or service impairment), and when the change failed and
resulted in an incident, the time required to resolve the incident was
twelve times faster.
This study was especially exciting because it showed empirically that
the core, chronic conflict can be broken: high performers are deploying
features more quickly, while providing world-class levels of
reliability, stability, and security, enabling them to out-experiment
their competitors in the marketplace. An even more astonishing fact:
delivering these high levels of reliability actually *requires* that
changes be made frequently!
In the 2014 study,^[4](#48-resourceNotes.xhtml_note-4)^ we also found
that not only did these high performers have better [IT]{.smallcaps}
performance, they had significantly better organizational performance as
well: they were two times more likely to exceed profitability, market
share, and productivity goals, and there are hints that they have
significantly better performance in the capital markets, as well (as
Erik predicted in the last chapter, when he wanted to create the hedge
fund).
## []{#42-resourceWhy.xhtml__idTextAnchor004}What It Feels Like to Live in A DevOps World {.resource}
Imagine living in a DevOps world, where product owners, Development,
[QA]{.smallcaps}, [IT]{.smallcaps} Operations, and InfoSec work together
relentlessly to help each other and the overall organization win. They
are enabling fast flow of planned work into production (e.g., performing
tens, hundreds, or even thousands of code deploys per day), while
preserving world-class stability, reliability, availability, and
security.
Instead of the upstream Development groups causing chaos for those in
the downstream work centers (e.g., [QA]{.smallcaps}, [IT]{.smallcaps}
Operations, and InfoSec), Development is spending twenty percent of its
time helping ensure that work flows smoothly through the entire value
stream, speeding up automated tests, improving deployment
infrastructure, and ensuring that all applications create useful
production telemetry.
Why? Because everyone needs fast feedback loops to prevent problematic
code from going into production and to enable code to quickly be
deployed into production, so that any production problems are quickly
detected and corrected.
Everyone in the value stream shares a culture that not only values each
other's time and contributions but also relentlessly injects pressure
into the system of work to enable organizational learning and
improvement. Everyone dedicates time to putting those lessons into
practice and paying down technical debt. Everyone values nonfunctional
requirements (e.g., quality, scalability, manageability, security,
operability) as much as features. Why? Because nonfunctional
requirements are just as important in achieving business objectives,
too.
We have a high-trust, collaborative culture, where everyone is
responsible for the quality of their work. Instead of approval and
compliance processes, the hallmark of a low-trust, command-and-control
management culture, we rely on peer review to ensure that everyone has
confidence in the quality of their code.
Furthermore, there is a hypothesis-driven culture, requiring everyone to
be a scientist, taking no assumptions for granted and doing nothing
without measuring. Why? Because we know that our time is valuable. We
don't spend years building features that our customers don't actually
want, deploying code that doesn't work, or fixing something that isn't
actually the problem. All these factors contribute to our ability to
release exciting features to the marketplace that delight our customers
and help our organization win.
Paradoxically, performing code deployments becomes boring and routine.
Instead of being performed only at night or on weekends, full of stress
and chaos, we are deploying code throughout the business day, without
most people even noticing. And because code deployments happen in the
middle of the afternoon instead of on weekends, for the first time in
decades, [IT]{.smallcaps} Operations is working during normal business
hours, like everyone else.
Just how did code deployment become routine? Because developers are
constantly getting fast feedback on their work: when they write code,
automated unit, acceptance, and integration tests are constantly being
run in production-like environments, giving us continual assurance that
the code and environment will operate as designed, and that we are
always in a deployable state. And when the code is deployed, pervasive
production metrics demonstrate to everyone that it is working, and the
customer is getting value.
Even our highest-stakes feature releases have become routine. How?
Because at product launch time, the code delivering the new
functionality is already in production. Months prior to the launch,
Development has been deploying code into production, invisible to the
customer, but enabling the feature to be run and tested by internal
staff.
At the culminating moment when the feature goes live, no new code is
pushed into production. Instead, we merely change a feature toggle or
configuration setting. The new feature is slowly made visible to small
segments of customers, automatically rolled back if something goes
wrong.
Only when we have confidence that the feature is working as designed do
we expose it to the next segment of customers, rolled out in a manner
that is controlled, predictable, reversible, and low stress. We repeat
until everyone is using the feature.
By doing this, we not only significantly reduce deployment risk, but we
increase the likelihood of achieving the desired business outcomes, as
well. Because we can do deployments quickly, we can do experiments in
production, testing our business hypotheses for every feature we build.
We can iteratively test and refine our features in production, using
feedback from our customers for months, and maybe even years.
It is no wonder that we are out-experimenting our competition and
winning in the marketplace.
All this is made possible by DevOps, a new way that Development, Test,
and [IT]{.smallcaps} Operations work together, along with everyone else
in the [IT]{.smallcaps} value stream.
## []{#42-resourceWhy.xhtml__idTextAnchor005}DevOps Is the Manufacturing Revolution of Our Age {.resource}
The principles behind DevOps work patterns are the same principles that
transformed manufacturing. Instead of optimizing how raw materials are
transformed into finished goods in a manufacturing plant, DevOps shows
how we optimize the [IT]{.smallcaps} value stream, converting business
needs into capabilities and services that provide value for our
customers.
During the 1980s, there was a very well-known core, chronic conflict in
manufacturing:
- Protect sales commitments
- Control manufacturing costs
In order to protect sales commitments, the product sales force wanted
lots of inventory on hand, so that customers could always get products
when they wanted it. However, in order to reduce costs, plant managers
wanted to reduce inventory levels and work in process
([WIP]{.smallcaps}).
Because one can't simultaneously increase and decrease the inventory
levels at the plant, sales managers and plant managers were locked in a
chronic conflict.
They were able to break the conflict by adopting Lean principles, such
as reducing batch sizes, reducing work in process, and shortening and
amplifying feedback loops. This resulted in dramatic increases in plant
productivity, product quality, and customer
satisfaction.^[5](#48-resourceNotes.xhtml_note-5)^
In the 1980s, average order lead
times^[6](#48-resourceNotes.xhtml_note-6)^ were six weeks, with less
than seventy percent of orders being shipped on time. By 2005, average
product lead times had dropped to less than three weeks, with more than
ninety-five percent of orders being shipped on time. Organizations that
were not able to replicate these performance breakthroughs lost market
share, if not went out of business
entirely.^[7](#48-resourceNotes.xhtml_note-7)^
::::
[]{#43-resourceWhere.xhtml}
# []{#43-resourceWhere.xhtml__idTextAnchor006}Where DevOps Came From {.ch-title}
One hundred years from now, historians will look back at this decade and
conclude that something transformative happened: how we worked inside
Development and [IT]{.smallcaps} Operations changed completely.... I
predict that historians will call this decade the "Cambrian explosion
for [IT]{.ed_epigraph_smallcaps}," a time of incredible innovation and
disruption when, 50 years after the birth of computing, we finally
learned what technology was good for.
---John Willis, Cohost of "DevOps Cafe" podcast
The term "devops" was originally coined by Patrick Debois and Andrew
Shafer in 2008,^[8](#48-resourceNotes.xhtml_note-8)^ and it entered
common usage in 2009 in the Velocity Conference community with the
famous "10+ Deploys Per Day: Dev and Ops Cooperation at Flickr"
presentation, given by John Allspaw and Paul
Hammond.^[9](#48-resourceNotes.xhtml_note-9)^
In this book, we refer to "DevOps" as the outcome of applying Lean
principles to the [IT]{.smallcaps} value stream. These principles are
based on more than a century of sound management practices. However,
instead of being applied to the transformation of physical goods, we are
using these principles to accelerate flow of work through Product
Management, Development, Test, [IT]{.smallcaps} Operations, and InfoSec.
DevOps has benefitted tremendously from the work the Agile Community has
done, showing how small teams operating with high trust combined with
small batch sizes and smaller, more frequent software releases can
dramatically increase productivity of Development organizations. In
fact, many of the key moments in the DevOps history happened at Agile
conferences, in addition to the incredibly vibrant DevOpsDays events
happening around the world since the first one was held in 2009.
And of course, DevOps extends and builds upon the practices of
"infrastructure as code" pioneered by Dr. Mark Burgess, as well as
continuous integration and continuous deployment (pioneered by Jez
Humble and David Farley), which is a prerequisite to achieving fast
deployment flow.
DevOps also benefits from an astounding convergence of philosophical
management movements, such as Lean Startup, Innovation Culture, Toyota
Kata, Rugged Computing, and the Velocity community. All of these
mutually reinforce each other, creating the conditions of a powerful
coalition of forces that can accelerate DevOps adoption.
[]{#44-resourceThree.xhtml}
::::: {}
# []{#44-resourceThree.xhtml__idTextAnchor007}The Three Ways Explained {.ch-title}
In *The Phoenix Project*, we describe the underpinning principles that
all the DevOps patterns can be derived from as "The Three Ways." It is
intended to describe the values and philosophies that guide DevOps
processes and practices.
::: block
**The First Way** is about the left-to-right flow of work from
Development to [IT]{.smallcaps} Operations to the customer. In order to
maximize flow, we need small batch sizes and intervals of work, never
passing defects to downstream work centers, and to constantly optimize
for the global goals (as opposed to local goals such as Dev feature
completion rates, Test find/fix ratios, or Ops availability measures).
The necessary practices include continuous build, integration, and
deployment, creating environments on demand, limiting work in process,
and building safe systems and organizations that are safe to change.
:::
::: block
**The Second Way** is about the constant flow of fast feedback from
right-to-left at all stages of the value stream, amplifying it to ensure
that we can prevent problems from happening again or enable faster
detection and recovery. By doing this, we create quality at the source,
creating or embedding knowledge where we need it.
The necessary practices include "stopping the production line" when our
builds and tests fail in the deployment pipeline; constantly elevating
the improvement of daily work over daily work; creating fast automated
test suites to ensure that code is always in a potentially deployable
state; creating shared goals and shared pain between Development and
[IT]{.smallcaps} Operations; and creating pervasive production telemetry
so that everyone can see whether code and environments are operating as
designed and that customer goals are being met.
:::
**The Third Way** is about creating a culture that fosters two things:
continual experimentation, which requires taking risks and learning from
success and failure, and understanding that repetition and practice is
the prerequisite to mastery.
Experimentation and risk taking are what enable us to relentlessly
improve our system of work, which often requires us to do things very
differently than how we've done it for decades. And when things go
wrong, our constant repetition and daily practice is what allows us to
have the skills and habits that enable us to retreat back to a place of
safety and resume normal operations.
The necessary practices include creating a culture of innovation and
risk taking (as opposed to fear or mindless order taking) and high trust
(as opposed to low trust, command-and-control), allocating at least
twenty percent of Development and [IT]{.smallcaps} Operations cycles
towards nonfunctional requirements, and constant reinforcement that
improvements are encouraged and celebrated.
:::::
[]{#45-resourceTop.xhtml}
# Top DevOps Myths {.ch-title}
Just as with any transformational and disruptive movement, DevOps can be
misunderstood or mischaracterized. Here are some of the top DevOps
myths:
### DevOps replaces Agile {.resource}
DevOps is absolutely compatible with Agile. In fact, DevOps is the
logical continuation of the Agile journey that was started in 2001,
because we now know that the real definition of "done" is not when
Development is done coding. Instead, code is only "done" when it has
been fully tested and is operating in production as designed. (Note that
Agile is not a prerequisite for adopting DevOps.)
### DevOps replaces ITIL {.resource}
Although some may view DevOps as backlash to [ITIL]{.smallcaps} (the
[IT]{.smallcaps} Infrastructure Library) or [ITSM]{.smallcaps}
([IT]{.smallcaps} Service Management), DevOps and [ITIL]{.smallcaps} are
compatible, too. [ITIL]{.smallcaps} and [ITSM]{.smallcaps} remain the
best codifications of the processes that underpin [IT]{.smallcaps}
Operations, and actually describe many of the capabilities needed in
order for [IT]{.smallcaps} Operations to support a DevOps-style work
stream.
In order to accommodate the faster lead times and higher deployment
frequencies associated with DevOps, many areas of the [ITIL]{.smallcaps}
processes require automation, specifically around the change,
configuration, and release processes.
Because we also require fast detection and recovery when service
incidents occur, the [ITIL]{.smallcaps} disciplines of service design
and incident and problem management remain as relevant as ever.
### []{#45-resourceTop.xhtml__idTextAnchor009}DevOps means NoOps {.resource}
DevOps is sometimes incorrectly interpreted to be NoOps (i.e.,
[IT]{.smallcaps} Operations is entirely eliminated). However, more
precisely, DevOps will often put more responsibility on Development to
do code deployments and maintain service levels. This merely means that
Development is taking over many of the [IT]{.smallcaps} Operations and
operations engineering functions.
In order to support fast lead times and enable developer productivity,
DevOps does require many [IT]{.smallcaps} Operations tasks to become
self-service. In other words, instead of Development opening up a work
ticket and waiting for [IT]{.smallcaps} Operations to complete the work,
many of these activities will be automated so that developers can do it
themselves (e.g., get a production-like Dev environment, add a feature
metric for production telemetry).
### DevOps is only for open source software {.resource}
Although many of the DevOps success stories take place in organizations
using software such as the [LAMP]{.smallcaps}
stack,^[10](#48-resourceNotes.xhtml_note-10)^ organizations are
implementing DevOps patterns using Microsoft .[NET]{.smallcaps},
[SAP]{.smallcaps}, and even [COBOL]{.smallcaps} applications running on
mainframes and [HP]{.smallcaps} LaserJet firmware.
DevOps principles are universal, and they are largely independent of the
underlying technology being used. Some of the DevOps patterns have
specific technology requirements (e.g., able to support automated
testing, able to expose configurations that can be checked into version
control), which are often more prevalent in open source software.
### DevOps is just "infrastructure as code" or automation {.resource}
While many of the DevOps patterns shown in this book require automation,
DevOps also requires shared goals and shared pain throughout the
[IT]{.smallcaps} value stream. This goes far beyond just automation.
### DevOps is only for startups and unicorns {.resource}
DevOps is applicable and relevant to any organization that must increase
flow of planned work through Development, while maintaining quality,
reliability, and security for the customer.
In fact, we claim that DevOps is even *more* important for the horses
than for the unicorns. After all, as Richard Foster states, "Of the
Fortune 500 companies in 1955, 87% are gone. In 1958, the Fortune 500
tenure was 61 years; now it's only 18
years."^[11](#48-resourceNotes.xhtml_note-11)^ We know that the downward
spiral happens to every [IT]{.smallcaps} organization. However, most
enterprise [IT]{.smallcaps} organizations will come up with countless
reasons why they cannot adopt DevOps, or why it is not relevant for
them.
One of the primary objections from horses is that all the unicorns
(e.g., Google, Amazon, Twitter, Etsy) were born that way. In other
words, unicorns were born doing DevOps.
In actuality, virtually every DevOps unicorn was once a horse and had
all the problems associated with being a horse.
- Amazon, up until 2001, ran on the [OBIDOS]{.smallcaps} content
delivery system, which became so problematic and dangerous to maintain
that Werner Vogels, Amazon [CTO]{.smallcaps}, transformed their entire
organization and code to a service-oriented
architecture.^[12](#48-resourceNotes.xhtml_note-12)^
- Twitter struggled to scale capacity on their front-end monolithic Ruby
on Rails system in 2009, starting a multiyear project to progressively
re-architect and replace it.^[13](#48-resourceNotes.xhtml_note-13)^
- LinkedIn, six months after their successful [IPO]{.smallcaps} in 2011,
struggled with problematic deployments so painful that they launched
Operation InVersion, a two-month feature freeze, allowing them to
overhaul their compute environments, deployments, and
architecture.^[14](#48-resourceNotes.xhtml_note-14)^
- Etsy, in 2009, according to Michael Rembetsy, "had to come to grips
that they were living in a sea of their own engineering filth,"
dealing with problematic software deployments and technical debt. They
committed themselves to a cultural
transformation.^[15](#48-resourceNotes.xhtml_note-15)^
- Facebook, in 2009, was at the breaking point for infrastructure
operations, barely able to keep up with user growth, code deployments
were becoming increasingly dangerous, and staff were continually
firefighting. Jay Parikh and Pedro Canahuati started their
transformation to make code safe to deploy
again.^[16](#48-resourceNotes.xhtml_note-16)^
Simply put, all unicorns were once horses. DevOps is how any horse can
became a unicorn, if they want to become one. And in fact, the list of
enterprises adopting DevOps continues to grow:
- Financial services: [BNY]{.smallcaps} Mellon, Bank of America, World
Bank, Paychex, Nationwide Insurance
- Retailers: The Gap, Nordstrom, [REI]{.smallcaps}, Macy's, GameStop,
Nordstrom, Target
- Higher education: Seton Hill University, Kansas State University,
University of British Columbia
- Government agencies: [UK]{.smallcaps}.gov, Department of Homeland
Security
Christopher Little states, "If there's anything that all horses
\[enterprise [IT]{.smallcaps} organizations\] hate, it's hearing stories
about unicorns \[DevOps shops\]. Which is strange, because horses and
unicorns are probably the same species. Unicorns are just horses with
horns."
[]{#46-resourceFour.xhtml}
# []{#46-resourceFour.xhtml__idTextAnchor010}The Four Types of Work {.ch-title}
Because work can be assigned to people in more ways than ever (e.g., via
e-mails, phone calls, hallway conversations, text messages, ticketing
systems, meetings, and so forth), we want to make visible our existing
commitments.
Erik convinces Bill that there are four types of work that
[IT]{.smallcaps} does:
### Business projects {.resource}
These are business initiatives, of which most Development projects
encompass. These typically reside in the Project Management Office,
which tracks all the official projects in an organization.
### Internal IT projects {.resource}
These include the infrastructure or [IT]{.smallcaps} Operations projects
that business projects may create, as well as internally generated
improvement projects (e.g., create new environment, automate
deployment). Often these are not centrally tracked anywhere, instead
residing with the budget owners (e.g., database manager, storage
manager, distributed systems manager)
This creates a problem when [IT]{.smallcaps} Operations is a bottleneck,
because there is no easy way to find out how much of capacity is already
committed to internal projects.
### Changes {.resource}
These are often generated from the previous two types of work and are
typically tracked in a ticketing system (e.g., Remedy for
[IT]{.smallcaps} Operations, [JIRA]{.smallcaps}, or an Agile planning
tool for Development). The fact that two systems exist to track work for
two different parts of the value stream can create problems, especially
when handoffs are required.
Incidentally, in some dedicated teams that own both the feature
development and service delivery responsibilities, all work lives in the
same system. This has some advantages, because operational incidents
will show up in the backlog and "in work," alongside feature defects and
new feature functionality.
### Unplanned work or recovery work {.resource}
These include operational incidents and problems, often caused by the
previous types of work and always come at the expense of other planned
work commitments.
## Why Do We Need To Visualize IT Work And Control WIP? {.resource}
My favorite (and only) graph in *The Phoenix Project* shows wait time as
a function of how busy a resource at a work center is. Erik used this to
show why Brent's simple thirty-minute changes were taking weeks to get
completed. The reason, of course, is that as the bottleneck of all work,
Brent is constantly at or above one hundred percent utilization, and
therefore, anytime we required work from him, the work just languished
in queue, never worked on without expediting or escalating.
::: image
{#table-img-div}
:::
Here's what the graph shows: on the x-axis is the percent busy for a
given resource at a work center, and on the y-axis is the approximate
wait time (or maybe more precisely stated, the queue length). What the
shape of the line shows is that, as resource utilization goes past
eighty percent, wait time goes through the roof.
In *The Phoenix Project*, here's how Bill and the team realized the
devastating consequences of this property on lead times for the
commitments they were making to the project management office:
::: blockquote
I tell them what Erik told me at MRP-8, about how wait times depend upon
resource utilization. "The wait time is the 'percentage of time busy'
divided by the 'percentage of time idle.' In other words, if a resource
is fifty percent busy, then it's fifty percent idle. The wait time is
fifty percent divided by fifty percent, so one unit of time. Let's call
it one hour.
So, on average, our task would wait in the queue for one hour before it
gets worked.
"On the other hand, if a resource is ninety percent busy, the wait time
is 'ninety percent divided by ten percent', or nine hours. In other
words, our task would wait in queue nine times longer than if the
resource were fifty percent idle."
I conclude, "So, for the Phoenix task, assuming we have seven handoffs,
and that each of those resources is busy ninety percent of the time, the
tasks would spend in queue a total of nine hours times the seven
steps..."
"What? Sixty-three hours, just in queue time?" Wes says, incredulously.
"That's impossible!"
:::
Bill and team realize that their simple thirty-minute task actually
required seven handoffs (e.g., server team, networking team, database
team, virtualization team, and, of course, Brent, Brent, Brent).
Assuming that all work centers were ninety percent busy, the graph shows
us that the average wait time at each work center is nine hours---and
because the work had to go through seven work centers, the total wait
time is seven times that: sixty-three hours.
In other words, the total "% of value added time" (sometimes known as
"touch time") was only 0.16% of the total lead time (thirty minutes
divided by sixty-three hours). That means for 99.8% of our total lead
time, the work was simply sitting in queue, waiting to be worked on
(e.g., in a ticketing system, in an e-mail).
My fellow coauthor, George Spafford, and I were first introduced to this
graph that so brilliantly shows the destructive nature of long queue
times caused by high resource utilization when we both took the
[EM]{.smallcaps} 526 Constraints Management course at Washington State
University from Dr. James Holt (described in more detail in the Further
Reading section).
Unfortunately, I don't know the precise derivation of this graph. Some
believe, like I do, that this graph is a simplified case of Little's
Law, where we assume a single work center, a uniform work queue (i.e.,
all tasks require the same time to complete), no delay between jobs,
etc.
In the graph, I believe "wait time" is actually a proxy for "queue
length." In other words, because it's not time elapsed, it has no time
units (i.e., it's neither minutes, hours, days).
The best discussion on the derivation (and validity/invalidity) can be
found on *The Phoenix Project* LinkedIn
group.^[17](#48-resourceNotes.xhtml_note-17)^ The discussion, although
sometimes a bit acerbic, is intellectually top-notch.
My opinion? The goal of science is to explain the largest amount of
observed phenomenon with the fewest number of principles, and to reveal
surprising insights. I think the graph serves that purpose, and it is
the most effective way of communicating the catastrophic consequences of
overloaded [IT]{.smallcaps} workers and the fallacies of using typical
project management techniques for [IT]{.smallcaps} Operations.
[]{#47-resourceReading.xhtml}
:::: {}
# Further Reading[]{#47-resourceReading.xhtml__idTextAnchor012} {.ch-title}
One of the most requested items has been a list of recommended reading
and further resources to learn more about the philosophies, tools, and
techniques that were used in the book. I consulted many sources for the
actual planning and construction of the novel. I was trained as a Theory
of Constraints Jonah, a kanban practitioner, and an acolyte in the
Toyota Kata; I wove Visible Ops into the book. Here I've provided a list
of these resources plus other guides to replicate the transformation
that Bill pulled off with Erik's help at Parts Unlimited.
## *The Goal: A Process of Ongoing Improvement* {.resource}
Dr. Eliyahu Goldratt wrote his seminal book, *The Goal: A Process of
Ongoing Improvement*, in 1984. It's a Socratic novel about Alex Rogo, a
plant manager who must fix his cost and due date issues in ninety days,
or his plant will be shut down. This book has been incorporated into
many [MBA]{.smallcaps} curriculums, influenced multiple generations of
business leaders, and sold over six million copies to date.
My coauthors and I studied this book for nearly a decade, getting ready
to write *The Phoenix Project*. In many ways, I view our book as an
homage to *The Goal*. We attempted to mirror most of the book structure
and plot elements, while making it contemporary, relevant, and, I hope,
more dramatic. (I'd like to think that *The Phoenix Project* is what Dr.
Goldratt would have written if he wrote *The Goal* today, and had
Tarantino or Scorsese as a novel coach.)
In *The Goal*, Dr. Goldratt starts to describe the steps in the Theory
of Constraints ([TOC]{.smallcaps}) methodology. Briefly, the five
original [TOC]{.smallcaps} steps are:
- Identify the constraint
- Exploit the constraint
- Subordinate all other activities to the constraint
- Elevate the constraint to new levels
- Find the next constraint
In *The Goal*, the constraints were initially the famous
[NCX]{.smallcaps}-10 robot, then the heat treat ovens, and then the
constraint becomes market demand. In *The Phoenix Project*, the
constraint was initially Brent because he was always dealing with
unplanned work, then the application deployment process, and then the
constraint moved outside the organization because the needed
[MRP]{.smallcaps} application support was outsourced.
In Dr. Goldratt's following book, *It's Not Luck*, he describes what he
called the Thinking Processes, which is a fantastic (but somewhat
inaccessible and often very slow) methodology of identifying core,
chronic conflicts, capturing the current reality, describing the desired
future reality, and various planning techniques to increase the
likelihood of getting there successfully.
By far, the very best overview of the entire [TOC]{.smallcaps}, the
Thinking Processes, and Dr. Goldratt's body of knowledge is an audiobook
called *Beyond The Goal*. It includes all of his recorded lectures from
2005 and is a breathtaking tour of Dr. Goldratt's life journey,
describing his contributions, tools, and case studies.
Eight years ago, it was well known that the Thinking Processes were the
tools and techniques he used to construct *The Goal*. That's why my
coauthors and I tried to learn more about it, but we couldn't find any
training or books, beyond Dr. Goldratt's writings, that were feasible
for us to attend or buy. Nor were there any nontrivial (or correct)
examples that we could find by scouring the Internet. Much has changed
since then.
For anyone interested in becoming an expert in [TOC]{.smallcaps} and the
Thinking Processes, I wholehearted recommend Dr. James Holt's
[EM]{.smallcaps} 526 Constraints Management and [EM]{.smallcaps} 530
Applications of Constraints Management courses, offered online through
Washington State University. They both prepare students to become
trained as "a Jonah," the Yoda-like character in *The Goal* who was
obviously the embodiment of Dr.
Goldratt.^[18](#48-resourceNotes.xhtml_note-18)^
If you want to learn more about the Thinking Processes, I'd recommend
Dr. H. William Dettmer's textbook, *The Logical Thinking Process*,
although it is not light reading. And many shortcuts have been developed
that are not reflected in Dr. Dettmer's book, so danger lies in this
path.
## *The Five Dysfunctions of A Team: A Leadership Fable* {.resource}
The technique that Steve, the Parts Unlimited [CEO]{.smallcaps}, uses in
part 2, chapter 18 is modeled after Patrick Lencioni's methodology
described in *The Five Dysfunctions of a Team: A Leadership Fable*. He
posits that one of the core contributors to a team's inability to
achieve goals is due to lack of trust. In his model, the five
dysfunctions are described as:
- Absence of trust---unwilling to be vulnerable within the group
- Fear of conflict---seeking artificial harmony over constructive
passionate debate
- Lack of commitment---feigning buy-in for group decisions creates
ambiguity throughout the organization
- Avoidance of accountability---ducking the responsibility to call peers
on counterproductive behavior, which sets low standards
- Inattention to results---focusing on personal success, status, and ego
before team success
When I think about the long, bitter intertribal warfare that has existed
between Development and [IT]{.smallcaps} Operations, as well as between
[IT]{.smallcaps} and "the business," I suspect that we will very much
need the lessons of Mr. Lencioni to achieve the DevOps ideal.
Often, the first step in using Mr. Lencioni's methodology is for leaders
to enable themselves to become vulnerable (or at the very least, start
by modeling vulnerable
behaviors).^[19](#48-resourceNotes.xhtml_note-19)^ In *The Phoenix
Project*, Steve has already internalized these practices for decades and
leads what is called a personal history
exercise.^[20](#48-resourceNotes.xhtml_note-20)^
I was fortunate enough to have personally observed and benefited from
his techniques being used. When my old boss, Jim B. Johnson, used this
technique when he first joined as [CEO]{.smallcaps} of Tripwire, Inc.,
frankly, it blew my mind. He shared his own story, which was so personal
and touching it left the rest of us on the executive team emotionally
raw, with tears in (almost) everyone's eyes.
In turn, we all had to share some elements of our own stories, showing
vulnerability to each other and enabling the next step, which is to stop
fearing conflict. Jim set the tone of the honesty and candor he demanded
from everyone, and, trust me, it changed how we behaved and executed,
and we started acting more like a team.
This was probably one of the most important lessons in my life. It is
now my aspiration in every domain of my life to never fear conflict,
never be afraid to tell the truth, and never be afraid to say what I
really think. Of course, I'd be delusional to think I can fully achieve
this, but I think it's still a worthy goal.
I've been in situations where I've observed leadership teams locked in
chronic underperformance and strife, because of the utter inability for
the team members to trust each other. And when leaders don't trust each
other, then almost certainly, their respective teams won't trust each
other.
From my professional experience, the cost and true consequence of not
being able to have candid discussions about problems that everyone knows
about, but is unwilling to confront, is incredibly high. Tackling this
problem requires overcoming some of our most ingrained and learned
behaviors, but the rewards are worth it.
## *Toyota Kata: Managing People for Improvement, Adaptiveness and Superior Results* {.resource}
Another one of the books that deeply influenced us is *Toyota Kata:
Managing People for Improvement, Adaptiveness and Superior Results* by
Shingo Prize winner Mike Rother.^[21](#48-resourceNotes.xhtml_note-21)^
I've had the pleasure of meeting him, as well as taking his three-day
course, "Improvement Kata and Coaching Kata," offered through University
of Michigan. It includes two days of fieldwork in a real manufacturing
plant.
If I could take the liberty of describing Mr. Rother's journey in my own
words, it began over twenty years ago as he was visiting Toyota plants
with a team of researchers and American car manufacturing executives. He
describes that stage of his journey as capturing and codifying the
observed Toyota practices that led to their extraordinary and
market-leading performance.
However, when he looks back at that phase of his career, he'll
characterize it as merely teaching people how to mimic the behaviors
observed at the Toyota plants, but missing the most important parts of
the Toyota culture and values that framed their management practices.
Listening to him talk about this, it's as if he was calling a
significant portion of the Lean Community that he helped train merely a
"cargo cult."^[22](#48-resourceNotes.xhtml_note-22)^
Mr. Rother's lessons have been codified in the book *Toyota Kata*, which
frames the thought process and culture that must exist to enable the
Lean [PDCA]{.smallcaps} cycle (Plan, Do, Check, Act). I believe that
this is one of the most extraordinary contributions to the world of
process improvement.
::: image

:::
The most obvious manifestation of the Toyota Kata is the two-week
improvement cycle, in which every work center supervisor must improve
something (anything!) every two weeks. To quote Mr. Rother, "The
practice of kata is the act of practicing a pattern so it becomes second
nature. In its day-to-day management, Toyota teaches a way of
working---a kata---that has helped make it so successful over the last
six decades."
The notion of the need for daily repetition in order to create habits,
in order to change the outcomes, is now well established in the domains
of sports training, learning to play a musical instrument, military
Special Forces training, and now in modern manufacturing. This forms the
basis of Erik's Third Way. He explains, "It's about how to create a
culture that simultaneously fosters experimentation, learning from
failure, and understanding that repetition and practice are the
prerequisites to mastery."
In my mind, Patty's [ITIL]{.smallcaps}/[ITSM]{.smallcaps} crusade is
very much like the Lean practitioners that Mr. Rother describes who were
never able to replicate the performance of Toyota. Why? They'd do a Lean
Kaizen event once per year, but then get marginalized from daily
operations the remainder of the year.
For us to get the performance gains promised by
[ITIL]{.smallcaps}/[ITSM]{.smallcaps}, Lean, or whatever, we must create
a culture of relentless improvement described by Mr. Rother.
Kata impacts your organization by
- providing a systematic, scientific routine that can be applied to any
problem or challenge,
- commonizing how the members of an organization develop solutions,
- migrating managers toward a role of coach and mentor, by having them
practice coaching cycles, and
- framing [PDCA]{.smallcaps} in a way that has people taking small steps
every day.
These two-week improvement cycles put constant pressure into the system,
forcing it to improve. Mr. Rother asserts that if a system is not
improving, the result is not a steady state. Instead, because of
entropy, organizational performance declines.
In one of the most startling case studies, Mr. Rother describes
observing how a certain work center that was able to decrease the number
of workers from six to four. Over the next six weeks, however, the
number of workers gradually grew back to six. Entropy.
Patterns like those in the Netflix culture, such as relentless
improvement and innovation, ruthless eradication of variance, and
injecting faults into the production environment (embodied in tools such
as the famous Chaos Monkey), are the perfect embodiment of the
Improvement Kata that Mr. Rother describes.
## *Continuous Delivery: Reliable Software Releases through Build, Test, and Deployment Automation* {.resource}
Erik's First Way underscores the importance of the performance of the
entire system, as opposed to the performance of a specific silo of work
or department---this as can be as large a division (e.g., Development or
[IT]{.smallcaps} Operations) or as small as an individual contributor
(e.g., a developer, a system administrator).
In the [IT]{.smallcaps} value stream, this is all about the
left-to-right flow of work from Development into [IT]{.smallcaps}
Operations. Probably the best embodiment of this work is Jez Humble and
David Farley's seminal book *Continuous Delivery: Reliable Software
Releases through Build, Test, and Deployment Automation*.
They codify many of the techniques required to replicate the famous 2009
Velocity Conference presentation, "10+ Deploys Per Day: Dev and Ops
Cooperation at Flickr," given by John Allspaw and Paul Hammond, as well
as the Agile system administration
movement.^[23](#48-resourceNotes.xhtml_note-23)^
Continuous delivery is the extension of continuous integration, which
are the Development practices that include continuous builds, continuous
testing, daily integration of branches back into trunk, testing in a
clone of the production environment, etc. Continuous delivery techniques
extend these processes all the way into the production environment.
(When I read this book, I almost doubled over in agony, realizing how
much pain and how many poor decisions I could have averted if I had read
this book four years prior. I was associated with an unnamed software
company where we had a broken build system for over a year. Without
automated builds, you can't have automated testing, and without
automated testing, you're doomed to painful integration of developer
branches, which leads to a downward spiral of less frequent and far more
painful integrations, which slows down feature delivery and reduces
software quality.)
Imagine my delight when Jez Humble told me that the value stream map
exercise that Bill and team went through in chapter 31 of the
Development to [IT]{.smallcaps} Operations production deployment process
was almost precisely what he and Farley did in their book. Awesome.
Continuous delivery is the perfect embodiment of the First, Second, and
Third Ways, as it emphasizes small batch sizes (e.g., check into trunk
daily), stopping the line when problems occur (e.g., no new work allowed
when builds, tests, or deployments fail; elevating the integrity of the
system of work over the work itself), and the need to continually build
the validation tests necessary to either prevent failures in production,
or, at the very least, detect and correct them quickly (e.g., the
transition from manual process reviews to automated tests, especially in
the [ITSM]{.smallcaps} release, change, and configuration process
areas).
Continuous deployment is a prerequisite for the high deploy rates
characterized by DevOps, and is therefore a needed skill set for the
modern DevOps practitioner. It will also be the salvation for a
generation of [ITSM]{.smallcaps} practitioners. Read it.
## *Release It!: Design and Deploy Production-Ready Software* {.resource}
When you watch talks at the Velocity Conference about how organizations
like Google, Netflix, Amazon, Twitter, Pinterest, and others are
engineering code and environments to operate at scale, you're often
hearing many of the ideas that were first promulgated by Michael T.
Nygard in his fantastic book, *Release It!: Design and Deploy
Production-Ready Software*.^[24](#48-resourceNotes.xhtml_note-24)^
This is a book that helps span the Development and [IT]{.smallcaps}
Operations divide, by showing developers and architects how to build
applications that can be deployed and managed and survive in even the
most hostile production environments. When you read this book, you'll
see in his patterns and lessons horror stories from your own past.
[IT]{.smallcaps} Operations practitioners need to read this book, too,
in order to connect the dots of how specific Development decisions lead
to bad production outcomes that they've experienced in the past. And
more importantly, it will enable them to go to architecture or
development meetings with concrete suggestions on how to avoid them in
the future.
When Chris and his team deploy Project Unicorn that performs so well in
production in *The Phoenix Project*, they obviously read Mr. Nygard's
book.
A little story: I saw Mr. Nygard give an Ignite presentation at the 2010
DevOpsDays in Mountain View, and it was one of the most amazing talks
I've ever seen. It was one of the most high-fidelity and intense
descriptions of a disastrous application deployment that took weeks to
recover from, requiring heroics from [IT]{.smallcaps} Operations. It
still remains my genuine hope that the scenes of the Phoenix deployment
failure are as disturbing as my experience watching Mr. Nygard's
presentation.
## Visible Ops and ITIL Service Support {.resource}
In 1999, when Kevin Behr and I started studying high-performing
[IT]{.smallcaps} organizations, we found that these were the
organizations that were simultaneously achieving the "highest
[IT]{.smallcaps} service levels (e.g., [MTTR]{.smallcaps},
[MTBF]{.smallcaps}, change success rates), the earliest integration of
information security into the software/service development lifecycle,
the best posture of compliance (e.g., fewest number of repeat audit
findings), and amazingly, the best [IT]{.smallcaps} efficiencies (e.g.,
server/sysadmin ratios)."^[25](#48-resourceNotes.xhtml_note-25)^
We had studied eleven high-performing [IT]{.smallcaps} organizations
that included a bank, a stock exchange, a wireless billing service, a
domain name service provider, and two [IT]{.smallcaps} service
providers.
Kevin and I worked together to understand how these organizations made
their "good to great" [IT]{.smallcaps} transformations, and codified
this transformation in the books *The Visible Ops Handbook: Implementing
ITIL in 4 Practical and Auditable Steps* and *Visible Ops Security:
Achieving Common Security and IT Operations Objectives in 4 Practical
Steps*, written by the same author team as *The Phoenix Project*.
A critical part of this journey was made possible by the *ITIL Service
Support Book* (v2), which no discussion about [IT]{.smallcaps}
Operations would be complete without. I loved this book when I first
read it in 2000, as it catalogued and normalized the key processes that
must exist in any high-performing [IT]{.smallcaps} organization. But,
[ITIL]{.smallcaps} remains a descriptive framework, and organizations
don't do descriptive frameworks---they do projects.
Our goal with the Visible Ops series of books was to create a
prescriptive, ordered set of steps (projects) to replicate the outcomes
we observed in high performers. (Incidentally, this is what we're
attempting to replicate in the upcoming *DevOps Cookbook*).
## []{#47-resourceReading.xhtml__idTextAnchor013}[]{#47-resourceReading.xhtml__idTextAnchor014}Two Great Books on Kanbans {.resource}
Hopefully by now, I've convinced you that the problems associated with
too much [WIP]{.smallcaps} in [IT]{.smallcaps} are truly devastating.
Many practitioners believe that kanbans are one of the most effective
countermeasures, as well as the simplest.
I have two favorite books on kanbans that I'd recommend to anyone who is
even remotely interested in kanbans.
The first book is *Personal Kanban: Mapping Work \| Navigating Life* by
Jim Benson and Tonianne DeMaria Barry. This book is more of a personal
productivity book than a book about complex value streams. In fact, I'd
call this book the modern version of David Allen's famous book *Getting
Things Done: The Art of Stress-Free Productivity*.
Where Allen discussed the nature of work, the importance of calendars
for keeping commitments, and the theory of filing and contextual
[TODO]{.smallcaps} lists, Benson and Tonianne discuss the need to
visualize all our work and control the amount of [WIP]{.smallcaps}. They
advocate that everyone should start their own kanban boards with three
simple lanes: Ready, Doing, and
Done.^[26](#48-resourceNotes.xhtml_note-26)^
Although I remain a devout David Allen *GTD* fan, after reading
*Personal Kanban*, I quickly retired my contextual [TODO]{.smallcaps}
lists that I've been maintaining for nearly a decade in favor of a
kanban board. In many ways, I've found that it solves one of most
challenging aspects of the *GTD* methodology: the weekly executive
reviews, where we're supposed to reprioritize our commitments, prune our
[TODO]{.smallcaps} lists, etc. There were years in which I never did
this supposed weekly activity.
On the other hand, with kanban boards, all my work is visible, and there
are [WIP]{.smallcaps} limits in place that prevent the number going
above a fixed limit. I've seen on Jim Benson's kanban board in his
office and his Doing [WIP]{.smallcaps} limit is four (i.e., no more than
four cards are allowed in the Doing lane).
The second book I'd recommend is David J. Anderson's book *Kanban:
Successful Evolutionary Change for Your Technology Business*; it's more
specific to the use of kanban boards in organizations.
For me, reading this book was unexpectedly delightful, as it further
chronicled a Microsoft [IT]{.smallcaps} case study that I had chosen to
study as part of my [EM]{.smallcaps} 526 Constraints Management course.
It was a 2005 paper called, "From Worst to Best in 9 Months:
Implementing a Drum-Buffer-Rope Solution in Microsoft's [IT]{.smallcaps}
Department" by David J. Anderson and Dragos
Dumitriu.^[27](#48-resourceNotes.xhtml_note-27)^ Small world, isn't it?
Both Anderson and Dumitriu were at Microsoft at the time, and they
described an abysmal previous state that is likely familiar to most
[IT]{.smallcaps} practitioners:
- Too long to finish work requested from the business: average lead time
was 155 days
- Dissatisfaction with lateness and long lead times forced
[IT]{.smallcaps} management to do "more work estimation," forcing
managers to spend all their time building PowerPoints (because
business conclusion was that they didn't do a good job estimating),
instead of doing real work
- Whenever the business asked for anything, the response was "it'll take
5 months"
- Every task was estimated at 20 days, but no one knew where the other
135 days went
Dumitriu created a new field in their ticketing system (actually, it was
the Microsoft defect tracking system) called "Waiting For Dragos," to
capture when any work was blocked. He quickly concluded that seventy
percent of all the team's time was blocked on other people---in other
words, seventy percent of the time the work was in queue.
Dumitriu concluded that his team was only completing three work items
per month, and at that rate, it would require three years to complete
all that work. Here were the countermeasures that he put into place and
the amazing results:
- They stopped estimating their work and instead used actual times based
on historical data---they had eighty person-years of work in their
ticketing system, so they used that. This resulted in an immediate
thirty percent boost to Dev and Test productivity.
- They stopped using cost accounting, using instead a simple
"[ROI]{.smallcaps} based on budget contribution." This time-savings
resulted in an immediate twenty percent boost to [PM]{.smallcaps}
capacity.
- Realizing that their constraint was Dev, [PM]{.smallcaps} took over
many of the Dev tasks, increasing Dev capacity by twenty percent. It
also led to happier Developers, because they were coding, instead of
doing task estimation.
- They brought in a usability expert to modify the change request forms.
(He quipped, "In order to get a glass of water, we had to fill out a 4
page form; we replaced it with a 2 page form, with lots of free-form
fields, with the goal of making sure the person doing the work had all
the information they needed.")
- They then reduced the [WIP]{.smallcaps} allowed in the system:
initially they had, on average, forty to sixty open items. They
reduced this down to five.
- They then created a buffer of work, so that any blocked Dev or Test
person could work on something in the buffer.
- Their lead time went from 155 days to twenty-two days. Lead times were
so good that they created a new [SLA]{.smallcaps} guarantee of
twenty-five days (Wow!).
- Their next surge in productivity came from increasing the number of
developers, because for every two days of Dev work, it required one
day of Test work. They promoted testers who wanted to move into Dev,
and increased the Dev:Test ratio from 1:1 to 2:1.
- The result of all of this? They completed their entire three years of
backlog in nine months; demand for their services went up, and they
continued to deliver everything that was asked for each month; no one
got fired, and instead people got promoted.
As Dumitriu said, "We succeeded because we focused relentlessly on
reducing lead time, as opposed to Dev & Test optimizing for themselves."
This story is just one of many astounding transformations that are
described in brilliant detail. Amazingly, the transformations are not
primarily based on automation. Instead, the incredible improvements come
from modifying policies around the system of work and the policies that
control work in process, ensuring that there are effective
cross-functional teams, subordinating everything to the constraint, and
managing handoffs well.
Incidentally, Anderson chronicles in his book the changes in his
thinking about how to control work in [IT]{.smallcaps} value streams.
It's clear that he was a devout follower of Dr. Goldratt's work (e.g.,
Theory of Constraints, Drum-Buffer-Rope) but concluded that using kanban
boards can achieve most of the benefits through emergent properties.
I highly recommend reading this book, as it chronicles the real-life
improvements that he's made at organizations such as Sprint, Motorola,
Microsoft, and Corbis.[]{#47-resourceReading.xhtml__idTextAnchor015}
::::
[]{#48-resourceNotes.xhtml}
# Notes {.ch-title}
[1.](#41-resourceIntro.xhtml_note-1) Code deployment lead time is the
time required to go from "change committed into version control" by
Development to "successfully running in production."
[2.](#42-resourceWhy.xhtml_note-2) For monolithic Ruby on Rails
front-end.
[3.](#42-resourceWhy.xhtml_note-3) Jez Humble, Gene Kim, and Puppet
Labs, "2013 State of DevOps Infographic," Puppet Labs website, accessed
July 14, 2014,
.
[4.](#42-resourceWhy.xhtml_note-4) Jez Humble, Nigel Kersten, Gene Kim,
and Nicole Forsgren Velasquez, "2014 State of DevOps Report," Puppet
Labs website, accessed July 15, 2014,
.
[5.](#42-resourceWhy.xhtml_note-5) Along with the adoption of Lean
principles, other techniques widely adopted included the Toyota
Production System, Lean Manufacturing, Theory of Constraints, Six Sigma,
and so forth.
[6.](#42-resourceWhy.xhtml_note-6) Order lead time is the time required
to go from "order accepted by plant management staff" to "order shipped
to the customer."
[7.](#42-resourceWhy.xhtml_note-7) Dr. Eliyahu Goldratt, *Beyond the
Goal: Eliyahu Goldratt Speaks on the Theory of Constraints* (Prince
Frederick, Maryland: Gildan Media Corporation, 2005).
[8.](#43-resourceWhere.xhtml_note-8) John Willis, "The Convergence of
DevOps," *IT Revolution Press* (blog), 2012, accessed July 14, 2014,
.
[9.](#43-resourceWhere.xhtml_note-9) John Allspaw and Paul Hammond, "10+
Deploys Per Day: Dev and Ops Cooperation at Flickr," O'Reilly Velocity
Conference website, June 23, 2009, accessed July 14, 2014,
.
[10.](#45-resourceTop.xhtml_note-10) [LAMP]{.smallcaps} is the
abbreviation for "Linux, Apache web server, My[SQL]{.smallcaps}
database, [PHP]{.smallcaps} or Python or Perl."
[11.](#45-resourceTop.xhtml_note-11) Richard Foster and Sarah Kaplan,
*Creative Destruction: Why Companies That Are Built to Last Underperform
the Market---and How to Successfully Transform Them*, (New York:
Broadway Books, 2001).
[12.](#45-resourceTop.xhtml_note-12) Jim Gray, "A Conversation with
Werner Vogels: Learning from the Amazon Technology Platform,"
Association for Computing Machinery website, June 20, 2006,
.
[13.](#45-resourceTop.xhtml_note-13) Raffi Krikorian, "Real-Time Systems
at Twitter," (Velocity Conference presentation), Slideshare website,
June 26, 2012,
.
[14.](#45-resourceTop.xhtml_note-14) Ashlee Vance, "Inside Operation
InVersion, the Code Freeze That Saved LinkedIn," *Enterprise Tech*
(blog), *Bloomberg BusinessWeek*, April 10, 2013,
.
[15.](#45-resourceTop.xhtml_note-15) Michael Rembetsy and Patrick
McDonnell, "Continuously Deploying Culture: Scaling Culture at Etsy,"
(Velocity Europe Conference presentation), Slideshare website, October
4, 2012,
.
[16.](#45-resourceTop.xhtml_note-16) Pedro Canahuati, "From the Few to
the Many: Scaling Ops at Facebook," (OmniTI Surge Conference
presentation), September 12, 2013,
.
[17.](#46-resourceFour.xhtml_note-17) Shane H., "Wait time = (% busy) /
(% idle)," *The Phoenix Project* discussion group, LinkedIn website,
March 29, 2013,
.
[18.](#47-resourceReading.xhtml_note-18) "Jonah trained" is actually an
outdated term. Official certification programs now exist through the
Theory of Constraints International Certification Organization. At the
time of printing, Dr. Holt is still teaching these courses, and the
syllabi are available online. See "EM 526 Constraints Management"
(course), Washington State University website, accessed July 15, 2014,
; EM 530
"Applications in Constraints Management" (course), Washington State
University website, accessed July 15, 2014,
.
[19.](#47-resourceReading.xhtml_note-19) See "Teamwork," the Table Group
website, accessed July 15, 2014, .
[20.](#47-resourceReading.xhtml_note-20) See "Personal History
Exercise," the Table Group website, accessed July 15, 2014,
.
[21.](#47-resourceReading.xhtml_note-21) The Shingo Prize is often
called the "Nobel Prize For Manufacturing." Mr. Rother has been awarded
this prize three times.
[22.](#47-resourceReading.xhtml_note-22) This term refers to how
preindustrial tribes behaved in New Guinea and Micronesia shortly after
World War II. Having observed an influx of material goods brought by
American and Japanese soldiers, these tribes were baffled when the war
and supply deliveries ended. In an effort to bring back the deliveries,
the tribes replicated the observed behaviors of the US Corp of
Engineers, building imitation runways and radio equipment. Despite all
of this, for obvious reasons, the planes never returned.
[23.](#47-resourceReading.xhtml_note-23) See John Willis, "The
Convergence of DevOps," *IT Revolution Press* (blog), 2012,
.
[24.](#47-resourceReading.xhtml_note-24) In fact, I distinctly remember
sitting next to Adrian Cockcroft in one Velocity Conference session,
listening to him rattle off the chapter and verse of the Nygard patterns
as he recognized them in the talk. The person giving the presentation
should have read the book.
[25.](#47-resourceReading.xhtml_note-25) Kevin Behr, Gene Kim, and
George Spafford, *The Visible Ops Handbook: Implementing ITIL in 4
Practical and Auditable Steps*, (Information Process Technology
Institute, 2005).
[26.](#47-resourceReading.xhtml_note-26) Jim Benson, "Building Your
First Personal Kanban," *Personal Kanban* (blog), August 23, 2009,
.
[27.](#47-resourceReading.xhtml_note-27) David J. Anderson and Dragos
Dumitriu, "From Worst to Best in 9 Months: Implementing a
Drum-Buffer-Rope Solution in Microsoft's [IT]{.smallcaps} Department,"
published by Microsoft and Theory of Constraints International
Certification Organization, November 2005,
.
apologize for my highlights showing up in the PDF---I can't find the
original paper online anywhere, and the only version I had was the one I
annotated. You can tell how excited I was to read it back in 2007.
[]{#49-copyright.xhtml}
::: block
The Phoenix Project:
A Novel About [IT]{.smallcaps}, DevOps, and Helping Your Business Win
© 2013 Gene Kim, Kevin Behr *&* George Spafford
:::
::: block
The Phoenix Project Resouce Guide
© 2014 Gene Kim
:::
::: block
All rights reserved.
:::
::: block
[ISBN]{.smallcaps}13: 978-0-9882625-8-4
:::
::: block
IT Revolution Press
Portland, Oregon
info@itrevolution.net
:::
::: block
For ordering copies of this book: orders@itrevolution.net
:::
::: block
Cover design by Joy Stauber
Cover illustration by eboy
Interior design by Abbey Gaterud
Ebook conversion and design in the United States of America by [Digital
Bindery](http://www.digitalbindery.com)
:::